Payment Terms | T/T, Western Union |
Supply Ability | 100 sets /month |
Delivery Time | Within 7 days |
Packaging Details | Wooden box |
Product Name | XY-1A Geological Drilling Rig |
Drilling Diameter | 150mm |
Drill depth | 150m |
Power Type | Diesel / 13.3kw |
Usage | Water Well |
Color | Yellow,Red and Blue |
Application | Geological Exploration |
Warranty | 12 months |
After-sales service provided | video technical support |
Brand Name | ShiTan |
Model Number | XY-1A |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
200 Meter Water Borehole Drilling Rig , Borehole Drilling Machine With
800 Meter Water Borehole Drilling Rig Machine With Compressor
HH180 Geological Drilling Rig Machine Gold Mining Machine With Fully Hydraulic
Reliable Geological Drilling Rig Machine, XY-1B Exploration Drill Rigs
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 100 sets /month |
Delivery Time | Within 7 days | Packaging Details | Wooden box |
Product Name | XY-1A Geological Drilling Rig | Drilling Diameter | 150mm |
Drill depth | 150m | Power Type | Diesel / 13.3kw |
Usage | Water Well | Color | Yellow,Red and Blue |
Application | Geological Exploration | Warranty | 12 months |
After-sales service provided | video technical support | Brand Name | ShiTan |
Model Number | XY-1A | Certification | ISO9001 |
Place of Origin | China | ||
High Light | 150mm hole soil testing drilling rig ,mud pump soil testing drilling rig ,150mm hole soil testing drill rigs |
XY-1A 150 mm Hole Diameter Soil Testing Geological Drilling Rig
XY-1A Geological Drilling Rig Introduction
It is a hydraulic feed portable drilling rig, which is suitable for engineering geological exploration of industrial and civil buildings, railways, hydropower, transportation, bridges, dam foundations and other buildings.
XY-1A Geological Drilling Rig Parameters:
Xy -1 A Drilling rig | Drilling hole diameter | mm | 150 |
Drilling depth | m | 150 | |
Drill pipe diameter | mm | 42 | |
Borehole inclination | ° | 90°~75° | |
Rig dimension(L×B×H) | mm | 1640×1030×1440 | |
Drill weight(except engine) | kg | 500 | |
gyroscope | spindle speed(three block) | r/min | 142,285,570 |
spindle travel | mm | 450 | |
max moving speed | m/min | 3 | |
vertical max feed force | KN | 15 | |
vertical max lift | KN | 25 | |
windlass | hoisting capacity(single speed rope) | KN | 10 |
drum speed | r/min | 55,110,220 | |
drum circumferential velocity | m/s | 0.42,0.84,1.68 | |
drum diameter | mm | 145 | |
wire rope diameter | mm | 9.3 | |
rope weight | m | 27 | |
the diameter of the brake | mm | 230 | |
brake band width | mm | 50 | |
water pump | pump type | horizontal single cylinder double acting | |
max displacement | L/min | 95(77) | |
max allowable pressure | Mpa | 1.2 | |
working pressure | Mpa | 1.2 | |
cylinder diameter | mm | 80 | |
oil pump | pump type | gear pump | |
power | KW | 16.2 | |
rated pressure | Mpa | 12.5 | |
motor type | YBC-12/125 | ||
displacement | L/r | 12 | |
rated speed | r/min | 2000 |
XY-1 A Geological Drilling Rig Features
1.When the final holes are respectively 75mm and 46mm in diameter, the rated hole depths are separately 100m and 180m. The maximum of depth my not exceed 110% of that drilled in each hole.The maximum allowable hole diameter is 150mm. 2.With hydraulic feeding device, elevated drilling efficiency, reduced labor strength. 3.The rig is equipped with an upper spherical jaw holding mechanism and hexagonal drive drilling rod which can be replaced without shutdown, high efficiency, safe and reliable. 4.A hole bottom pressure gauge is mounted indicating the pressure in order to control the staus inside the hole 5.Compact structure, small volume, lightweight, high detachablity, easy transportation and suitable for the operations in plains or mountain areas.
Soil Testing Best Time
Soil samples can be taken any time throughout the year. It is important though to sample approximately the same time of the year. Late summer, or early fall, is a good time for most crops. This allows time for lime recommended to react and change the pH before the crop is planted.
Inspection procedures for core drilling rig
I. Routine appearance inspection
(1) Regularly check whether the paint on the surface layer of the drilling rig is loose, mainly whether the operating parts are rusty;
(2) Regularly check whether the reinforcement is loose;
(3) Regularly check the welding position for faulty welding and desoldering.
II. Idle test run
(1) Carry out no-load actual operation of the drilling rig according to the safety operation procedures, and idle for 20 minutes;
(2) Regularly check whether the operation of the hydraulic transmission system is OK, whether the hydraulic seals, oil pipes and connectors have oil leakage, whether the temperature is OK, and whether the vacuum pressure gauge is OK;
(3) Regularly check whether the reinforcement is loose and whether various practical operations are sensitive and reliable.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2010
Total Annual:
50000000-100000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o... Jinzhou City Shitan Machinery Equipment CO. LTD. is a professional production and processing company for core drilling rigs, crawler drilling rigs, various track chassis, various types of mud pumps, various track transport vehicles, etc. It is one of the outstanding manufacturers o...
Get in touch with us
Leave a Message, we will call you back quickly!