Payment Terms | T/T, Western Union |
Supply Ability | 20000 set/year |
Delivery Time | Within 5 days |
Packaging Details | Standard Export package |
Product name | Gk 200 Core Drilling Rig With 200 Meters Depth 295mm Hole Diameter For Exploration Drilling Equipment |
Drilling Hole Diameter | Customized |
Drilling depth | 200 Meters |
Warranty | 1 Year |
Dimension(L*W*H) | 1180×680×1600mm |
Drill pipe diameter | 50 mm |
Weight | 200KG |
Power Type | Diesel |
Color | Yellow,Red and Blue |
After-sales service provided | Video technical support |
Application | Soil Sampling,Water well drilling |
Feature | High Drilling Efficiency |
Brand Name | ShiTan |
Model Number | GK 200 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
High Performance Diamond Core Drilling Rig For Geology / Mineral Exploration
GK180 Core Drill Rig / Mining Core Drilling Equipment Color Customized
XY-1 Portable Core Drill Rig 30 - 180m Drilling Depth For Water Well / Railways
Popular Portable Rock Drilling Machines , XY-1 Deep Water Well Drilling Rig
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 20000 set/year |
Delivery Time | Within 5 days | Packaging Details | Standard Export package |
Product name | Gk 200 Core Drilling Rig With 200 Meters Depth 295mm Hole Diameter For Exploration Drilling Equipment | Drilling Hole Diameter | Customized |
Drilling depth | 200 Meters | Warranty | 1 Year |
Dimension(L*W*H) | 1180×680×1600mm | Drill pipe diameter | 50 mm |
Weight | 200KG | Power Type | Diesel |
Color | Yellow,Red and Blue | After-sales service provided | Video technical support |
Application | Soil Sampling,Water well drilling | Feature | High Drilling Efficiency |
Brand Name | ShiTan | Model Number | GK 200 |
Certification | ISO9001 | Place of Origin | China |
High Light | gk 200 core sample drilling rig ,42mm core sample drilling rig ,200m core sample drilling rig |
Gk 200 Core Drilling Rig With 200 Meters Depth 295mm Hole Diameter For Exploration Drilling Equipment
GK 200 Core Drilling Rig Introduction:
Gk 200 Core Drilling Rig Parameters:
GK 200 Drilling depth | 200m | |
Max open hole caliber | 300mm | |
End hole caliber | 75mm | |
Drilling Rod diameter | 60mm | |
Drilling angle | 90°~75° | |
Drill rig moving stroke | 300mm | |
Power Engine | Diesel engine 22HP | |
Spindle speed | 64 128 287 557 r/min | |
Spindle stroke | 450mm | |
Max.Single line lifting capacity | 2400kg | |
Max.Single line lifting speed | 0.41 0.82 1.64m/s | |
Wirerope caliber | 13mm | |
Mud pump detail | Diesel 170L/min | |
Work pressure | 1.5Mpa | |
Water inlet pipe diameter | 40mm | |
Water outlet pipe diameter | 30mm |
Gk 200 Core Drilling Rig Advantages:
Why is the water well drilling rig not suitable for use in rainy days?
After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!