Payment Terms | L/C, T/T |
Supply Ability | 2000 tons/month |
Delivery Time | 25-35 work days |
Packaging Details | Steel components are packaged with steel pallets |
Product name | Steel Structure Workshop |
Standard | GB (China standard) |
Connection Form | Bolt Connection |
Type of the main steel frame | H-Steel |
Drawing design | AutoCAD,3D,PKPM,Sketchup |
Grade | Q235 Q355 |
Purlin | C-section or Z-section |
Surface treatment | Hot Dip Galvanised,Blast Cleaning,Paint |
Brand Name | GST |
Model Number | Steel Structure Warehouse |
Certification | ISO 9001, CE certificate of quality system |
Place of Origin | China |
View Detail Information
Explore similar products
80*40 Customized Steel Structure Workshop Fabricated Steel Frame Construction
Prefabricated Warehouse Steel Structure Building Construction Lightweight Q355B
Prefab Lightweight H-Beam Steel Workshop: 12000 ㎡
Waterproof Steel Structure Workshop Fabricated Steel Portal Frame Warehouse GB
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 2000 tons/month |
Delivery Time | 25-35 work days | Packaging Details | Steel components are packaged with steel pallets |
Product name | Steel Structure Workshop | Standard | GB (China standard) |
Connection Form | Bolt Connection | Type of the main steel frame | H-Steel |
Drawing design | AutoCAD,3D,PKPM,Sketchup | Grade | Q235 Q355 |
Purlin | C-section or Z-section | Surface treatment | Hot Dip Galvanised,Blast Cleaning,Paint |
Brand Name | GST | Model Number | Steel Structure Warehouse |
Certification | ISO 9001, CE certificate of quality system | Place of Origin | China |
High Light | GB Prefabricated Steel Structure Garage ,Prefabricated Q235 Steel Structure Garage |
Prefabricated Steel Structure Garage Workshop Industrial Frame Building
The Introduction of This Steel Structure Workshop Building
Component | Description |
---|---|
Steel Columns | Vertical load-bearing members that support the weight of the structure and transfer loads to the foundation. |
Steel Beams | Horizontal load-bearing members that distribute the weight from the roof and upper floors to the columns. |
Trusses and Girders | Structural frameworks designed to bear heavy loads and provide support for the roof and walls. |
Roofing and Wall Panels | Steel sheets used to cover and enclose the workshop, providing weather protection and insulation. |
Insulation | Material used between panels to regulate temperature, control sound, and enhance energy efficiency. |
Sliding Doors | Doors that operate by sliding horizontally along tracks, offering easy access and space-saving benefits. |
Windows | Fixed or operable openings in walls, providing natural light, ventilation, and visibility. |
Mezzanine Floors | Intermediate floors added within the workshop for additional storage or workspace, supported by columns and beams. |
Cranes and Hoists | Lifting equipment installed in the workshop for moving heavy materials or products during manufacturing or assembly. |
Foundation | The base that supports the entire structure, usually made of concrete, which the columns are anchored to for stability. |
Ventilation Systems | Mechanisms for air exchange and proper airflow, essential for maintaining a comfortable and safe working environment. |
Advantages of steel construction
Prefab steel Structure workshop buildings are used for industrial production in which all steel structures are painted and then delivered to the project site for installation.
And because the steel structure can be manufactured in the factory and installed on-site, the construction time is significantly reduced. Due to the steel it can dramatically reduce construction waste and is more environmentally friendly. Therefore, it widely used in industrial buildings and civil buildings.
Our company
---QINGDAO GUSITE CONSTRUCTION ENGINEERING CO.,LTD
Possess the foreign contracted project management qualification certificate issued by the Ministry of Commerce of China, CE certification [EN1090 certificate], IS09001 certificate, etc.
Production capacity
Transport of goods
Description
| |
1 |
All of the steel columns&beams ends and plates will be packed by the blanket to protect them from the crash in the container during the shipment.
|
2 |
To make the loading and unloading more efficient and save the delivery cost, 40' HC is preferred for loading the steel frames.
|
3 |
All the wall&roof panels will be filmed by two sides and fixed stably in the 40' HC container.
|
4 |
All the windows and doors will be protected by bubble-rapping papers and fixed stably in the container.
|
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2014
Employee Number:
50~80
Ecer Certification:
Site Member
Established in 2014, Qingdao Gusite is a high-tech, diversified and export-oriented large-scale international private enterprise, integrating R&D, design, production, installation and construction at home and abroad, and technical services. It has the qualification certificate o... Established in 2014, Qingdao Gusite is a high-tech, diversified and export-oriented large-scale international private enterprise, integrating R&D, design, production, installation and construction at home and abroad, and technical services. It has the qualification certificate o...
Get in touch with us
Leave a Message, we will call you back quickly!