Payment Terms | T/T, Western Union |
Supply Ability | 1000 sets/month |
Delivery Time | 5-8 days after payment |
Packaging Details | Wooden case (bare) |
Product Name | ST 260 Water Well Drilling Rig |
Drilling depth | 260 Meters |
Drilling diameter | 105-260mm |
After-sales service provided | Video technical support |
Warranty | 24 months |
Power type | Diesel |
Color | Yellow,Red and Blue |
Weight | 6T |
Rotary Head Storke | 3.4m-6.0m |
Rated Power | 55-132KW |
Optional accessories | 77KW |
Weight of the rig | 4m×1.7m×2.2m |
Air pressure | 16-55m³/min |
Brand Name | SHITAN |
Model Number | ST260 |
Certification | ISO |
Place of Origin | China |
View Detail Information
Explore similar products
High Efficiency Portable Well Drilling Rig , XY-2B Hydraulic Borehole Drilling
Deep Water Well Drilling Rig Compact Structure With 150 - 180M Drilling Depth
New Condition Hydraulic Water Well Drilling Machine , Water Borehole Drilling
High Efficiency Water Well Drilling Rig XY-3 300m Depth For Geothermal
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 1000 sets/month |
Delivery Time | 5-8 days after payment | Packaging Details | Wooden case (bare) |
Product Name | ST 260 Water Well Drilling Rig | Drilling depth | 260 Meters |
Drilling diameter | 105-260mm | After-sales service provided | Video technical support |
Warranty | 24 months | Power type | Diesel |
Color | Yellow,Red and Blue | Weight | 6T |
Rotary Head Storke | 3.4m-6.0m | Rated Power | 55-132KW |
Optional accessories | 77KW | Weight of the rig | 4m×1.7m×2.2m |
Air pressure | 16-55m³/min | Brand Name | SHITAN |
Model Number | ST260 | Certification | ISO |
Place of Origin | China | ||
High Light | Crawler Mounted Drilling Rig 77kw ,260M Crawler Mounted Drilling Rig ,77kw pneumatic drilling rig |
ST 260 Water Well Drilling Rig Large Pneumantic Machine
ST 260 Water Well Drilling Rig Product Description
ST-260 drilling rig is especially suitable for water intake in mountainous and rocky strata.Pneumatic water well drilling machine should be used together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc.If you want to buy an air compressor at the same time, please tell us your drilling depth and diameter, and we will give the corresponding recommendation
ST 260 Water Well Drilling Rig Technical Information
Drilling Depth | 260m |
Dia.hole | φ105-260mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.0MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m,6m |
Dia. Of rod | φ76, φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 8500-11000N.m |
Rotation Speed | 40-70r/min |
Diesel Engine | Yuchai |
Engine Power | 85Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5900x2000x2850mm |
Application | Complicated geological conditions:Rock,Mud,Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling |
Dth Hammer | 4",5",6",8" Drill hammer or CIR110, 130, 150,170 |
Product Advantages
This is a high efficiency and multi-functional down the hole water well drilling equipment, It can be used to drill water well, agrecultural irrigation well, geothermal well and other type well holes. It is sepcial suitable for mountain area and rock stratum water sourcing project.
system. The brand diesel is protected by 2 levels air filtration systems and also can directly use the clean air from the air compressor.
The pneumatic drilling rig is multifunction, with different configurations suitable for different geologies.Accept customization,any good ideas please contact us, our engineers will help you get what you want, we can also put the platform on a truck mounted chassis
What can we do for you?
Q: Are you original manufacturer? A:Yes, we are a manufacturer in construction machinery and we have the whole series products
Q: What kind terms of payment can be accepted? A:Normally we can work on T/T.
Q: What about the delivery time? A:7 days after receiving the deposit.
Q: What about the warranty time? A:12 months after shipment,engine is 6 months.
Q: What about the Minimum Order Quantity? A:The MOQ is 1 set.
Q: Could you stick customers brand on the products? A: We warmly welcome the OEM orders.
Courtyard Drilling Attentions
1. Consider whether the well depth is reasonable
We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.
2. Convenience, health and other issues should be considered.
After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.
3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.
Water Well Drilling Work Attentions
1. The drilling unit must first drill holes, take samples and draw the drilling profile structure diagram (histogram).
2. According to the histogram: geological structure, the upper pipe and filter pipe of the well shall be made, and the drilling diameter shall not be less than 300mm.
3. After the well is drilled and the pipe is laid, the backfilling amount of filler shall be 1.8-2.0 m3, and it must be ensured that the outside of the well pipe wall is more than 70 mm. The filter material is siliceous sandy pebble without impurities. It is better to mix according to the pebble particle size (20-40mm). During filling, materials shall be fed layer by layer manually. It is strictly prohibited to backfill filter materials mechanically and soil into the well. Gravel filling method: generally, circulating water or still water is used for gravel filling. If the filling quantity and height of filter material are greatly different from the plan, find out the reasons, deal with them properly, and record the filling results.
4. After well completion, the well pipe shall be vertical and not inclined.
5. The polyethylene plastic pipe wall of the well pipe is 8mm thick. The well pipe adopts a drilling filter. The drilling hole is 18-20mm, and the drilling rate is not less than 25%. The well pipe shall be overlapped and the filter screen shall be fixed. Screw joint is adopted for well pipe lapping and drilling φ 8mm hole, mounting φ 10mm screw. The mesh of the filter screen is about 25 mesh, and the filter screen is wrapped in 2 layers.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!