Beijing Qinrunze Environmental Protection Technology Co., Ltd.
Payment Terms | D/P, T/T |
Supply Ability | 1 in January |
Delivery Time | 10-45 working days |
Packaging Details | NONE |
Delivery date | 10-45 working days |
Delivery form | Delivery documents+drawings+estimated files |
Brand Name | QRZ |
Model Number | Process Package - Preliminary Design |
Place of Origin | China |
View Detail Information
Explore similar products
Product Specification
Payment Terms | D/P, T/T | Supply Ability | 1 in January |
Delivery Time | 10-45 working days | Packaging Details | NONE |
Delivery date | 10-45 working days | Delivery form | Delivery documents+drawings+estimated files |
Brand Name | QRZ | Model Number | Process Package - Preliminary Design |
Place of Origin | China | ||
High Light | Preliminary Design Process Package Industrial Wastewater ,Drawing Design For Wastewater Treatment Indus |
Provide process technical support:
Meet the depth requirements of the preliminary design scheme for municipal engineering, including the following three parts:
Volume 1: Design Plan (Design Specification).
Volume 2: Preliminary Design Budget;
Volume 3: Preliminary Design Drawings.
The first volume contains:
1. Including basic information explanation (construction unit, preparation unit, hydrological address, topography, traffic and water conservancy of the project location, planning map, planning permit, land use permit, land acquisition situation, approval for electricity, water and gas use, feasibility study and environmental impact assessment), design scale demonstration, water quantity composition and discharge law, water quality of each water stock, design water quality demonstration, discharge standards and discharge water bodies or outlets, and other needs.
2. Including design standards, design principles, analysis of water quality and treatment characteristics, comparison and analysis of processes and main equipment, determination of process routes (responsible for meeting the owner's requirements), detailed process flow diagrams and process descriptions, and a list of removal rates for each process unit.
3. Including the design of each unit (detailed process design parameters, equipment configuration, equipment information), a detailed list of structures, and a detailed list of equipment.
4. Including detailed design of structure, architecture, electrical and self-control, fire protection, HVAC, energy conservation and environmental protection, material selection, anti-corrosion, and insulation.
5. Including labor safety measures, fire protection measures, and construction schedule bar chart.
6. Detailed analysis of operating costs, land area, installed operating power and daily electricity consumption, as well as consumption of water, chemicals, and energy.
7. Other.
Volume 2 Part: Preliminary Design Estimate: Civil Engineering Part Estimate or Cost and Quotation Accounting; List of estimated or cost and quotation for equipment self-control installation and commissioning.
Volume 3 Part: Preliminary Design Drawings: Process, Architecture, Electrical and Automation Disciplines, with special requirements to be followed. Provide professional calculation sheets for processes, architecture, electrical, and self-control.
Service standards:
1. Provide process comparison and determine the process route
2. Provide a detailed flowchart and supporting main instructions
3. Responsible for ensuring that the process meets the owner's requirements
4. Provide equipment list
5. Provide all dimensions of buildings and structures
6. Provide calculation, selection, and explanation of electrical self-control
7. Provide detailed design plans for structure, architecture, electrical and self-control, fire protection, HVAC, energy conservation and environmental protection, material selection, anti-corrosion, and insulation
8. Provide detailed indicators and analysis on land occupation, investment, freight, electricity consumption, etc.
9. Provide detailed calculation sheets and equipment lists.
10. Provide detailed drawings
11. Provide detailed estimates
What the customer needs to provide:
1. Including basic information explanation (construction unit, preparation unit, hydrological address, topography, traffic and water conservancy of the project location, planning map, planning permit, land use permit, land acquisition situation, approval for electricity, water and gas use, feasibility study and environmental impact assessment), design scale demonstration, water composition and discharge law, water quality of each water supply, and other working conditions. Provide completion drawings for various specialties of the existing sewage station, reasons for renovation/existing problems, actual inflow and outflow water quantity and quality, process and equipment operation status for renovation.
2. Emission/reuse standard requirements and other requirements from the competent department and the owner (including water, gas, slag/mud).
3. Provide local hydrological, geological, meteorological and other data.
4. The planning map of the sewage treatment plant or the overall planning map of the entire plant, including transportation, electricity, natural gas, water supply, etc. near the sewage treatment plant.
5. Current available transformer electricity load situation
6. The general budget concept of the owner (optional), requirements for investment and operating cost orientation, equipment brand, pool structure, self-control, etc.
7. Recommended process by the owner (optional)
8. Preliminary project materials (environmental impact assessment, feasibility study approval documents)
9. Time requirements
10. The requirements of the construction unit for construction period, water quantity calculation, water quality monitoring, power distribution and self-control, commissioning and trial operation.
11. Conditions and directions for water, electricity, gas, and communication access/exit.
13. Drawing format. (Optional)
Plan duration and delivery format:
1. Delivery time: 10-45 working days
4. Delivery form: delivery documents+drawings+estimated documents
Fee standard:
1. 10000 to 30000 yuan.
2. Charge 0.3% of the total project investment. The actual calculation fee will be charged for the 10000 to 30000 range above. Fees will be charged based on the first two standards for items below or exceeding.
3. Calculate separately for special or complex processes.
4. The renovation project will be increased by 5-20% based on the above foundation.
5. The above plan is the first volume.
7. The second volume charges based on market prices.
8. The third volume refers to the charging standards for preliminary design drawings in the reference drawing type.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2009
Total Annual:
10000-1000000
Employee Number:
100~500
Ecer Certification:
Verified Supplier
Qinrun Environmental Protection is a high-tech company that has been operating in China for 20 years. The company integrates scientific research and development, design consulting, manufacturing, construction, and operation, providing comprehensive environmental governanc... Qinrun Environmental Protection is a high-tech company that has been operating in China for 20 years. The company integrates scientific research and development, design consulting, manufacturing, construction, and operation, providing comprehensive environmental governanc...
Get in touch with us
Leave a Message, we will call you back quickly!