Payment Terms | L/C, T/T, Western Union |
Supply Ability | 100 sets per year |
Delivery Time | 60 working days |
Packaging Details | Standard export packing |
Name | Bottle water bottling machine |
Capacity | 1000-24000 bottles per hour(500ml bottle) |
Bottle body diameter | New |
Compressed air | Zhangjiagang city |
Rinsing head | 8-50 heads |
Filling head | 8-50 heads |
Capping head | 3-15 heads |
Capping | Plastic screw cap |
Brand Name | DMK |
Model Number | CGF |
Place of Origin | Zhangjiagang city |
View Detail Information
Explore similar products
1 Liter Mineral Water Bottle Filling Machine / Plastic Bottle Packing Machine
Complete Water Bottle Plant Machine / Drinking Water Filling Capping Machine
Fully Automatic Water Bottling Machine For Plastic Bottle CGF 18-18-6
A To Z Mineral / Drinking / Pure Water Production Plant Bottle Water Filling
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 100 sets per year |
Delivery Time | 60 working days | Packaging Details | Standard export packing |
Name | Bottle water bottling machine | Capacity | 1000-24000 bottles per hour(500ml bottle) |
Bottle body diameter | New | Compressed air | Zhangjiagang city |
Rinsing head | 8-50 heads | Filling head | 8-50 heads |
Capping head | 3-15 heads | Capping | Plastic screw cap |
Brand Name | DMK | Model Number | CGF |
Place of Origin | Zhangjiagang city | ||
High Light | water bottle plant machine ,bottled water equipment ,Negative Pressure Water Bottling Machine |
Negative Pressure Drinking Water Bottling Machine High Speed Filling Valve
Water bottling machine description:
This water bottling machine turnkey project from A to Z combines washing, filling and rotary capping functions in one unit,is a fully automatic and high efficiency liquid packing equipment. Sealing parts are made of heat-proofing rubber, in order to meet the technique requirements of users to sterilization at high temperature. Using programmable controller to realize fully automatic control from bottles entering to finishing packing. It is suitable for packing water. Its performance is as following:all parts, for instance, filling valve, which directly contact medium are made of stainless steel or harmless material. So it conforms to the requirements of Food sanitation.
Water bottling project line:
No | Details |
Normally mineral water bottling turnkey project from A to Z complete line mainly consists of 6 parts. They are respectively: | |
1 | Water Purification Equipment |
2 | Plastic Preform Tube Blower |
3 | Automatic Mineral Water Bottling Machine |
4 | Automatic Labeling Machine |
5 | Automatic Date Printer |
6 | Bottle Packing Machine |
Which means, this line from the raw water treatment to the bottled water packaging , is a complete automatic production line, it can well meet customer needs. We also design a reasonable plan for you to achieve higher production efficiency. |
Water bottling machine parameters:
Item | CGF8-8-3 | CGF12-12-5 | CGF18-18-6 | CGF24-24-8 | CGF32-32-10 |
Capacity bottles per hour | 2000-3000 | 3000-4000 | 5000-6000 | 8000-10000 | 10000-12000 |
Suitable bottle diameter | 50-90mm 200-2000ml | ||||
Rinsing pressure kg/cm2 | 2-3 | ||||
Machine weight KG | 1500 | 2500 | 3500 | 4000 | 5000 |
Machine size L*W*H (mm) | 1900*1600 *2400 | 2400*1600 *2400 | 2400*1830 *2400 | 3100*2200 *2400 | 3600*2500 *2400 |
Water bottling machine component :
1. The three-in-one main machine consists of bottle washing machine, filling machine, capping machine, frame, window sealing, main motor and transmission system, bottle transmission, capping machine and electrical control system.
2. The turnover mechanism of the bottle washing machine is mainly composed of water distribution plate, bottle washing clip, upper turntable, guide rail, protective cover, water spraying device and water receiving plate.
3. The filling institution is mainly composed of the filling bucket, filling valve, guide rail, lifting device, and lifting device for sticking bottles.
4. The sealing mechanism is composed of three parts, namely, lid-laying device, lid-falling guide and lid-turning machine.
5. Auxiliary (or optional) equipment includes flushing water reflux tank, bottle inlet air duct and bottle outlet chain. In addition, manual bottle feeding platform (or bottle sorting machine), multi-row differential chain manual bottle arranging table, and automatic capping machine can be configured according to customer requirements.
Thanks!
For more information please contact us!
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2019
Total Annual:
2,000,000-5,000,000
Employee Number:
>100
Ecer Certification:
Verified Supplier
We are a professional beverage machinery equipment integrated enterprises with independent design, professional production, product sales, after-sales service. With professional engineer team, our company is professional in beverage manufacturing and whole production project solution design.... We are a professional beverage machinery equipment integrated enterprises with independent design, professional production, product sales, after-sales service. With professional engineer team, our company is professional in beverage manufacturing and whole production project solution design....
Get in touch with us
Leave a Message, we will call you back quickly!