Payment Terms | L/C, T/T, Western Union |
Supply Ability | 20 set per month |
Delivery Time | 10-25 days |
Packaging Details | nude |
Application | Building Works, Construction Projects, bridges, docks, airport |
Power type | Electric |
Mixer | MAO2000 |
Condition | New |
Material | steel |
After-sales service provided | Engineers available to service machinery overseas, Online support, Video technical support, Field installation, commissioning and training |
Color | Customized, blue, changable, Yellow, etc |
Discharging height | 4.1m |
Capacity | 120 CBM per hour |
Product name | Concrete Mixing Plant |
Control system | automatic PLC control |
Cement silo | 100t,150t |
Productivity | ≤120m3/h |
Brand Name | Achieve |
Model Number | HZS120 |
Place of Origin | Changsha,China |
View Detail Information
Explore similar products
SICOMA Concrete Mixer Spare Parts Horizontal Wall Liner
JS500 HZS25 Concrete Mixing Plant Stationary Ready Mixed 3.8m
SICOMA Twin Shaft Concrete Mixer For Ready Mixed Concrete MAO 1500 6.5t
JS1500 Concrete Mixing Plant 75 CBM Per Hour Hopper Batching Plant 100t
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 20 set per month |
Delivery Time | 10-25 days | Packaging Details | nude |
Application | Building Works, Construction Projects, bridges, docks, airport | Power type | Electric |
Mixer | MAO2000 | Condition | New |
Material | steel | After-sales service provided | Engineers available to service machinery overseas, Online support, Video technical support, Field installation, commissioning and training |
Color | Customized, blue, changable, Yellow, etc | Discharging height | 4.1m |
Capacity | 120 CBM per hour | Product name | Concrete Mixing Plant |
Control system | automatic PLC control | Cement silo | 100t,150t |
Productivity | ≤120m3/h | Brand Name | Achieve |
Model Number | HZS120 | Place of Origin | Changsha,China |
High Light | MAO2000 central mix concrete plant ,4.1m central mix concrete plant ,120 CBM readymix concrete plant |
- Users must follow provided site layout to produce installation plan layout. They must strictly follow ground foundation
drawings to construct the foundations to ensure accuracy of their relative locations and foundation horizontality;
- Users may follow site conditions and production requirements to lay water drainage pipelines and the like on their own;
- Foundation construction must be directed by civil engineers;
- Users may provide lightning conductors on their own. And they must consult local meteorologic authorities for lightning
conductor about fabrication and acceptance;
- Warning: Do not dismantle at will any equipment pieces from the mixing plant. If required to do so, just contact us.
- Requirements for equipment installation and installation personnel:
A. One crane of 40t and over (maximum capacity) with 30m hoisting height. According to the weight to be hoisted, cranes
may be prepared by oneself. (refer to overall dimensions and static .
- Pre-installation preparations:
A. Check relative locations in the foundation for accurate sizes. Check the horizontal datum of the foundation.
B. Prepare necessary tool and cranes to suit the weight of the pieces hoisted
- Attention to installation
A. Keep parts and components at correct relative positions
B. Adjust the upper surface of posts and supports to be horizontal
C. Ensure solid and reliable connection of parts and components
D. Do not tension the rubber hoses connecting measuring hopper outlets, otherwise measuring accuracy will be influenced.
E. Ensure hoisting in balance. In case of accidental collisions, check the damage immediately. In case of necessity, just contact us.
- Installation of main parts and components in the following step:
a) Install the lower main frame;
b) Install the first layer ladder;
c) Install the materials collection hopper;
d) Hoist the mixer;
e) Install the additive tank;
f) Install the control room and its supports;
g) Hoist the main mixer frame members at the middle portion. Install the second layer ladder;
h) Hoist the measuring frame and measuring hopper, install the third layer ladder;
i) Hoist the batcher, weld its supports to their connections on the ground;
j) Assemble the slant belt conveyor;
k) Hoist the slant belt conveyor, weld its supports to their connections on the ground. Carry out simultaneous installation of idlers,
counterweights, belts and the like;
l) Hoist the upper main frame components;
m) Hoist the cement silo and its support legs. Weld them together at site. Check the silo installation surface for its horizontality
and center. Hoist the silo railings and dust collectors.
n) Install the spiral conveyor and its auxiliary device;
o) Install the dust collectors of the mixer;
p) Layout and install such pipelines as water, power, compressed air and additives;
q) Layout and install the electrical control system(For details, refer to <<The Operating Instructions for the Control System of HZS 60 Concrete Mixing Plant>>;
r) Carry out the plant decoration;
s) Install the remaining attachments.
MODEL | HZS 60 | HZS 90 | HZS 120 | HZS 180 | HZS 240 | |
Theoretical production(m3/h) | 60 | 90 | 120 | 180 | 240 | |
Mixer | Model | JS1000 | JS1500 | JS2000 | JS3000 | JS4000 |
Power(kw) | 2*18.5 | 2*30 | 2*37 | 2*55 | 2*75 | |
Output(L) | 1000 | 1500 | 2000 | 3000 | 4000 | |
Batcher | Hopper capacity(m3) | 10 | 15 | 18 | 22 | 24 |
Hopper quantity | 3 | 3 | 4 | 4 | 4 | |
Hopper Quantily | 100 | 150 | 250 | 350 | 500 | |
Weighing Scope And Accuracy | Aggregate(kg) | 2000±2% | 3000±2% | 4800±2% | 8000±2% | 10000±2% |
Cement(kg) | 600±1% | 900±1% | 1200±1% | 1800±1% | 2000±1% | |
Powder(kg) | 600±1% | 900±1% | 1200±1% | 1800±1% | 2000±1% | |
Water(kg) | 200±1% | 400±1% | 500±1% | 800±1% | 900±1% | |
Admixture(kg) | 30±1% | 30±1% | 30±1% | 30±1% | 30±1% | |
Total Power(kw) | 132 | 177 | 220 | 280 | 320 | |
Discharge Height(m) | 4.1 | 4.1 | 4.1 | 4.1 | 4.1 | |
Note: 1.The total power does not include the power of screw conveyor; 2.The quantity of hopper can be designed as required; 3.The design can be changed as the customer ask. |
Achieve Innovations (Changsha) Co.,Ltd.
♥. A leading Supplier in the Construction Machinery Industry for Premium quality China-made Products
♥. Specializing in Concrete Machinery, Used & Recondition, Tailor-made Equipment & Parts
♥. We are a professional team, over 10 years experience in this industry.
♥.Achieve batching plant factory focused on the domestic market and sells more than 200 sets of batching
plants in the local market every year. It has participated in many major construction projects in China, and
ranked top five in sales of the batching plant,it is the largest buyer of SICOMA mixer, which is the domestic
first-class mixer brand. Chinese customers have a better understanding of Chinese products,The huge sales
in China help us accumulated rich experience in the production and quality of our batching plant, and the large
procurement also help us reduced the procurement costs. Now, with the professional international trade ability
of the Achieve overseas team, Achieve batching plant has been exported to more than 10 countries in
Southeast Asia, Central Asia and Africa.In the future, Achieve batching plant will serve more countries and customers.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company
Year Established:
2018
Total Annual:
2,000,000.00-4,000,000.00
Employee Number:
8~10
Ecer Certification:
Verified Supplier
◆ Achieve Innovations (Changsha) Co., Ltd. aims at improving the profitability of its customers. ◆ Our team exports products to GERMANY, U.K. AMERICA, AUSTRALIA, NEW ZEALAND, JAPAN, SINGAPORE and several regions across the world, valued more than $5,000,000.00. ◆... ◆ Achieve Innovations (Changsha) Co., Ltd. aims at improving the profitability of its customers. ◆ Our team exports products to GERMANY, U.K. AMERICA, AUSTRALIA, NEW ZEALAND, JAPAN, SINGAPORE and several regions across the world, valued more than $5,000,000.00. ◆...