China factories

China factory - Wuhan Rising Electric Co., Ltd.

Wuhan Rising Electric Co., Ltd.

  • China,Wuhan ,Hubei
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Applied Voltage Test Device Power Frequency Test Equipment
China Applied Voltage Test Device Power Frequency Test Equipment

  1. China Applied Voltage Test Device Power Frequency Test Equipment

Applied Voltage Test Device Power Frequency Test Equipment

  1. MOQ: 1 SET
  2. Price:
  3. Get Latest Price
Payment Terms L/C, L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability 100 SET PER Month
Packaging Details Wooden package
Measuring Range 0.9-10000
Minimum Resolution 0.0001
Power Electric
Color White
Warranty 1 Year
Brand Name RISING
Model Number RSBTT-Ⅱ
Certification ISO CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, L/C, D/A, D/P, T/T, Western Union, MoneyGram Supply Ability 100 SET PER Month
Packaging Details Wooden package Measuring Range 0.9-10000
Minimum Resolution 0.0001 Power Electric
Color White Warranty 1 Year
Brand Name RISING Model Number RSBTT-Ⅱ
Certification ISO CE Place of Origin China
High Light 0.0001 Transformer Test BenchRSBTT-Ⅱ

RSBTT-Ⅱ Transformer Test Bench Applied Voltage Test Device Power Frequency Test Equipment

Function & Characteristics

Power frequency withstand voltage test wiring and test steps 

 

Step1 Connect the power line of the Integrated Test Cabinet to the Power Supply.
Step2 Connect the power line of the Power Frequency Test Bench to the Power Supply.
Step3 Connect the Integrated Test Cabinet control terminal to the Power Frequency Test Bench control terminal with the Communication Cable (first installation).
Step4 Connect the Power Frequency Cable to the input terminal of the Test Transformer (first installation).
Step5 Connect the Test Cable 2 to the test terminal of the Intermediate Transformer.
Step6 Short-circuit the other terminals of the Intermediate Transformer with a Short-circuit Cable.
Step7 Turn on the Emergency Stop button.
Step8 Operate test software to proceed the power frequency withstand voltage test.
Step9 After the test, press the Emergency Stop button to power off
Step10 Remove the Short-circuit Cable.
Step11 Remove the Test Cable 2
Test operation section 

After setting the parameters, you can click“Power Frequency Closing“, and then click “Start Testing“. After setting the parameters and confirming that there is no problem, you can carry out the test

 

The Step-up button is used to increase the output voltage of the regulator. The mode of the button is to click the icon with the mouse. When clicking the mouse, the voltage keeps boosting. When click the mouse again it will stop.

 

The step-down button is used to reduce the output voltage of the regulator. The mode of the button is to click the icon with the mouse. When the mouse is clicked, the voltage will always be step-down. When click the mouse again it will stop

 

When each switch operation is completed, you can click“the boost button“ to carry out the boost operation, watch the data collected in the monitoring window, and rise to the specified test voltage. Then start timing, when the time is up, the voltage can be lowered automatically (note that the frequency converter rate modulation maximum). Click the “Power frequency opening” icon, then click the“end test“ icon to end the test.

 

Attention: You should set the time before test.

When you finish the relevant operation, you can do step-up operation until reach the required value, check the sample data from monitor window and save the required value, then you can step-down the voltage (Attention: adjust the converter speed to the max). Click “switch off”, then click “Finish test”.

 

Attention:

  • You must remember the temperature when you start test, otherwise, calculate the load value will have some deviation.
  • Remember change the standard temperature when you convert the load data, distinguish the dry type and oil-immersed type; the unit of input resistance is Ω, remember conversion.
  • The data of test voltage and protection current should be changed after switch on.
  • Capacitor compensation can’t step-up very high before switching, otherwise, it will create impulse.
  • Please change the time before induced test and power frequency test in order to prevent misoperation.

Test Note

1. After starting the test, you must remember the input temperature. Otherwise, the temperature in the load test will not cause the load calculation value to be biased.

2. Pay attention to changing the standard temperature when loading, to distinguish between oil change and dry change; The input resistance is unified into ohm, and the conversion is carried out.

3. Test voltage, protect current and so on after the characteristic or induction switch, after the modification, otherwise reset.

4. Capacitance compensation cannot be taken when it is high voltage.

5. Be careful to modify the time and avoid misoperation when sensing test and labor frequency test.

6. When the temperature rise test is entered into the temperature, only the current and previous temperature records can be viewed, and the subsequent entry cannot be shown after the closing.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2006

  • Ecer Certification:

    Active Member

Wuhan Rising Electric Co., Ltd. established in 2 0 0 6,located in the National High-tech Development zone - Wuhan East Lake Development zone.We are a high-tech enterprises which take high-voltage test equipments and related instrumentation’s research, development, production and management as ... Wuhan Rising Electric Co., Ltd. established in 2 0 0 6,located in the National High-tech Development zone - Wuhan East Lake Development zone.We are a high-tech enterprises which take high-voltage test equipments and related instrumentation’s research, development, production and management as ...

+ Read More

Get in touch with us

  • Reach Us
  • Wuhan Rising Electric Co., Ltd.
  • 1st Floor, Block B, Innovation Park, Changzui Science and Technology Park, Sixth High-tech Road, Jiangxia District, Wuhan City, Hubei Province
  • https://www.transformertestingequipment.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement