China factories

China factory - CHANGZHOU UNITED WIN PACK CO.,LTD

CHANGZHOU UNITED WIN PACK CO.,LTD

  • China,Changzhou ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China 0.6mpa 400kg H Medicine Spray Granule Powder Coating Dryer Mixing China
China 0.6mpa 400kg H Medicine Spray Granule Powder Coating Dryer Mixing China

  1. China 0.6mpa 400kg H Medicine Spray Granule Powder Coating Dryer Mixing China
  2. China 0.6mpa 400kg H Medicine Spray Granule Powder Coating Dryer Mixing China

0.6mpa 400kg H Medicine Spray Granule Powder Coating Dryer Mixing China

  1. MOQ: 1 set
  2. Price: USD
  3. Get Latest Price
Supply Ability 3 sets/ month
Delivery Time 3 months
Name Granulator Coater
Productive capacity 5-500kg/batch
Power of fan 3-45kw
Power of supply liquid motor 0.37KW
Steam Pressure 0.4-0.6mpa
Steam Consumption 18-400kg/h
Compressed air Pressure Consumption 0.4-0.6mpa
Compressed Consumption air 0.3-1.5m3 /min
Warranty 1 Year
Noise(DB) No more than 75bt separated of fan
Brand Name unitedwin
Model Number FL-B
Place of Origin CHINA

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Supply Ability 3 sets/ month Delivery Time 3 months
Name Granulator Coater Productive capacity 5-500kg/batch
Power of fan 3-45kw Power of supply liquid motor 0.37KW
Steam Pressure 0.4-0.6mpa Steam Consumption 18-400kg/h
Compressed air Pressure Consumption 0.4-0.6mpa Compressed Consumption air 0.3-1.5m3 /min
Warranty 1 Year Noise(DB) No more than 75bt separated of fan
Brand Name unitedwin Model Number FL-B
Place of Origin CHINA
High Light 400kg h Powder Coating Dryer0.6mpa Powder Coating Dryer0.6mpa Granule Coating Dryer

Fluid-Bed Granulator(One-Step Granulator) Fl-B5-1000 Pharmaceutical Powder Granules
Description:
The machine is mainly used for the operations of mixing, granulating, drying and coating of granule “Top Spraying”, etc of powder material in pharmaceutical industry, foodstuff industry, chemical industry, etc. Such as granule of tablet, granule for quick resolving drinking, condiment.
1. The machine is designed and manufactured in accordance with JB20014-2004 < Fluid-bed Granulator In Medicine >
2. Mixing-granulating-drying in one-step.
3. Adopting double chamber filtering bags system, removing dust completely.
4. Adopting multi-fluid nozzle, it guarantees that the formed granule is uniform and the content of powder is very low.
5. Can choose 2 bar explosion-proof design
6. Designed, manufactured and laid out by GMP


Specifications:
 

 5153060120200300500
Productive capacity kg/batch5153060120200300500
Scope of application for liquid(g/cm3
)
<1.3
Material yield rate (%)≥99
Qualified rate of end products (%)≥85
Water content of end products (%)Water content of end products (%)
Granules performance indexConfirm to 2000 edition
Container volume (L)224510022042067010001500
Diameter(mm)50055070010001200140016001800
Power of fan (Kw)35.57.51118.5223045
Power of supply liquid motor (Kw)0.37
Pressure of steam (Mpa)0.4-0.6
Consumption of steam (Kg/h)183560120140180310400
Pressure of compressed air (Mpa)0.4-0.6
Consumption of compressed air (m3 /min)0.30.60.90.90.91.11.11.5
Working temperature(℃)Normal temperature -120℃ could adjust
Noise (DB)Installed separated with fan ≤75
Executive standardJB20045-2005
Overall dimension of machine (L×W×H)Pls refer to installation drawing or customer`s room

 
Application:
 
Company Information:
 

FAQ:
 
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
 
2. How many days will you finish installing?
We will finish installation and training within 15 days.
 
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
 
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
 
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
 
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
 
7. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
 
8. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.









































Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2009

  • Total Annual:

    20,000,000-30,000,000

  • Employee Number:

    10~50

  • Ecer Certification:

    Verified Supplier

Company Introduction:   Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par... Company Introduction:   Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par...

+ Read More

Get in touch with us

  • Reach Us
  • CHANGZHOU UNITED WIN PACK CO.,LTD
  • 16A-103, Jintong International Industrial Park, Wujin National High-tech Zone, Changzhou City, Jiangsu Province, China
  • https://www.uwplast.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement