Payment Terms | T/T, Western Union |
Supply Ability | 1000pcs per day |
Delivery Time | According to the quantity |
Packaging Details | Wooden pallet |
Product Name | Hexagonal Honeycomb Plate Tube Precipitation Treatment Medium |
Size | 1000*1000mm |
Material | PVC |
Thickness | 0.8mm |
Color | BLACK |
Application | For Clarifier Tank |
Brand Name | HUISEN |
Model Number | HS-TS-PVC |
Place of Origin | China |
View Detail Information
Explore similar products
0.5mm Tube Settler Clarifier
Pvc Plate Lamella Tube Settler / Lamella Clarifier Media For Clarifier Tank
PP Lamella Tube Settler / Lamella Water Treatment Environmental Engineering
Honeycomb Inclined Lamella Tube Black Color PP Hexagonal For Desanding
Product Specification
Payment Terms | T/T, Western Union | Supply Ability | 1000pcs per day |
Delivery Time | According to the quantity | Packaging Details | Wooden pallet |
Product Name | Hexagonal Honeycomb Plate Tube Precipitation Treatment Medium | Size | 1000*1000mm |
Material | PVC | Thickness | 0.8mm |
Color | BLACK | Application | For Clarifier Tank |
Brand Name | HUISEN | Model Number | HS-TS-PVC |
Place of Origin | China | ||
High Light | lamella plate settlers ,lamella water treatment |
Hexagonal Honeycomb Plate Tube Precipitation Treatment Medium
Clarification/Sedimentation is one of the most important stage in the field of waster water treatment. The most efficient sedimentation systems have high settling surface area whilst maintaining a small structure. tube settler media provides a large settling surface area within the specified volume thus giving high flow rates. They have a chevron shaped self-supporting structure in a tubular form with six sides. They are primarily used in applications like water treatment, primary & secondary clarifiers in wastewater treatment.
1. Process efficiency
From multiplication of the sedimentation area, chevron equidistant channel shape and adaptation of the settling area spacing and slope
2. Flexible dimensions
It can be adapted to all kinds of shapes, inclinations, round settlers and allows cut outs.
3. Easy handling
Simple on site assembly method grants low cost, safe delivery to any place in the world.
4. Sophisticated support system
With stainless steel and specially shaped glass fibre reinforced plastic beams minimizing turbulence and sludge deposit.
5. Strong and high quality material
We provides high stability of the modules for easy maintenance – PP material approved for high standards of potable water applications
Technology Parameter
Material | Dimension(mm) | Color | Thickness(mm) | Specific surface area(m2/m3) | Porosity(m2/m3) |
PVC | Dn35 | Black or Blue | 0.4 | 236.0987 | 0.9487 |
Dn50 | 0.5 | 119.0055 | 0.9799 | ||
Dn80 | 0.8 | 99.3071 | 0.6781 |
Ironing method
1. Site preparation
1. Preparation of hot connection power supply and cable;
2. Prepare 2 electric soldering irons;
3. Operators and supervisors are in place;
4. Large volume will occupy a large space after the completion of pressing and jointing of inclined pipe packing, and the stacking site shall be reserved in advance;
2. Ironing operation
1. Open the packing of inclined pipe packing, place the first piece of inclined pipe packing flat on the ground, take the second piece of inclined pipe packing on the first piece of packing, check the cut of inclined pipe packing, ensure that the angle is 60 ° and in the form of hexagonal honeycomb, and start to heat the bonding point after checking;
2. All the plane joints at both ends of the hexagon honeycomb shall be hot welded, and the two plane joints on both sides shall be hot welded for more than four points, and the welding for more than four points is required in the middle of the two inclined tube packing planes to ensure the welding is firm;
3. Pay attention to the operation rhythm, control the temperature, and do not miss the number of welding points;
4. Each packing of inclined pipe is used as a separate ironing unit, which shall be stacked orderly on the site after ironing;
5. During the break, the power supply of the electric soldering iron must be cut off and placed safely;
3. Safety matters
1. Pay attention to the safety of life and prevent scalding and electric shock during the hot joint;
2. Ironing operation requires at least two people to be present, assist each other and cooperate with the operation;
3. Ironing operation is required to be carried out on an open site, and there must be a supervisor during construction;
4. There must be no inflammables on the hot joint site, and there must be fire-fighting facilities on site;
5. In case of any accident, report it in time, and give an alarm in case of emergency.
Company Details
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2006
Total Annual:
8000000-20000000
Employee Number:
>100
Ecer Certification:
Active Member
Jiangsu Huisen Environmental Protection Technology Co.,Ltd.was founded in 2006 and located in the Environmental Protection Industrial Park,Yixing City,Jiangsu Province,China.The company specializes in the production of various kinds of fillers,aerator and environmental protection equipment,etc.The c... Jiangsu Huisen Environmental Protection Technology Co.,Ltd.was founded in 2006 and located in the Environmental Protection Industrial Park,Yixing City,Jiangsu Province,China.The company specializes in the production of various kinds of fillers,aerator and environmental protection equipment,etc.The c...
Get in touch with us
Leave a Message, we will call you back quickly!