Supply Ability | 3 sets/ month |
Delivery Time | 3 months |
Payment Terms | L/C, T/T |
Packaging Details | Wooden case |
Name | Circular loom |
Model | UWCL-12/5400 |
NO. of shuttle | 12pcs |
Max.fold width | 2700mm |
Max. Open width | 5400mm |
Warp no.s | 2800mm |
NO. of warp | 2880pcs |
Speed | 5~64rpm |
Main power | 15kw |
Warranty | 1 year |
Brand Name | United Win |
Model Number | UWCL-12/5400 |
Place of Origin | China |
View Detail Information
Explore similar products
Heavy Type 10 Shuttles Circular Loom Machine for Geotextile Container Bag
SPCL Series Twenty Shuttles Circular Loom Machine for Bulk Bag/Geotextiles
SYL Series Six Shuttle Circular Loom Machine PP Woven Bag Production Line Plant
SPCL-10/4400 Ten Shuttle Tarpauln Circular Loom Machine Max. width 2200mm
Product Specification
Supply Ability | 3 sets/ month | Delivery Time | 3 months |
Payment Terms | L/C, T/T | Packaging Details | Wooden case |
Name | Circular loom | Model | UWCL-12/5400 |
NO. of shuttle | 12pcs | Max.fold width | 2700mm |
Max. Open width | 5400mm | Warp no.s | 2800mm |
NO. of warp | 2880pcs | Speed | 5~64rpm |
Main power | 15kw | Warranty | 1 year |
Brand Name | United Win | Model Number | UWCL-12/5400 |
Place of Origin | China | ||
High Light | pp woven bag circular loom Machine ,10 Shuttle circular loom Machine ,FIBC Bag circular loom |
12 Shuttle PP Circular Loom Machine For Geotextile Container bag Tarpaulin
Description:
UW series circular loom, which adopts the SCM (Single Chip Microcomputer), carry out centralized control to the system; the parameter is set up and changed on HMI (Human Machine Interface). Main motor and take-up motor are respectively driven by dual inverters. The system can change and update the data in time, reaching high accuracy and move ahead simultaneously. The function of accurate weft cloth compensate, can carrying on by weft density adjustment in time, improving fabric's quality and the qualification rate. Mechanical malfunction can be displayed in sub-area and recorded in detail. Users may conveniently process the production management and control the system in real time on the HMI.
For same folded diameter, weaving speed and weft, time interval of weft change will be 2 times of 6 shuttles, 1.5 times of 8 shuttles and 1.2 time of 10 shuttles respectively, such that continuous running time of 12 shuttles will be longer than that of 6 shuttles,8 shuttles and 10 shuttles, if figured for 2-3 man operating two set of 12 shuttles circular loom, the efficiency and economy will be perfect.
Specifications:
No.s | Mould | Shuttle Qty.(pcs) | Max.fold width(mm) | Max. Open width(mm) | Warp no.s(pcs) | Speed(RPM) | Main power(KW) |
1 | UWCL-24/16000 | 24 | 8200 | 16400 | 8000 | 5~25 | 37 |
2 | UWCL-20/11000 | 20 | 5500 | 11000 | 5376 | 5~28 | 22 |
3 | UWCL-16/8300 | 16(12) | 4150 | 8300 | 4800 | 5~41 | 18.5 |
4 | UWCL-12/7800 | 12(14) | 3900 | 7800 | 4400 | 5~41 | 18.5 |
5 | UWCL-12/7200 | 12(14) | 3600 | 7200 | 3780 | 5~45 | 18.5 |
6 | UWCL-12/6500 | 12 | 3250 | 6500 | 3520 | 5~51 | 11/15 |
7 | UWCL-12/6000 | 12(10) | 3050 | 6100 | 3200 | 5~51 | 11/15 |
8 | UWCL-12/5400 | 12(10) | 2700 | 5400 | 2880 | 5~64 | 11/15 |
9 | UWCL-10/4800 | 10(8) | 2400 | 4800 | 2880 | 5~64 | 11 |
10 | UWCL-10/4400 | 10(8) | 2100 | 4500 | 2740 | 5~72 | 7.5/11 |
11 | UWCL-8/3500 | 8 | 1650 | 3600 | 1996 | 5~80 | 7.5 |
12 | UWCL-6/3200 | 6(8) | 1400 | 3000 | 1820 | 5~80 | 7.5 |
13 | UWCL-6/2700 | 6 | 1350 | 2700 | 1510 | 5~100 | 7.5 |
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
7. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time.
Our engineers will take a solution video according your description.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2009
Total Annual:
20,000,000-30,000,000
Employee Number:
10~50
Ecer Certification:
Verified Supplier
Company Introduction: Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par... Company Introduction: Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par...
Get in touch with us
Leave a Message, we will call you back quickly!