Payment Terms | T/T, Western Union |
Supply Ability | 2000set/year |
Delivery Time | Within 7-12 days |
Packaging Details | Standard Export package |
Type | XY -1 With 100 Meters Depth Water Well Drilling Rig For Farming Borehole Equipment |
Power Type | Diesel |
Usage | water well,railways, core drilling |
Drilling depth | 100m |
Dimension(L*W*H) | 1640*1030*1440mm |
Drill pipe diameter | 42mm |
Borehole dip angle | 90°~75 |
Spindle speed | 142、285、570(r/min) |
Model | YBC-12/125 |
Rated pressure | 12.5Mpa |
Model(diesel engine) | 1105 |
Rated power | 18KW |
WEIGHT | AROUND500KG |
Spindle stroke | 450kmm |
Brand Name | ShiTan |
Model Number | XY-1 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
High Efficiency Portable Well Drilling Rig , XY-2B Hydraulic Borehole Drilling
Deep Water Well Drilling Rig Compact Structure With 150 - 180M Drilling Depth
New Condition Hydraulic Water Well Drilling Machine , Water Borehole Drilling
High Efficiency Water Well Drilling Rig XY-3 300m Depth For Geothermal
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 2000set/year |
Delivery Time | Within 7-12 days | Packaging Details | Standard Export package |
Type | XY -1 With 100 Meters Depth Water Well Drilling Rig For Farming Borehole Equipment | Power Type | Diesel |
Usage | water well,railways, core drilling | Drilling depth | 100m |
Dimension(L*W*H) | 1640*1030*1440mm | Drill pipe diameter | 42mm |
Borehole dip angle | 90°~75 | Spindle speed | 142、285、570(r/min) |
Model | YBC-12/125 | Rated pressure | 12.5Mpa |
Model(diesel engine) | 1105 | Rated power | 18KW |
WEIGHT | AROUND500KG | Spindle stroke | 450kmm |
Brand Name | ShiTan | Model Number | XY-1 |
Certification | ISO9001 | Place of Origin | China |
High Light | 100m water well drilling rig ,farming borewell water well drilling rig ,100m water well rig |
XY -1 With 100 Meters Depth Water Well Drilling Rig For Farming Borehole Equipment
XY-1 Water Well Drilling Rig
XY-1 is widely used for Water well drilling, Geological Exploration and Prospecting, Geothermal wells, Blast-hole, Irrigation projects, etc.It is widely used for Water well drilling, Geological Exploration and Prospecting, Geothermal wells, Blast-hole, Irrigation projects, etc.
XY-1 Water Well Drilling Rig Technical Data
Drill | Swivel Head | ||
Drilling depth
| Max.130m | Spindle speed
| 1010,790,470,295,140(r/min) |
Hole diameter
| Max.130mm | Spindle stroke | 450kmm |
Drill rod diameter | 42mm | Spindle pull-down | Max.15KN |
Angle range | 90-75 | Spindle lifting capacity | Max. 25KN |
Oil pump | Water pump | ||
Model | YBC-12/125 | Model | Horizontal reciprocating single-acting piston pump |
Rated pressure | 12.5Mpa | Working pressure | Max. 1.25Mpa |
Flow speed | 8ml/r | ||
Rated speed | 1500r/min | ||
Hoist | Power(diesel) | ||
Max. lifting capacity | 15KN | Model(diesel engine | ZS1105 |
Hoisting drum revolution | 121,76,36(r/min)
| Rated power | 12.1KW |
Drum diameter | 140mm | Rated speed | 2200r/m |
WEIGHT | AROUND 600KG | ||
SIZE | 1620*970*1560mm |
XY-1 Water Well Drilling Rig Features
XY-1 drill rig is used to survey and exploration, geophysical prospecting, road and construction exploration, punching blastinghole, etc.
Used for general investigation, geophysical exploration, high-way and building construction, and blast-hole drilling etc.
1. With hydro-automatic feeding device, and high drilling efficiency.
2. Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.
3. Close levers, convenient to operate, safe and reliable operations.
4. Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.
Light in weight, easy disassembling for transportation and applicable to working conditions in plain and mountain areas
1. Used for census exploration, geophysical exploration, road and building exploration and blasting drilling and other drilling projects;
2. According to the different strata of the choice of alloy, steel grit and steel bit drilling;
3. Can drill 2-9 grade sandy clay and bedrock layer.
What is the construction technology of de watering well?
Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.
The de watering shall be carried out 20 days before the excavation of the foundation pit, so as to drain the stagnant water in the stratum in advance, reduce the groundwater level, improve the self stabilization capacity of the soil layer, and smoothly carry out the anhydrous operation. During the de watering operation, the water level observation of each well shall be done well, and the change of the head of the confined aquifer shall be mastered in time
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!