Payment Terms | L/C, D/A, T/T, Western Union |
Delivery Time | Within 7-12 days |
Packaging Details | Wooden box |
Type | hydraulic crawler drilling machine |
Max. Drilling depth | 400 |
Dimension(L*W*H) | 6m×2m×2.5m |
Power Type | 89 |
Usage | Water Well |
feature | high drilling efficiency |
Drilling diameter | 105-300mm |
Rod length | 6M |
Lifting force | 22T |
Fast lifting speed | 24m/min |
Brand Name | ShiTan |
Model Number | ST400 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Small Crawler 380v Pneumatic Drilling Rig For 200m
260m Percussive Pneumatic Drilling Rig Crawler Machine
Project Deep Water Pneumatic Drilling Rig 400m
Diesel 400m Depth Pneumatic Crawler Drill Water Well Rig
Product Specification
Payment Terms | L/C, D/A, T/T, Western Union | Delivery Time | Within 7-12 days |
Packaging Details | Wooden box | Type | hydraulic crawler drilling machine |
Max. Drilling depth | 400 | Dimension(L*W*H) | 6m×2m×2.5m |
Power Type | 89 | Usage | Water Well |
feature | high drilling efficiency | Drilling diameter | 105-300mm |
Rod length | 6M | Lifting force | 22T |
Fast lifting speed | 24m/min | Brand Name | ShiTan |
Model Number | ST400 | Certification | ISO9001 |
Place of Origin | China | ||
High Light | crawler mounted borehole drilling machine ,diesel engine driven borehole drilling machine ,450m water borehole drilling machine |
Introduction of crawler type water well drilling rig:
Pneumatic Drilling Rig Hengwang pneumatic drilling rig is especially suitable for water intake in mountainous and rocky strata.Pneumatic water well drilling machine should be used together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc.
Product Name | Pneumatic Drilling Rig |
Model | ST400 |
Drilling Diameter | 105-300mm |
Drilling Depth | 400m |
One-time Advance Length of the Drill | 3000/6000mm |
Walking Speed | 6km/h |
Climbing Ability | 25 |
Min. Ground Clearance | 300mm |
Working Air Pressure | 1.7-3.5Mpa |
Air Consumption | 17-35m3/min |
Main Power | 100KW/6Cylinder |
Rotation | 45-75rpm |
Rotary Torque | 9000-10000N.m |
Dimension | 6m×2m×2.5m |
Total Weight | 10T |
Application scope and characteristics of drilling rig
All drilling rigs here are multifunctional, it can be used with air compressor, mud pump, even we can just use the dry hydraulic drilling method.
The drilling rigs are not only designed for water drilling. They can be used in all conditions based on pore-forming purpose.
They are widely used in industrial and agriculture water project, testing well and other exploration borehole. In particular, drilling hole for geothermal heating, it can also meet the engineering basis for reinforcement, loose gravel drilling rock formation connected with a variety of engineering.
Our drilling rigs are more efficiency and with low failure rate, more economic and durable, and with a high comprehensive cost performance.
Host structure and working principle
1. Chassis rubber wheel chassis. Drag to walk.
2. The frame of frame welding structure is welded on the chassis. When the carriage is erected, it can be connected with the frame with bolts
As a whole, improve the rigidity of the carriage.
3. The carriage with welded structure adopts hot-rolled carbon channel steel and square steel pipe as the guide rail of the swivel head,
The oil cylinder is controlled to rise and fall smoothly through the one-way throttle valve. The verticality is controlled by the level and angle gauge on the console.
4. The slewing mechanism is composed of hydraulic motor and slewing reducer. Two high-performance low-speed high torque hydraulic horses
To drive the rotary reducer, you can obtain different torque and speed.
How to maintain water well drilling rig?
The manufacturer of water well drilling rigs said that when we use water well drilling rigs, we should not forget to maintain them. What should we pay attention to? Pay attention to check the lubricating oil condition of the wind motor at any time. Pay attention to check whether the water and gas pipelines and the bolts and nuts of all accessories of the drilling rig are firm at any time. When the working face is immersed in water, use a large-diameter drill head to insert the drill pipe when opening the hole, so that the drill pipe is 1-2 meters above the water surface, so as to prevent mud and rock debris from falling into the hole. It is not allowed to reverse during the drilling operation of the water well drilling rig, so as to prevent the drill pipe from falling into the hole, When the water well drilling rig stops working in a short time, a small amount of air pressure should be given to prevent sediment from immersing into the interior of the drilling rig impactor. If the drilling rig stops working for a long time, the sound of the impactor and the operation of the reducer should be checked. If abnormal sounds and phenomena are found, the machine should be shut down immediately and checked in time.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!