China factories

China factory - Wuhan Rising Electric Co., Ltd.

Wuhan Rising Electric Co., Ltd.

  • China,Wuhan ,Hubei
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Full Automatic Transformer Testing Equipment 0.1V - 800V Voltage
China Full Automatic Transformer Testing Equipment 0.1V - 800V Voltage

  1. China Full Automatic Transformer Testing Equipment 0.1V - 800V Voltage

Full Automatic Transformer Testing Equipment 0.1V - 800V Voltage

  1. MOQ: 1 Set
  2. Price:
  3. Get Latest Price
Payment Terms T/T, Western Union, MoneyGram,L/C, D/A, D/P,
Supply Ability 100 SET PER Month
Delivery Time 20 working days
Packaging Details Wooden package for export
Voltage 0.1-800V
Current 0.1-300A
Power U*I
Power factor 0.1-0.9999
Power supply AC380V±10% 50Hz±2%
Working temperature 0-40℃
Relative humidity 30%-90%
Outline dimension Customization
Brand Name RISING
Model Number RSBTT III
Certification ISO CE
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T, Western Union, MoneyGram,L/C, D/A, D/P, Supply Ability 100 SET PER Month
Delivery Time 20 working days Packaging Details Wooden package for export
Voltage 0.1-800V Current 0.1-300A
Power U*I Power factor 0.1-0.9999
Power supply AC380V±10% 50Hz±2% Working temperature 0-40℃
Relative humidity 30%-90% Outline dimension Customization
Brand Name RISING Model Number RSBTT III
Certification ISO CE Place of Origin China
High Light transformer test machinetransformer test panal

Full Automatic Transformer Testing Equipment / Transformer Test Bench

Product Description

RSBTT transformer integrated test system conforms to GB 50150 / IEC 60076-3 and other relevant standards.The integrated intelligent transformer test bench produced by Wuhan Rising is mainly to test the no-load and load characteristics of electric transformer and distribution transformer, but also to test the transformer for frequency doubling induction and power frequency withstand voltage test. All the tests can be fully automated, without complicated operation and calculation by personnel, and the calculation results can be displayed automatically.

Feature/Function
1.The design specification for the comprehensive test system of transformer lab
 
2.The system is safe and reliable and it should be easily operated.
The whole system gives consideration to both the safety of the operator and the reliability of the equipment. 
Complete protection function to overvoltage, overcurrent etc
Reasonable space layout with the clearly defined wires.
 
3.High-efficient system
The test result is inputted directly to the microcomputer to calculate with full use of microcomputer data processing technology, which avoids a lot of trouble to calculate manually. The external wires were arranged uniformly to avoid the manual connection to the lines. When replacing the wires, only need to use control buttons to finish the process automatically.
 
4. Humanized operation system
Make the full use of mechanical and electrical interlock, with combination of computer software, to prevent misoperation. Any operation not conforming to safety operation procedure will be denied by the system so as to protect the operator and the system effectively.
 
5. Reliable operation system
There are two operation mode, manual operation and automatic. Manual operation is usually adopted when automatic operation mode is failed to run, which won’t affect the normal test.
 
6. High test precision
The measurement accuracy of the system is higher than the national standard no matter measuring apparatus, meters or instrument transformers.
 
7. Real-time video monitoring (not taking into consideration temporarily)Running real-time video monitoring with professional camera and transferring the video signal to the monitor room, which will make the test performer have a good command to the on-site status.
Key components of the project (please refer to the quotation table for theconfiguration)
■The comprehensive test system of transformer
■AC and induced over voltage withstand test system
■The commonly used instrument (according to customer's requirement )

 

Technical Parameters:

Item
Scope of Measurement
Relative Error
Voltage
0.1-800V
±(0.2% reading + 0.1% range)
Current
0.1-300A
±(0.2% reading + 0.1% range)
Power
U*I
±(0.2% reading + 0.1% range)
Power factor
0.1-0.9999
±3 figures
Power supply
AC 380V±10% 50Hz±2%
Operating condition
Working temperature: -20℃-40℃ Relative humidity <90%
Outline dimension
Customization
Weight
Customization

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2006

  • Ecer Certification:

    Active Member

Wuhan Rising Electric Co., Ltd. established in 2 0 0 6,located in the National High-tech Development zone - Wuhan East Lake Development zone.We are a high-tech enterprises which take high-voltage test equipments and related instrumentation’s research, development, production and management as ... Wuhan Rising Electric Co., Ltd. established in 2 0 0 6,located in the National High-tech Development zone - Wuhan East Lake Development zone.We are a high-tech enterprises which take high-voltage test equipments and related instrumentation’s research, development, production and management as ...

+ Read More

Get in touch with us

  • Reach Us
  • Wuhan Rising Electric Co., Ltd.
  • 1st Floor, Block B, Innovation Park, Changzui Science and Technology Park, Sixth High-tech Road, Jiangxia District, Wuhan City, Hubei Province
  • https://www.transformertestingequipment.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement