Payment Terms | L/C, T/T, Western Union, MoneyGram |
Supply Ability | 3000 Units Per Year |
Delivery Time | 25-30 Work Days |
Packaging Details | Naked, Frame, Container |
Capacity of bitumen storage(m3) | 12 |
The temperature of bitumen(℃) | 130-160 |
Asphalt pump(m3/h) | 27 |
Speed of the truck(m/min)d of the truck(m/min) | 10.4 |
Power of thermal oil boiler(kw) | 470 |
Total power of electric(Kw) | <30 |
Brand Name | SHIM |
Model Number | SHIM-TT8 |
Certification | ISO9001 |
Place of Origin | CHINA |
View Detail Information
Explore similar products
Product Specification
Payment Terms | L/C, T/T, Western Union, MoneyGram | Supply Ability | 3000 Units Per Year |
Delivery Time | 25-30 Work Days | Packaging Details | Naked, Frame, Container |
Capacity of bitumen storage(m3) | 12 | The temperature of bitumen(℃) | 130-160 |
Asphalt pump(m3/h) | 27 | Speed of the truck(m/min)d of the truck(m/min) | 10.4 |
Power of thermal oil boiler(kw) | 470 | Total power of electric(Kw) | <30 |
Brand Name | SHIM | Model Number | SHIM-TT8 |
Certification | ISO9001 | Place of Origin | CHINA |
High Light | SHIM Bitumen Drum Decanter ,Bitumen Drum Decanter ISO9001 ,ISO9001 bitumen decanter machine |
12CBM Hydraulic Type Heating Drummed Decanter Bitumen Drum Decanter Asphalt Melting Equipment
Product Advantage:
The Directly-heated Drummed Bitumen Decanter asphalt melting equipment is mainly composed of the barrel body, the barrel platform, the barrel turning into the barrel integrated device, the heat conducting oil heating system and the electrical control system.
Heating chamber consists of two compartment, upper compartment and lower compartment. There are coiled pipelines which convey heat transfer oil in the upper compartment, hot emission air of diesel burner also exhausts into the upper compartment; heat transfer oil and hot emission air work together to heat the asphalt barrel. When bitumen become melt, it drops down to lower compartment, finally the barrel is emptied. The lower compartment is a melting bitumen pool, beneath it is another compartment which has a lot of coiled heat transfer oil pipelines and a duct for the hot emission air to pass through; the heat transfer oil and hot emission air keep heating the melting bitumen until it becomes liquid; then bitumen pump starts and pump the liquid bitumen to bitumen storage tank through bitumen pipelines. Filtrating device is installed in bitumen pipelines to remove the impurities in the bitumen.
Doors on both end of the heating chamber are spring doors that are automatically shut immediately after barrels come through it. Spring doors are easy for barrels coming in and getting out, and able to minimize heat loss as well.
Product parameters
Model | SHIM-TT8 |
Productivity | 6-8 |
Amount | 30 |
Capacity of bitumen storage(m3) | 12 |
The tempera-ture of bitumen(℃) | 130-160 |
Asphalt pump(m3/h) | 27 |
Speed of the truck(m/min) | 10.4 |
Power of thermal oil boiler(kw) | 720 |
Total power of electric(Kw) | <30 |
Total weight(T) | 18 |
Product Show:
Company Details
Business Type:
Manufacturer
Ecer Certification:
Site Member
Shandong Heavy Industry Machinery Co.,Ltd is committed to becoming a reliable international trade platform. The group exports trucks and machinery to global market. Trucks include tractor head, dump trucks, mining trucks, cement mixers, garbage trucks, sprinkler trucks, tr... Shandong Heavy Industry Machinery Co.,Ltd is committed to becoming a reliable international trade platform. The group exports trucks and machinery to global market. Trucks include tractor head, dump trucks, mining trucks, cement mixers, garbage trucks, sprinkler trucks, tr...
Get in touch with us
Leave a Message, we will call you back quickly!