China factories

China factory - Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.

  • China,Zhenjiang ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge
China Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

  1. China Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge
  2. China Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge
  3. China Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

Steel Composite Beam Bridge Long Span Heavy Load Permanent Steel Bridge

  1. MOQ: 1 set
  2. Price: 1500USD ~2000USD/ton
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union, MoneyGram
Supply Ability 3000/month
Delivery Time 45days
Packaging Details Nude and Steel case
Material S460J0,S355JR,S355J0,Gr65,Gr50
Load HA ,HB,HA+20HB,AASHTO HL-93,HS35-44
Lane Single lane4.2m,Double Lane 7.35m, Three lane:10.5m
Surface Finish Painted
Load Capacity High
Application Steel Structure Bridge
Life 100 years
Bridge Deck Steel ,Concrete
Brand Name Tongkai
Model Number Truss bridge
Certification ISO,EN1090,SGS ,
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union, MoneyGram Supply Ability 3000/month
Delivery Time 45days Packaging Details Nude and Steel case
Material S460J0,S355JR,S355J0,Gr65,Gr50 Load HA ,HB,HA+20HB,AASHTO HL-93,HS35-44
Lane Single lane4.2m,Double Lane 7.35m, Three lane:10.5m Surface Finish Painted
Load Capacity High Application Steel Structure Bridge
Life 100 years Bridge Deck Steel ,Concrete
Brand Name Tongkai Model Number Truss bridge
Certification ISO,EN1090,SGS , Place of Origin China
High Light Large span Steel Beam BridgeHeavy Load Steel Beam BridgePermanent Steel Beam Bridge

 

Composite' means that the steel structure of a bridge is fixed to the concrete structure of the deck so that the steel and concrete act together, so reducing deflections and increasing strength. This is done using 'shear connectors' fixed to the steel beams and then embedded in the concrete. Shear connectors can be welded on, perhaps using a 'stud welder', or better still on export work, by fixing nuts and bolts.

 

stud fixing diagram

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

Shear connectors, correctly spaced to resist the loads, make the concrete work 'compositely' with the steel.

Usually the steel carries its own weight and that of the wet concrete. But when the concrete is 'cured' and has acquired its full strength, then all future loads (traffic, surfacing, wind, water, pressure, seismic loads) are shared by the steel/concrete composite.

The concrete is good in compression, while the steel is good in tension and compression. This composite bridge design can be used in the following ways:

 

1. Simple Beam Bridges - On short spans (8m, 10m, 15m and then more expensively up to 24m), bridges can be made from a number of beams under the roadway straight across the gap. The bridges benefit the most from composite action.

composte layer diagram

2. Over Truss Bridges - These are similar to simple beam bridges but for longer spans, from say 18m up to approx 100m. The deck is still on top of the steel structure, so goes into compression when deflected.

 

 

 

truss layer diagram

3. Transoms on any type of bridge - Transoms go from side to side across a bridge and carry the deck loads to strong steel frames on either side. This is usually on 'open top' through truss bridges or 'closed-top' through truss bridges.

transoms closed diagram

4. Decking - In a normal steel building the concrete can act together with steel decking, the steel decking taking the place of the regular steel reinforcing bars within the concrete. However in a bridge, the underside of the decking is liable to corrode over time, so is not counted as part of the reinforcement. It is just used as 'lost formwork'.

steel decking diagram

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2014

  • Total Annual:

    5,000,000-5,500,000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Zhenjiang Tongkai Mechanical Engineering Co., Ltd. is a company specializing in the production and selling of steel bridges, steel structures and other machined parts. The company's main products include bailey bridge, modular steel bridges, steel truss bridges, steel arch bridge and steel struc... Zhenjiang Tongkai Mechanical Engineering Co., Ltd. is a company specializing in the production and selling of steel bridges, steel structures and other machined parts. The company's main products include bailey bridge, modular steel bridges, steel truss bridges, steel arch bridge and steel struc...

+ Read More

Get in touch with us

  • Reach Us
  • Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
  • Room 202, Jintai Building, Runxing Road,High tech Zone, Zhenjiang Jiangsu, China
  • https://www.tkbridges.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement