Payment Terms | L/C, D/A, D/P, T/T, Western Union |
Supply Ability | 2000 sets per year |
Delivery Time | 7-12 days |
Packaging Details | Standard Export Package |
Type | Core Drilling Rig |
Power Type | Diesel |
Usage | Water Well |
Voltage | 220v/380v |
Power(W) | 22kw |
Weight | 880Kg |
Name | Soil Testing Drilling Rig |
Drill Depth | 200m |
Engine | Diesel or Electric Motor |
Application | Core Sampling, Water Well |
Brand Name | JINZHOU SHITAN |
Model Number | ST-200 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Light Weight Soil Investigation Drilling Equipment For Geotechnical Exploration
High Precision Soil Test Drilling Machine 22kw Power With Large Horsepower GK
100m Soil Test Drilling Machine Geotechnical Drill Rig With Mud Pump
Portable Soil Testing Drilling Rig / Soil Sampling Equipment 1 Year Warranty
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union | Supply Ability | 2000 sets per year |
Delivery Time | 7-12 days | Packaging Details | Standard Export Package |
Type | Core Drilling Rig | Power Type | Diesel |
Usage | Water Well | Voltage | 220v/380v |
Power(W) | 22kw | Weight | 880Kg |
Name | Soil Testing Drilling Rig | Drill Depth | 200m |
Engine | Diesel or Electric Motor | Application | Core Sampling, Water Well |
Brand Name | JINZHOU SHITAN | Model Number | ST-200 |
Certification | ISO9001 | Place of Origin | China |
High Light | soil testing drilling rig ,soil investigation machine |
150m Depth Tractor Mounted Water Well Drilling Rig/Core Drilling Machine
Drilling rig product introduction
series hydraulic drilling rig is a kind od widely used portable drill machine. It is suitable for drilling water well, geological survey, geological core drilling, small grouting holes, lasting holes of railway, water conservancy, bridges, dam foundation and other bulidings, According to different strata, it drills by choosing different bits, suh as, diamond composite films and alloy.
.Product Parameter:
Drilling depth | 230m |
Maximum borehole caliber | 300mm |
Minimum borehole caliber | 75mm |
Diameter of Drill pipe | 42/50/60mm |
Drilling angle | 90°~75° |
Weight(Not include power) | 1150kg |
Unity machine dimension | 2750*950*1770mm |
2.Vertical Spindle | |
Spindle rotating speed | 64/128/287/557r/min |
Spindle stroke | 450mm |
3.Hoist | |
Max. single line lifting capacity | 2400kg |
Reel lifting speed | 1.64m/s |
Steel wire rope diameter | 13mm |
Steel wire rope capacity | 35m |
Hug floodgate diameter | 245mm |
Hug floodgate belt width | 70mm |
Movable distance | 400mm |
4. Mud pump | |
Type | GS-200 |
Type | Horizontal Single Cylinder with double function |
Max. Discharge | Diesel engine 170L/min |
Electrical Motor 140L/min | |
Max. Pressure | 3MPa |
Work Pressure | 1.5MPa |
5. Power | |
Diesel engine | 22HP |
Electric Motor | 15KW |
6. Drilling tower | |
Type | Integrated on drilling rig |
Control system | Hydraulic |
7. Trailer chassis | |
Type | 4 wheels |
Product Feature:
1. Very powerful at soil, sand, hard rock, etc. land condition.
2. Three kinds drill bits (three-wing bit, alloy bit and diamond bit) available for your choice, which can drill
both soft and hard ground, especially diamond drill bit effective in drilling hard rocks.
3. Hydraulic control system for greatly improving the working efficiency, saving labor force.
4. Mounted wheel or trailer, can be hauled easily by car or tractor, convenient to transport.
5. Power can be diesel engine or electric motor, as per your request.
Precautions during operation of water well drilling rig:
1. Before drilling, the drilling rig shall be constructed in strict accordance with the hole location, orientation, angle and depth
2. Ensure that the drill pipe is not blocked, bent or cracked when installing it.
3. When clean water drilling is adopted, water supply is not allowed before spudding, and pressure drilling can only be carried out after the water returns. Sufficient flow shall be ensured, and dry drilling is not allowed. When there is much rock powder in the hole, water shall be increased to extend the pumping time, and drilling can only be stopped after the hole is effectively flushed.
4. During drilling, the distance shall be measured accurately. Generally, the drill pipe must be measured every 10m of drilling or when the drilling tool is changed, and the hole depth shall be verified and relevant records shall be made. 5. Check the gearbox, shaft sleeve, horizontal and vertical shaft gear, etc. for overheating and abnormal sound. If any problem is found, stop the machine immediately to find out the cause and deal with it in a timely manner. Don't leave the problem unsolved. As a result, mechanical damage is very fast and maintenance costs are high over the years.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!