Payment Terms | T/T L/C |
Supply Ability | 20 sets per month |
Delivery Time | 20~30 work days |
Packaging Details | Standard package for export |
Another name | Vulcanization tank |
Gross weight | 4500 KG |
Air pressure | 0.75 MPA |
Voltage & frequency | 380V |
Average curing time | 5 hours |
Size | 2300mm * 2300mm * 7300mm |
Brand Name | YTON |
Model Number | YTL-02 |
Certification | CE |
Place of Origin | Zhejiang China |
View Detail Information
Explore similar products
Durable OTR Retreading Equipment , Tire Buffing Machine 2200 KG CE Approved
Reliable Used Tyre Retreading Machine Skiving Station For Repair Tire
Safety Handling Used Tyre Retreading Machine / Pressure Testing Machine
Cold Tire Vulcanizing Equipment , Automatic Used Tyre Buffing Machine
Product Specification
Payment Terms | T/T L/C | Supply Ability | 20 sets per month |
Delivery Time | 20~30 work days | Packaging Details | Standard package for export |
Another name | Vulcanization tank | Gross weight | 4500 KG |
Air pressure | 0.75 MPA | Voltage & frequency | 380V |
Average curing time | 5 hours | Size | 2300mm * 2300mm * 7300mm |
Brand Name | YTON | Model Number | YTL-02 |
Certification | CE | Place of Origin | Zhejiang China |
High Light | tire polishing machine ,tire vulcanizing equipment |
New Generation Curing Chamber For Used Tyre Retreading Machine
Vulcanizing machine
Equipment for retread tire
Specs Φ1500-Φ4700L(the dimension can according to customer’s requirement to design)
The interlocking device is the first important point to ensure the acceptable product. The equipment can be heated by electric, steam or conduction oil. Before working, you can adjust the pressure, temperature and time on the control panel.
Temperature: 95~120°C
Pressure:0.5~0.6Mpa
Automatic pressure: 0.7~0.8Mpa
Entire pressure: 0.4Mpa
Entire working time :When the time is up to 100 degrees, pressure is 0.48Mpa, the machine begin automatic work.
Operating after manual closing the door, the fast opening door motor contact, push the close button, the Vulcanizing boiler enter the status of self-control.
Parts of tread process:
10, vulcanization
A curing chamber applies heat and pressure, and over time, causing the bonding layer to cure, permanently adhering the new tread to the prepared casing. If there are any problems in vulcanizing, it will make the retreading tyres to gap. The tyres for truck need several hours to vulcanize, need the experienced and responsible operators. Now the advanced plants adopt the curing chamber auto controlled by computer, which can complete vulcanize automatically and exactly.
11, final inspection
A final inspection is performed to ensure the tire in perfect operating condition depending visual, hands-on inspection. In some countries and regions, the finished product must be checked in high gas-pressurized state, but special protective equipment is necessary to reduce the operation risk. Laser non-destructive checking equipment has been used in some advanced plants. By spraying paint, the qualified production can be put into use after 24 hours.
Company Details
Business Type:
Manufacturer
Year Established:
2001
Total Annual:
500,000,00-1,000,000,00
Employee Number:
100~200
Ecer Certification:
Site Member
Taizhou Mingtong Machinery Company limited is a professional manufacturer engaged in the research, development, production, and marketing of environmental protection machine. Located at Shangsan high-speed Yangtou exit, nearby the beautiful Tiantai Mountain where the Tiantai Section of Buddhism... Taizhou Mingtong Machinery Company limited is a professional manufacturer engaged in the research, development, production, and marketing of environmental protection machine. Located at Shangsan high-speed Yangtou exit, nearby the beautiful Tiantai Mountain where the Tiantai Section of Buddhism...
Get in touch with us
Leave a Message, we will call you back quickly!