China factories

China factory - Beijing Qinrunze Environmental Protection Technology Co., Ltd.

Beijing Qinrunze Environmental Protection Technology Co., Ltd.

  • China,Beijing ,Beijing
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Feasibility Study Report On Sewage Treatment Project Proposal Sub Item Price
China Feasibility Study Report On Sewage Treatment Project Proposal Sub Item Price

  1. China Feasibility Study Report On Sewage Treatment Project Proposal Sub Item Price

Feasibility Study Report On Sewage Treatment Project Proposal Sub Item Price

  1. MOQ: 1
  2. Price: ¥5000-¥15000
  3. Get Latest Price
Payment Terms D/P, T/T
Supply Ability 1 per week
Delivery Time 5-8 working days
Packaging Details NONE
Brand Name QRZ
Model Number Feasibility study report
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote

Explore similar products

  1. Product Details
  2. Company Details

Product Specification

Payment Terms D/P, T/T Supply Ability 1 per week
Delivery Time 5-8 working days Packaging Details NONE
Brand Name QRZ Model Number Feasibility study report
Place of Origin China
High Light Elevation Map Sewage Treatment Project ProposalElevation Map Preliminary Overall Layout

1. Includes basic information, design scale, water composition and discharge pattern, water quality of each stream, discharge requirements, and other requirements.
2. Including design standards, design principles, analysis of water quality and treatment characteristics, process comparison and determination of process routes (responsible for meeting the owner's requirements), detailed process flow diagrams and explanations, and a list of removal rates for each process unit.
3. Includes a list of structures and equipment for each unit.
4. General instructions for structure, architecture, electrical and self-control, material selection, anti-corrosion, and insulation methods.
5. Including labor safety measures, fire protection measures, and construction schedule bar chart.
6. According to the needs, cost accounting for civil engineering, equipment, installation and commissioning, detailed breakdown and summary prices based on customer feedback, analysis of operating costs, main indicators such as land area, installed operating power, and daily electricity consumption, elevation flow chart, and preliminary overall layout.
Service standards:
1. Provide process comparison and determine the process route
2. Provide a detailed flowchart and supporting main instructions
3. Responsible for ensuring that the process meets the owner's requirements
4. Provide equipment list
5. Provide all dimensions of buildings and structures
6. Provide main indicators such as land occupation, investment, freight, and electricity consumption.
7. Detailed equipment list, preliminary layout drawings, etc.

What the customer needs to provide:
1. Project location, design scale, water quantity composition and discharge pattern, and water quality of each water stream (some water require water quality laboratory data) and other operating conditions. Provide completion drawings for various specialties of the existing sewage station, reasons for renovation/existing problems, actual inflow and outflow water quantity and quality, process and equipment operation status for renovation.
2. Emission/reuse standard requirements and other requirements from the competent department and the owner (including water, gas, slag/mud).
3. The terrain, land area, surrounding environment, size, and water inflow and outflow direction of the available site can be utilized.
4. The general budget concept of the owner (optional), their preference for investment and operating costs, equipment brand, pool structure, and requirements for self-control.
5. Recommended or preferred process by the owner (optional)
6. Preliminary project materials (environmental impact assessment, feasibility study, etc.)
7. Time requirements;
8. The requirements of the construction unit for construction period, water quantity calculation, water quality monitoring, power distribution and self-control, commissioning and trial operation.
9. Conditions and directions for water, electricity, gas, and communication access/exit.
10. Customer's own introduction materials, etc. (if needed by the customer).

Plan duration and delivery format:
1. 5-8 working days.
2. PDF electronic version.

Fee standard:
1. 5000 to 15000 yuan.
2. Charge 0.2% of the total project investment. The fees for the 5000 to 15000 range above will be calculated based on actual costs. Fees will be charged based on the first two standards for items below or exceeding.
3. Calculate separately for special or complex processes.
4. The renovation project will be increased by 5-20% based on the above foundation.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other

  • Year Established:

    2009

  • Total Annual:

    10000-1000000

  • Employee Number:

    100~500

  • Ecer Certification:

    Verified Supplier

  Qinrun Environmental Protection is a high-tech company that has been operating in China for 20 years. The company integrates scientific research and development, design consulting, manufacturing, construction, and operation, providing comprehensive environmental governanc...   Qinrun Environmental Protection is a high-tech company that has been operating in China for 20 years. The company integrates scientific research and development, design consulting, manufacturing, construction, and operation, providing comprehensive environmental governanc...

+ Read More

Get in touch with us

  • Reach Us
  • Beijing Qinrunze Environmental Protection Technology Co., Ltd.
  • Wangchu Village, Doudian Town, Fangshan District, Beijing
  • https://www.wastewatertreatment-system.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement