Supply Ability | 3 sets/ month |
Delivery Time | 3 months |
Name | Circular loom |
NO. of shuttle | 6 shuttles |
Layflat width | 900-1350mm |
Mechansim | Belt |
Shuttle speed | 110r/min |
NO. of warp | 1200pcs |
Core Components | Motor, Pressure vessel, Pump, PLC, Gear, Bearing, Engine |
Material | Plastic |
Machine Type | Bag Forming Machine |
Brand Name | unitedwin |
Model Number | SBY-1350×6 |
Place of Origin | Changzhou,China |
View Detail Information
Explore similar products
Heavy Type 10 Shuttles Circular Loom Machine for Geotextile Container Bag
SPCL Series Twenty Shuttles Circular Loom Machine for Bulk Bag/Geotextiles
SYL Series Six Shuttle Circular Loom Machine PP Woven Bag Production Line Plant
SPCL-10/4400 Ten Shuttle Tarpauln Circular Loom Machine Max. width 2200mm
Product Specification
Supply Ability | 3 sets/ month | Delivery Time | 3 months |
Name | Circular loom | NO. of shuttle | 6 shuttles |
Layflat width | 900-1350mm | Mechansim | Belt |
Shuttle speed | 110r/min | NO. of warp | 1200pcs |
Core Components | Motor, Pressure vessel, Pump, PLC, Gear, Bearing, Engine | Material | Plastic |
Machine Type | Bag Forming Machine | Brand Name | unitedwin |
Model Number | SBY-1350×6 | Place of Origin | Changzhou,China |
High Light | 8 Shuttle Circular Looms ,Circular Loom Potato Bag Making Machine ,8 Shuttle pp bag making machine |
Model SBY-1350×6 Circular Loom Machine ForPotato Bag Video technical support
Description:
SBY series circular lloom, which adopts the SCM (Single Chip Microcomputer), carry out centralized control to the system; the parameter is set up and changed on HMI (Human Machine Interface). Main motor and take-up motor are respectively driven by dual inverters. The system can change and update the data in time, reaching high accuracy and move ahead simultaneously. The function of accurate weft cloth compensate, can carrying on by weft density adjustment in time, improving fabric's quality and the qualification rate. Mechanical malfunction can be displayed in sub-area and recorded in detail. Users may conveniently process the production management and control the system in real time on the HMI.
SCM control and dual-inverter drive. The data are transmitted at a high speed, high precision control, as well as the strong ability of anti-interference. By adopting the Human Machine Interface, the modification and settlement of the parameters can all be run on the HMI, which simplified the operation process and improved the precision of controlling.
Specifications:
Item | SBY-650×4 | SBY(Z)-850X6H | SBY-1350×6 | SBY-2200×6 | SBY-2250×10 |
Number of shuttles(pcs) | 4 | 6 | 6 | 6 | 10 |
Folding width of cloth | 150-650mm | 300~850mm | 900-1350mm | 1500~2200mm | 1750~2250mm |
Number of warp | 576 pcs | 720pcs | 1200pcs | 2880pcs | 2880pcs |
weft density | 8-16(pcs/inch) | ||||
Max. speed | 180r/min | 150-180r/min | 110r/min | 80r/min | 70r/min |
Power of main motor | 2.2 KW | 3kw | 5.5 KW | 7.5kw | 11kw |
Specification of Bobbin(ID×L) | Ф28-38×230mm/218mm | ||||
Max.weft Bobbin diameter | Ф 100 | Ф 115 | Ф 90 | ||
Overall dimension(L×W×H) | 8500×2500×2900 | 10500×2800×2920 | 10850×3000×3500 | 16480×3600×4580mm | 16480×3600×4580mm |
Weight (about) | 2000kg | 2500kg | 4200kg | 8000kg | 9000kg |
Package and Delivery:
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine has one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date
6. How could you do after one year warranty period?
We also can-do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2009
Total Annual:
20,000,000-30,000,000
Employee Number:
10~50
Ecer Certification:
Verified Supplier
Company Introduction: Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par... Company Introduction: Our company is a professional manufacturer and exporter with design, development and production of pp woven machines, non-woven machines, monofilament production line adhesive tape machine, multifilament extrusion intertwisting machine, circular looms and spare par...
Get in touch with us
Leave a Message, we will call you back quickly!