Payment Terms | T/T |
Supply Ability | 270 sets/month |
Delivery Time | 20-40 days |
Packaging Details | negociated |
Name | 180T/H Crushing and Screening Plant |
Function | Crushing |
OEM | accept |
Capacity | 180t/h |
Brand Name | Hengyang |
Model Number | HC-572 |
Certification | ISO9001 |
Place of Origin | China |
View Detail Information
Explore similar products
Ultra Fine Powder Mineral Ball Mill Dry Grinding 55t/H
Wet Grinding Powder Making Mineral Processing Plant 25t/H 2000 Mesh
1250 Mesh Mineral Processing Plant 55t/H For Bentonite
Red Powder Grinding Rod Mill For Sand Production
Product Specification
Payment Terms | T/T | Supply Ability | 270 sets/month |
Delivery Time | 20-40 days | Packaging Details | negociated |
Name | 180T/H Crushing and Screening Plant | Function | Crushing |
OEM | accept | Capacity | 180t/h |
Brand Name | Hengyang | Model Number | HC-572 |
Certification | ISO9001 | Place of Origin | China |
High Light | Crushing And Screening Plant ,180T/H Crushing And Screening Plant |
180T/H Crushing and Screening Plant
The crushing process has a design throughput of 180-200 t/h and is schematically illustrated in the Crushing Circuit Process Flow Diagram (PFD), pls see our drawing:
ROM material from the two mines, is hauled by mining trucks to the ROM stockpile, near the ROM bin. A front-end loader (FEL) is used for ore blending at a ratio of 1:1 and feeds the ROM bin. As material has much higher silver grade than that from the Vein Zone, controlled blending is required to provide uniform precious metals loadings for the operation of the CCD and refinery. Blending also ensures consistency of ore comminution characteristics ahead of the SAG mill. The ROM bin is provided with a static grizzly, sloped to bring oversize material back to the loading side for removal by the FEL. Grizzly oversize may be broken on the ROM pad area or sent to the overburden dump.
Material from the ROM bin reports to the vibrating grizzly feeder. The grizzly feeder oversize is fed to the throat of the jaw crusher. The undersize bypasses the crusher, is fed on to the crusher discharge conveyor and joins the crusher product. The vibrating grizzly feeder has a variable speed drive to provide controlled feed to the crusher. Crushed material is conveyed by two conveyors in sequence, to the coarse ore bin, which has a live capacity of 2,000 t. In light of the strong winds and high abrasiveness of the material, an in-line coarse ore bin was selected to provide surge capacity ahead of the milling circuit, rather than a conventional open stockpile or a direct feed arrangement, either with or without an open emergency stockpile. The coarse ore bin is installed above the ground and material is discharged from the bin by two variable speed belt feeders, each capable of feeding at the design SAG mill capacity. The belt feeders report to the SAG mill feed conveyor. A controlled amount of dry quicklime is added onto the SAG mill feed conveyor in preparation for the downstream leaching stage.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2015
Total Annual:
8500000-12000000
Employee Number:
>95
Ecer Certification:
Verified Supplier
Hengyang Industry is an Chinese Company based in Zhengzhou city that manufactures, on proprietary technology, plants and equipment for waste recycling and recovery with energy production, material recovery or production of finished goods. Innovation, R&D, passionate and skilled team along... Hengyang Industry is an Chinese Company based in Zhengzhou city that manufactures, on proprietary technology, plants and equipment for waste recycling and recovery with energy production, material recovery or production of finished goods. Innovation, R&D, passionate and skilled team along...
Get in touch with us
Leave a Message, we will call you back quickly!