China factories

China factory - TAKDA PRECISE MOULD FACTORY

TAKDA PRECISE MOULD FACTORY

  • China,Dongguan ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Strict Inspection ±0.01mm DME Base Auto Parts Mould
China Strict Inspection ±0.01mm DME Base Auto Parts Mould

  1. China Strict Inspection ±0.01mm DME Base Auto Parts Mould
  2. China Strict Inspection ±0.01mm DME Base Auto Parts Mould

Strict Inspection ±0.01mm DME Base Auto Parts Mould

  1. MOQ: 1 mold
  2. Price: Negotiate
  3. Get Latest Price
Payment Terms T/T, L/C, Western Union
Supply Ability 65 molds / month
Delivery Time 20 days after 2D 3D confirmed
Packaging Details Woodencase for packaging mold & Carton Box for packaging products
Mold Type Auto Parts Mould
Runner Cold / Hot
Design software UG , PROE , CAD
Plastic Material PP, PC , PS , PE
Mould Material H13, NAK80, S136, SKD61
Mould base Futaba , Lkm , Hasco , Dme
Cavity Single Mould
Tolerance Up to 0.01mm
Brand Name GT
Model Number Auto Parts Mould
Certification ISO 9001 , IGS
Place of Origin Dongguan China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, L/C, Western Union Supply Ability 65 molds / month
Delivery Time 20 days after 2D 3D confirmed Packaging Details Woodencase for packaging mold & Carton Box for packaging products
Mold Type Auto Parts Mould Runner Cold / Hot
Design software UG , PROE , CAD Plastic Material PP, PC , PS , PE
Mould Material H13, NAK80, S136, SKD61 Mould base Futaba , Lkm , Hasco , Dme
Cavity Single Mould Tolerance Up to 0.01mm
Brand Name GT Model Number Auto Parts Mould
Certification ISO 9001 , IGS Place of Origin Dongguan China
High Light DME Base Auto Parts Mould±0.01mm Auto Parts Mould±0.01mm injection molding automotive parts

 



Auto Parts Mould


1. Samples/Drawing &Requirement from you
2. Mould design:we will Communicate&Exchange the opinion with you after you place order.
3. Material Purchase:Steel cutting and Mould base tooling.
4. Assembling.
5. Inspection of mould : following and controlling the tooling processing.
6. Mould testing:We will inform you the date.Than will send the sample's inspection report&injection parameters with the sample to you!
7. Your instruction &confirmation for shipment.
8. Ready made mould before packing.

 

 

Name Auto Parts Mould
mould material 45#,P20,H13,718,2738,NAK80,S136etc.
mould base LKM,HASCOect.
Cavity Single/multi
Runner Hot/cold
Mould life 45# :300,000-500,000shots
P20: 500,000shots
718: 700,000shots
Design software UG,PROE,CADetc.
Plastic material PP,PE,ABS,PCetc.
Delivery time 35-60days
Specification According to client’s requirements

 


 

Specifications:

 

1. Quote competitive price according customer detail requirement

2. Sign agreement.

3. Customer T/T deposit to us to design mould

4. Send mould drawing to customer for confirmation

5. Mould design confirmed and start to make mould.

6. Make mould trial during tooling time(which we get agreement with customer).

7. Seed mould trial sample to customer for inspection.Or customer come to our factory to inspect mould

personally.

8. Customer T/T balance to us after mould confirmed.

9. Deliver mould after get balance.

 


Our service

 

We will submit the quotation in 24 hours if getting detailed information during working days.In order to quote for you earlier, please provide us the following information together with your inquiry.
1) 3D Step of Files and 2D Drawings
2) Material requirement
3) Surface treatment
4) Quantity (per order/per month/annual)
5) Any special demands or requirements, such as packing, labels,delivery,etc.

 

 

We are cooperated with more than 30 countries and regions' clients of the world.

  • We have own factory and senior professional technicians more than 50 people.
  • We provide a competitive price.
  • High precision.
  • Advanced fully equipments
  • 12 years' export experience.
  • Small order is accepted.
  • We can provide on-stop service including mould and assembly.



 
 


 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Seller,Other

  • Year Established:

    2005

  • Total Annual:

    8 million-9 million

  • Employee Number:

    200~300

  • Ecer Certification:

    Active Member

Company Profile:   Dongguan Gaotian precision mold factory was established in 2005, specializing in injection mold development, design and production.   Eing the leading plastic mold maker in China, Gaotian precision mold factory has been actively and sincerely striving to ... Company Profile:   Dongguan Gaotian precision mold factory was established in 2005, specializing in injection mold development, design and production.   Eing the leading plastic mold maker in China, Gaotian precision mold factory has been actively and sincerely striving to ...

+ Read More

Get in touch with us

  • Reach Us
  • TAKDA PRECISE MOULD FACTORY
  • 103, 1st Floor, Building A, Jinfeng Industrial Park, No. 8 Songlin West Road, Zengtian, Xin'an Community, Chang'an Town, Dongguan City, China
  • https://www.injectionmoldingmold.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement