Payment Terms | L/C, L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | 100 SET PER Month |
Packaging Details | Wooden package |
Measuring Range | 0.9-10000 |
Minimum Resolution | 0.0001 |
Power | Electric |
Color | White |
Warranty | 1 Year |
Brand Name | RISING |
Model Number | RSBTT-Ⅱ |
Certification | ISO CE |
Place of Origin | China |
View Detail Information
Explore similar products
Touch Screen Transformer Testing Equipment AC380V±10% Power Supply
Full Automatic Transformer Test Bench / Frequency Withstand Voltage Test Panel
Full Automatic Transformer Testing Equipment 0.1V - 800V Voltage
CT PT Test Transformer Test Bench Integrated System , Transformer Test System
Product Specification
Payment Terms | L/C, L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | 100 SET PER Month |
Packaging Details | Wooden package | Measuring Range | 0.9-10000 |
Minimum Resolution | 0.0001 | Power | Electric |
Color | White | Warranty | 1 Year |
Brand Name | RISING | Model Number | RSBTT-Ⅱ |
Certification | ISO CE | Place of Origin | China |
High Light | 0.0001 Transformer Test Bench ,RSBTT-Ⅱ |
RSBTT-Ⅱ Transformer Test Bench Applied Voltage Test Device Power Frequency Test Equipment
Power frequency withstand voltage test wiring and test steps
Step1 | Connect the power line of the Integrated Test Cabinet to the Power Supply. |
Step2 | Connect the power line of the Power Frequency Test Bench to the Power Supply. |
Step3 | Connect the Integrated Test Cabinet control terminal to the Power Frequency Test Bench control terminal with the Communication Cable (first installation). |
Step4 | Connect the Power Frequency Cable to the input terminal of the Test Transformer (first installation). |
Step5 | Connect the Test Cable 2 to the test terminal of the Intermediate Transformer. |
Step6 | Short-circuit the other terminals of the Intermediate Transformer with a Short-circuit Cable. |
Step7 | Turn on the Emergency Stop button. |
Step8 | Operate test software to proceed the power frequency withstand voltage test. |
Step9 | After the test, press the Emergency Stop button to power off |
Step10 | Remove the Short-circuit Cable. |
Step11 | Remove the Test Cable 2 |
After setting the parameters, you can click“Power Frequency Closing“, and then click “Start Testing“. After setting the parameters and confirming that there is no problem, you can carry out the test
The Step-up button is used to increase the output voltage of the regulator. The mode of the button is to click the icon with the mouse. When clicking the mouse, the voltage keeps boosting. When click the mouse again it will stop.
The step-down button is used to reduce the output voltage of the regulator. The mode of the button is to click the icon with the mouse. When the mouse is clicked, the voltage will always be step-down. When click the mouse again it will stop
When each switch operation is completed, you can click“the boost button“ to carry out the boost operation, watch the data collected in the monitoring window, and rise to the specified test voltage. Then start timing, when the time is up, the voltage can be lowered automatically (note that the frequency converter rate modulation maximum). Click the “Power frequency opening” icon, then click the“end test“ icon to end the test.
Attention: You should set the time before test.
When you finish the relevant operation, you can do step-up operation until reach the required value, check the sample data from monitor window and save the required value, then you can step-down the voltage (Attention: adjust the converter speed to the max). Click “switch off”, then click “Finish test”.
Attention:
Test Note
1. After starting the test, you must remember the input temperature. Otherwise, the temperature in the load test will not cause the load calculation value to be biased.
2. Pay attention to changing the standard temperature when loading, to distinguish between oil change and dry change; The input resistance is unified into ohm, and the conversion is carried out.
3. Test voltage, protect current and so on after the characteristic or induction switch, after the modification, otherwise reset.
4. Capacitance compensation cannot be taken when it is high voltage.
5. Be careful to modify the time and avoid misoperation when sensing test and labor frequency test.
6. When the temperature rise test is entered into the temperature, only the current and previous temperature records can be viewed, and the subsequent entry cannot be shown after the closing.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2006
Ecer Certification:
Active Member
Wuhan Rising Electric Co., Ltd. established in 2 0 0 6,located in the National High-tech Development zone - Wuhan East Lake Development zone.We are a high-tech enterprises which take high-voltage test equipments and related instrumentation’s research, development, production and management as ... Wuhan Rising Electric Co., Ltd. established in 2 0 0 6,located in the National High-tech Development zone - Wuhan East Lake Development zone.We are a high-tech enterprises which take high-voltage test equipments and related instrumentation’s research, development, production and management as ...
Get in touch with us
Leave a Message, we will call you back quickly!