Supply Ability | 30000MT per year |
Delivery Time | within 50 days |
Packaging Details | seaworthy plywooden case packing. |
Material: | Low Carbon Steel,Carbon Steel,Carbon Alloy Steel,E355,E235,ST37.2 |
Certificate: | TS16949,DNV,PED,ISO |
Origin: | Jiangsu,China |
OD: | 4-383mm |
Thickness: | 0.5-18mm |
Processing: | Seamless |
Brand Name | Hongbao |
Model Number | HBCDSST-1 |
Certification | TS16949,DNV,PED,ISO,TUV,LR |
Place of Origin | Jiangsu, China |
View Detail Information
Explore similar products
160mm OD Cold Drawn Seamless Steel Tube , Bicycles Precision Steel Tube
Oil / Gas Industry Cold Drawn Steel Tube High Precision With Galvanized Surface
EN 10305 Cold Drawn Seamless Steel Tube , 15mm Wall Thickness Welded Steel Tube
Professional Cold Drawn Steel Pipe Cold Condensers 120mm OD E235 E355
Product Specification
Supply Ability | 30000MT per year | Delivery Time | within 50 days |
Packaging Details | seaworthy plywooden case packing. | Material: | Low Carbon Steel,Carbon Steel,Carbon Alloy Steel,E355,E235,ST37.2 |
Certificate: | TS16949,DNV,PED,ISO | Origin: | Jiangsu,China |
OD: | 4-383mm | Thickness: | 0.5-18mm |
Processing: | Seamless | Brand Name | Hongbao |
Model Number | HBCDSST-1 | Certification | TS16949,DNV,PED,ISO,TUV,LR |
Place of Origin | Jiangsu, China | ||
High Light | cold drawn steel pipe ,cold drawn seamless pipe |
EN10305-1 E235 E355 Cold Drawn Seamless Steel Tube Normalized Cold Drawn Precision Steel Tube
Description
Delivery Conditions |
1. BK (+C) | No heat treatment after last cold forming process. |
2. BKW (+LC) | After last heat treatment there is a light finishing pass (cold drawing) | |
3. BKS (+SR) | After the final cold forming process the tubes are stress relieve annealed. | |
4. GBK (+A) | After the final cold forming process the tubes are annealed in a controlled atmosphere. | |
5. NBK (+N) |
After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere. |
DELIVERY CONDITIONS
The tubes can be produced in the following delivery conditions:
BK (+C) Cold finished/hard (cold finished as drawn).
No heat treatment after the last cold forming process.
BKW (+LC) Cold finished/soft (lightly cold worked)
After the last heat treatment there is a light finishing pass (cold drawing).
BKS (+SR) Cold finished/stress relieve annealed.
After the final cold forming process the tubes are stress relieve annealed.
GBK (+A) Annealed.
After the final cold forming process the tubes are annealed in a controlled atmosphere.
NBK (+N) Normalized. (Mainly focus on)
After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere.
Company Details
Business Type:
Manufacturer
Year Established:
1958
Total Annual:
60000000-80000000
Employee Number:
700~1000
Ecer Certification:
Verified Supplier
Jiangsu Hongbao Group (Pipe) Co., Ltd. (Zhangjiagang Hongda Pipe Co., Ltd.) is a high-tech company in Jiangsu province. The company has a registered capital of RMB 89 million, covers an area of 130,000 square meters, employs 600 staff, and has annual sales of RMB 400 million. The company is speciali... Jiangsu Hongbao Group (Pipe) Co., Ltd. (Zhangjiagang Hongda Pipe Co., Ltd.) is a high-tech company in Jiangsu province. The company has a registered capital of RMB 89 million, covers an area of 130,000 square meters, employs 600 staff, and has annual sales of RMB 400 million. The company is speciali...
Get in touch with us
Leave a Message, we will call you back quickly!