Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 1 Unit/ week |
Delivery Time | 7 Work Days |
Packaging Details | Export Wooden Box |
Model | KJ-2010 |
Application | Chemicals Processing |
Brand name | KEJIAN |
Type | Drying Oven |
Voltage | 220V/380V, 220-380V |
Power(W) | 3-75KW |
Heating up time | 10 mins/100 centidegree |
Temp Range | 200-500 centidegree |
Size | customized |
Brand Name | KEJIAN |
Model Number | KJ-2010 |
Certification | ISO,CE |
Place of Origin | China |
View Detail Information
Explore similar products
OEM Environmental Test Chambers / Lamp Fabric UV Accelerated Weathering Testing
Adjustable Environmental Test Chambers Quv Accelerated Weathering Tester
English Optional Environmental Test Chambers Sand And Dust Test Chamber With
AC 380V 3 phase 4 lines High Efficiency Ozone Testing Equipment , Temperature
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 1 Unit/ week |
Delivery Time | 7 Work Days | Packaging Details | Export Wooden Box |
Model | KJ-2010 | Application | Chemicals Processing |
Brand name | KEJIAN | Type | Drying Oven |
Voltage | 220V/380V, 220-380V | Power(W) | 3-75KW |
Heating up time | 10 mins/100 centidegree | Temp Range | 200-500 centidegree |
Size | customized | Brand Name | KEJIAN |
Model Number | KJ-2010 | Certification | ISO,CE |
Place of Origin | China | ||
High Light | 200 Centidegree Environmental Test Chambers ,500 Centidegree Environmental Test Chambers ,500 Centidegree High Temperature Oven |
Heat Treating Oven for Industrial Use on Industry Drying oven can provide a stable test space for pre-heating, drying, changes about physics and chemistry testing . LIYI Heat Treating Oven for Industrial Use on Industry Drying oven supply precision temperature controller with high stability of platinum resistance to temperature that makes temperature well-distribution.
1) Outside SECC steel, fine powder coating treatment; Inner SUS#304 stainless steel.
2) Use new high temperature resistant long shaft motor
3) Turbine fan.
4) Silicone forced tight
5) Over-temperature protection, super load automatic power system.
6) Circulation system: air force level cycle.
7) Heating system:PID+S.S.R.
8) The thermostat: PID microcomputer control, automatic constant temperature, temperature quickly compensation function
9) Timer: temperature to time, when the power failure alarm indication.
10) According to customer demand matching glass window can be customized according to customer specifications specified.
2. Specification
Interior size (W×H×D) | Exterior size (W×H×D) | Temperature range | Heating time | Accuracy |
Uniformity | Power | Partition (net bar shape) | |
35×35×35cm | 53×65×55cm | 200℃ | RT-100℃ About 10min | ±1℃ | ±5 | 220V or 380V | 1.5kW | 2 |
45×40×40cm | 66×98×53cm | A:200℃ B:300℃ C:400℃ D:500℃ | ±0.5℃ | ±1 | 3.5kW | 2 | ||
50×60×50cm | 75×121×68cm | ±0.5℃ | ±1 | 4.5kW | 2 | |||
60×90×50cm | 85×160×68cm | ±0.5℃ | ±1 | 5.5kW | 2 | |||
80×100×60cm | 110×168×78cm | ±0.5℃ | ±1 | 6.5kW | Customized | |||
90×120×60cm | 120×180*78cm | ±0.5℃ | ±2 | 7kW | ||||
140×120×60cm | 175×192×78cm | ±1℃ | ±2 | 11kW | ||||
160×140×80cm | 200×215×98cm | ±1℃ | ±2 | 13kW | ||||
180×140×100cm | 220×215×118cm | ±1℃ | ±2 | 19kW |
Details
KEJIAN Instrument Service:
If you face any problems in future during testing process we promise we will give you a reply within 48 hours and solution provide within 3 working days. We can offer operation video and English operation muanual. We can provide video-con.
Onsite Service:
1. Device installation
2. Equipment Operation Test Technology training
3. Equipment Calibration
4. Daily maintenance and maintenance of equipment
Free technical training for visiting factories 24-hour Online contact
Free software upgrades
Free information:
1. Product Instruction;
2. Product operation instruction/video;
3. Experiment Test (test application, test report)
Device Problem Handling:
1. Social media 24 hours online communication;
2. Mail Seamless Docking;
3. Video Conferencing;
4. Artificial free door-to-door service.
FAQ:
1. Why Choose Us?
(1) Focusing on this testing field for over 15 years makes us professional.
(2) Located in Dongguan city--the world class manufacturing city.
(3) After-sales service for 12 months, promptly deal with all the problems.
2. Are you a factory?
Yes, we are.
3. What's the product delivery time?
Within 10 work days after deposit received.
If we have stock, the delivery time will be greatly shortened.
4. What's your terms of trade?
We accept EXW, FOB, CIF, CNF and so on.
Company Details
Business Type:
Manufacturer
Year Established:
2003
Total Annual:
2000000-3000000
Employee Number:
80~100
Ecer Certification:
Verified Supplier
GUANGDONG KEJIAN INSTRUMENT CO.,LTD was established in 2003, is a professional research and development the production of hign precision equipment and provide testing solutions for high-tech enterprises. KEJIAN professional technical team and sophisticated production and managem... GUANGDONG KEJIAN INSTRUMENT CO.,LTD was established in 2003, is a professional research and development the production of hign precision equipment and provide testing solutions for high-tech enterprises. KEJIAN professional technical team and sophisticated production and managem...
Get in touch with us
Leave a Message, we will call you back quickly!