China factories

China factory - Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.

Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.

  • China,Zhenjiang ,Jiangsu
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR
China Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR

  1. China Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR
  2. China Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR
  3. China Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR
  4. China Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR

Steel Bailey Bridge Footway Bridge Compact 100 Bailey Single Lane S355JR

  1. MOQ: 1set
  2. Price: FOB1000USD
  3. Get Latest Price
Payment Terms L/C, T/T, Western Union, MoneyGram
Supply Ability 500T/M
Delivery Time 15days
Packaging Details Nude Packing ,Steel case
Material S460J0,S355JR,S235JR
Color Green, Grey, Orange,Red
Load HS15,HS20,HS25,HL-93,HA ,HB
Net Width 3.15m, 3.6m,4m
Footway 1m, 1.2m,1.5m
Brand Name Tongkai
Model Number Compact 100
Certification ISO9001, EN1090,ISO3834
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T, Western Union, MoneyGram Supply Ability 500T/M
Delivery Time 15days Packaging Details Nude Packing ,Steel case
Material S460J0,S355JR,S235JR Color Green, Grey, Orange,Red
Load HS15,HS20,HS25,HL-93,HA ,HB Net Width 3.15m, 3.6m,4m
Footway 1m, 1.2m,1.5m Brand Name Tongkai
Model Number Compact 100 Certification ISO9001, EN1090,ISO3834
Place of Origin China
High Light S460J0 Mabey BridgeS235JR Mabey BridgeS355JR temporary bridge

Brief Introduction

 

 

Specification

* Standard : ASTM, GB,BS

* Material : S355Jr, S460J0

* Panel Size : 3000/3048mm * 1500mm*176mm

* Type : heavy

* Footway : single or double side, 1m ,1.2m & 1.5m

* Application Scope : Road Construction ; Railway Construction ;

                                   Emergency Usage ; Military Usage  

 

 

Introduction:

Bailey Bridgeis a standard bridge equipment, adopted extensively and the most popular in the world, possessing the features of simple structure, convenient transport, speedy erection and easy disassembling, while having the advantage of heavy loading capacity, great stability and long fatigue life being capable of an alternative span, loading capacity and mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges. The bridge has the advantages of few components, light weight and low cost. Bailey bridge is similarly like compact 100,compact 200 International bridge. it is assembled by each 3m panel, and invented by Donald Bailey. The 321 panel bridge can be easily dissembled and rapidly erected. The whole bridge is made by high-tensile strength steel. Main beam is light weight panels and the panels are connected by panel connection pins. It is easy to assemble or disassemble and transport. It can also be assembled into different forms of panel bridges according to their span length and transportation requirement. So, it has been widely applied as emergency transportation, temporary or permanent bridge. Its suitable load design is such like HS-15, HS-20, HS-25 and pedrail-50 etc.

 

 

 


Panel
The panels are monolithic unit welded in the factory and assembled by panel pin on the construction site, and the main structures are assembled according with the request of span and loading. The hole-to-hole distance of panel is 3000mm/3048mm, and the height is 1500mm. Each panel top and bottom chord has interlocking male and female lugs into which the panel pins were inserted. The bottom chord has bottom chord has 4 transom seats. the material of up and down chord is 10# channel steel and the middle is 8# I-beam steel.
Joint systems

Transom Clamp, a screw lock clamp that secures the transom to the panel, 3.0kg

Sway Brace: fitted under the roadway and ran from one end of the lower run of the inner panel to the diagonally opposite end, 33kg

Rakers: fastened to the top run of the panel and a lug near the end of the transom. These kept the panel vertical, 11kg

 

Decking system
The deck system is made up of transom and deck. The transom connects with panel and deck by U- bolt and L-bolt. The material for transom is Type I-beam steel, the deck size is 3042×1050 Transom; 18 foot long, 10 inches high and 4 ½ inches wide clamped to the panels using transom clamps.
Transoms had lugs on the top surface to locate the roadway decks. There were holes drilled through the transom to allow the transom to be carried using lifting bars. The deck is fixed on the transom by U- bolt.
End system
The bridge end is composed of End Male Post, Female End Post, Tie Beam, Bearing and Bearing Plate
Launching equipment and tools
The launching equipment and tools are made up of nose, roller, rock roller, joint, bolt and various spanners. The max loading of roller is 25t and the rock roller id 6t. The nose is netlike structure assembled by bridge components (not offered in this project).
Erection Method: Cantilever Launchin g Method,Crane Lifting
 

 

 

 

 

 

 

 

 

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Seller

  • Year Established:

    2014

  • Total Annual:

    5,000,000-5,500,000

  • Employee Number:

    100~120

  • Ecer Certification:

    Verified Supplier

Zhenjiang Tongkai Mechanical Engineering Co., Ltd. is a company specializing in the production and selling of steel bridges, steel structures and other machined parts. The company's main products include bailey bridge, modular steel bridges, steel truss bridges, steel arch bridge and steel struc... Zhenjiang Tongkai Mechanical Engineering Co., Ltd. is a company specializing in the production and selling of steel bridges, steel structures and other machined parts. The company's main products include bailey bridge, modular steel bridges, steel truss bridges, steel arch bridge and steel struc...

+ Read More

Get in touch with us

  • Reach Us
  • Zhenjiang Tongkai Mechanical Engineering Co.,Ltd.
  • Room 202, Jintai Building, Runxing Road,High tech Zone, Zhenjiang Jiangsu, China
  • https://www.tkbridges.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement