China factories

China factory - TAKDA PRECISE MOULD FACTORY

TAKDA PRECISE MOULD FACTORY

  • China,Dongguan ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Submarie Gate ISO9001 +/-0.01mm Hot Runner Injection Mold
China Submarie Gate ISO9001 +/-0.01mm Hot Runner Injection Mold

  1. China Submarie Gate ISO9001 +/-0.01mm Hot Runner Injection Mold

Submarie Gate ISO9001 +/-0.01mm Hot Runner Injection Mold

  1. MOQ: 1 mold
  2. Price: Negotiate
  3. Get Latest Price
Payment Terms T/T, L/C, Western Union
Supply Ability 65 molds / month
Delivery Time 20 days after 2D 3D confirmed
Packaging Details Woodencase for packaging mold & Carton Box for packaging products
Mold Type Hot Runner Injection Mold
Mould life 500000-600000 shots
Design software UG , PROE , CAD
Material ABS / PP / PC / POM / PA66
Mould Material H13 , 2738 , S136 , SKD61
Mould base Futaba , Lkm , Hasco , Dme
Part Tolerance ± 0.005mm
Tolerance Up to 0.01mm
Brand Name GT
Model Number Hot Runner Injection Mold
Certification ISO 9001 , IGS
Place of Origin Dongguan China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C, Western Union Supply Ability 65 molds / month
Delivery Time 20 days after 2D 3D confirmed Packaging Details Woodencase for packaging mold & Carton Box for packaging products
Mold Type Hot Runner Injection Mold Mould life 500000-600000 shots
Design software UG , PROE , CAD Material ABS / PP / PC / POM / PA66
Mould Material H13 , 2738 , S136 , SKD61 Mould base Futaba , Lkm , Hasco , Dme
Part Tolerance ± 0.005mm Tolerance Up to 0.01mm
Brand Name GT Model Number Hot Runner Injection Mold
Certification ISO 9001 , IGS Place of Origin Dongguan China
High Light +/-0.01mm Hot Runner Injection MoldISO9001 Hot Runner Injection Mold+/-0.01mm hot runner mold

 

 



 

How do you ensure on time delivery?

 


1) Detailed planning, details to per hour/person/machine number/stakeholder…

2) Main material driving management system

3) Daily progress meeting, a recovery plan will be reviewed by management team once any key chain is delay.

4) If delay happen on delivery, Goutech will provide customer 1% discount for one week delay, up limit to 10%

 

 

Steps of injection plastic parts

  1. Negotiations: Quality,material,price,payment,delivery time item and so on

  2. Place an order: According customer's drawing or sample

  3. R&D: According customer's requirements,we could design or improve 3D modeling

  4. Design confirmation: We send 3D drawing to customer for confirmation before we make the mould

  5. Mould processing: CNC EDM machine processing then assembly and trial

  6. Sample confirm: We will send trial sample to customers.Before shipment,If the sample isn’t satisfied by customers.We will modify mould until they are satisfied.

  7. Mass production: If customers need mass production of plastic products,We can offer

  8. Manufacturing Package and Delivery


 

Mould Design sofeware UG/CAD/PROE
Mould Base 45#,S50C,LKM,HASCO,DME,etc.
Cavity/core material 2738,2343,S130,2344,718,8407,S136,P20,KD-61,NAK80,H13 ect
Runner Yudo cold/hot runner
Mould lifetime Normally 500,000 shots
Lead time 20-40days based on different products
Gate Submarie gate,side/edge gate
Packing Wooden Case



 

Competitive Advantage:

 

1. We keep long term cooperation with some world Top Brand on electronic product area, such Epson,

Canon and Sony.

2. We have successfully gained the quality certificate of ISO 9001 and IGS.

3. We can design and manufacture the mould in different specification and standard, such as DME,HASCO

and DAIDO.

4. The factory is well equiped with the most advanced testing instrument, it is effective to ensure the precision

of the mould.

5. Strict quality control;

6. Good After-sale service;

7. On time delivery

 

 

Detail information of  mould steel:
 
Mould material
mould hardness
mould life
P20
HRC 29-33
300000 shot
H13
HRC>43
1000000 shot
718
HRC 30-36
500000 shot
S136
HRC 48-52
50000 shot
2344
HRC>48
800000 shot
 


 


 

 

 

 

 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Seller,Other

  • Year Established:

    2005

  • Total Annual:

    8 million-9 million

  • Employee Number:

    200~300

  • Ecer Certification:

    Active Member

Company Profile:   Dongguan Gaotian precision mold factory was established in 2005, specializing in injection mold development, design and production.   Eing the leading plastic mold maker in China, Gaotian precision mold factory has been actively and sincerely striving to ... Company Profile:   Dongguan Gaotian precision mold factory was established in 2005, specializing in injection mold development, design and production.   Eing the leading plastic mold maker in China, Gaotian precision mold factory has been actively and sincerely striving to ...

+ Read More

Get in touch with us

  • Reach Us
  • TAKDA PRECISE MOULD FACTORY
  • 103, 1st Floor, Building A, Jinfeng Industrial Park, No. 8 Songlin West Road, Zengtian, Xin'an Community, Chang'an Town, Dongguan City, China
  • https://www.injectionmoldingmold.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement