Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability | infinitude |
Delivery Time | 15-30 days |
Packaging Details | Can be packed according to customer's requirement |
Material | PVC |
Specification | It is suitable for sewage outlet with holes of only 102 plus or minus 5mm |
Length | The adjustable |
Thickness | 3mm |
Color | White |
Application | Drainage |
Feature | Deodorant |
Usage | Toilet connector |
Type | Round Pipe |
Connection | Flanged Joint |
Brand Name | San-Tide |
Model Number | E232-1 |
Place of Origin | CHINA XIAMEN |
View Detail Information
Explore similar products
Question Mark Shaped Wc Pan Connector Fitting , PP Toilet Soil Pan Connector
Polypropylene Short Toilet Drain Connector With No Visible Specks And Sag
Flexible Toilet Pan Connector Easily And Reliable Installation 980g
White Smooth Toilet Pan Connector , Discharge Mode 90 Degree Pan Connector
Product Specification
Payment Terms | L/C, D/A, D/P, T/T, Western Union, MoneyGram | Supply Ability | infinitude |
Delivery Time | 15-30 days | Packaging Details | Can be packed according to customer's requirement |
Material | PVC | Specification | It is suitable for sewage outlet with holes of only 102 plus or minus 5mm |
Length | The adjustable | Thickness | 3mm |
Color | White | Application | Drainage |
Feature | Deodorant | Usage | Toilet connector |
Type | Round Pipe | Connection | Flanged Joint |
Brand Name | San-Tide | Model Number | E232-1 |
Place of Origin | CHINA XIAMEN | ||
High Light | toilet waste pipe connector ,toilet flush pipe connector |
What are the steps to install the toilet drain?
Installation method -- make all kinds of preparations before installation of the toilet, especially the key points of installation must be achieved, so as to ensure the smooth installation.
1. Same as above installation key points 1, 2.
2. Fixed seat urinal (one of the fixation methods is selected according to the fixation method of the urinal) method 1: pull-out bolt fixation method, which is designed for the urinal with mounting holes at the bottom.Toilet on the location of the installation, use a pencil to draw the need to the position of the mounting holes in the ground at the bottom of the hole location and contour, and then remove the toilet, in marked the location of the hole and insert the explosive bolts, in sit implement discharge outlet joint coating adhesive, with the ground will implement smoothly away, strong explosive bolts, and the last bottom sealing implement with cement mortar.Method 2: cement bonding method, this method is aimed at the bottom of no installation hole design of the toilet seat.Toilet on the location of the installation, use the pencil out of the toilet bottom contour, along the contour line to laying a circle within a 30 mm wide, 15 mm high cement mortar, present implement discharge outlet with the ground joint coating adhesive, wipe clean implement foot, smoothly in its installation position, make strong the binding, wipe clean overflow of cement mortar.
3. After fixing the toilet, immediately wipe the extra cement on the toilet and the ground.
4. Connect the toilet cistern and the water pipe.
5. Check whether the water tank is leaking, and then flush to check whether the sewage pipe is free.
6. It shall not be used for three days after installation, and it shall not be used for at least one day at the present cementing speed, so as not to affect its stability.
Name: | Toilet connector pipe |
Type: | E232-1 |
Brand: | San-Tide |
Origin: | Chian xiamen |
Material: | PVC |
Type: | Plumbing Traps |
Color: | White |
length: | Can be cut |
Application: | W.C Pan |
Specification: | choosable |
Processing method : | Assembly production |
USES: | Toilet drainage |
Specifications: | The question mark tube |
Foreign trade: | is |
What is the method that toilet blow-down tube changes?
1. The installation of sewage pipe should be taken before the toilet to conduct a comprehensive inspection, look at whether there is mud, sand, waste paper and other debris inside the pipe blockage, at the same time check whether around the toilet before and after installing a ground level, such as to find the ground, when installation should be leveling the ground.
2. Turn over the toilet, determine the center on the toilet drain, and draw the cross center line, which should extend to the feet around the bottom of the toilet.
3. Align the cross line on the toilet with the ground sewage outlet, keep the toilet installed horizontally, press the sealing ring tightly, install the ground screw and decorative cap.
4. Flush the pipe with water for 3-5 minutes to ensure the clean of the water pipe;Install Angle valve and connect hose, then connect hose to water inlet valve of water tank fitting and press water supply.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company,Seller
Year Established:
2015
Total Annual:
2000000 yuan-$286,143.5
Ecer Certification:
Active Member
Xiamen MuRuJia CO., LTD., founded in 2015,we are one professional company who supplies all kinds of bathroom products,like Toilet Tank Fittings,Toilet Seat Covers,Plastic & Brass Bidets, SS Bidets,Hand Shower ,RainShower and Shower Kits,Brass & Plastic Faucets,SS/PVC Show... Xiamen MuRuJia CO., LTD., founded in 2015,we are one professional company who supplies all kinds of bathroom products,like Toilet Tank Fittings,Toilet Seat Covers,Plastic & Brass Bidets, SS Bidets,Hand Shower ,RainShower and Shower Kits,Brass & Plastic Faucets,SS/PVC Show...
Get in touch with us
Leave a Message, we will call you back quickly!