Payment Terms | L/C, T/T |
Supply Ability | 35 Sets per Month |
Delivery Time | 30 Working Days |
Packaging Details | Standard Export Packing |
Machine Size | About 7.5m*1.2m*1.0m |
Suitable Material | Galvanized Steel Coil |
Thickness | 0.8-1.2mm |
Speed | 20-25m/min |
Roller | 45# Steel, coated with hard chrome |
Roller Station | 18 Stations |
Brand Name | Lebron-Machinery |
Model Number | Door Frame Roll Forming Machine |
Certification | ISO 9001: 2008 |
Place of Origin | Wuxi, Jiangsu, China |
View Detail Information
Explore similar products
Fully Automatic Steel Door Roll Forming Machine 21m/Min Quenched Treatment
High Capacity Steel Door Frame Roll Forming Machine 75 Mm Mold Steel
GCr15 Steel Door Frame Roll Forming Machine 1.2mm Schneider High Speed
High Capacity Steel Door Frame Roll Forming Machine 60HZ Mitsubishi 15m/Min
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 35 Sets per Month |
Delivery Time | 30 Working Days | Packaging Details | Standard Export Packing |
Machine Size | About 7.5m*1.2m*1.0m | Suitable Material | Galvanized Steel Coil |
Thickness | 0.8-1.2mm | Speed | 20-25m/min |
Roller | 45# Steel, coated with hard chrome | Roller Station | 18 Stations |
Brand Name | Lebron-Machinery | Model Number | Door Frame Roll Forming Machine |
Certification | ISO 9001: 2008 | Place of Origin | Wuxi, Jiangsu, China |
High Light | Fully Automatic door frame making machine ,1.2mm door frame making machine ,1.2mm door frame production machine |
Blue Color Fully Automatic Door Frame Roll Forming Machine High Stability
1. Description of Door Frame Roll Forming Machine
We often see many exquisite door frames in our lives, so door frames are used to install door leaves. In the past, ordinary doors had door frames. Now in the fine decoration, the door with plutonium is installed directly on the keel of the door cover without a frame.
The Door Frame Roll Forming Machines can be divided into three categories: ordinary door frame forming machines (one-time), door frame half forming machines (adjustable), and fully automatic door frame forming machines.
Among them, the door frame semi-forming machine (adjustable type) is special. Its characteristic is that the double-sided door frame is formed. Two kinds of lace sizes in the above product specifications can be selected, and the pattern is optional;
The key part of the whole machine-the roller is designed by computer AutoCad, UG simulation, CNC lathe processing, and then subjected to high temperature quenching treatment.
Process flow of door frame forming machine:
Uncoiling -- leveling&feeding -- continuous punching -- roll forming -- fixed-length cutting--receiving
2. Technical Parameters of Door Frame Roll Forming Machine
Weight | About 8000kgs |
Size | About 7.5m*1.2m*1.0m (L x W x H) |
Suitable Material | Galvanized steel strip |
Thickness | 0.8~1.2mm |
Coil width | 240mm |
Yield strength | 235Mpa |
Rollers station | 18 Stations |
Roller Shaft Diameter | 75 mm |
Roll Forming Speed | 20-25m/min |
Production Speed | Approx.15m/min |
Roller Material | 45# steel, coated with chrome, quenched |
Cutter material | Cr12 mold steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric power requirement | Main power: 7.5 KW |
Hydraulic power: 4 KW | |
Electric voltage | 380V 50Hz 3 Phase (as per local requirement) |
3. Our Service
Installation service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
4. FAQ
Q: How to maintenance?
A: If using frequently, best coating lubricant on the chain and two ends of the shaft every month, replace the hydraulic oil every 1-2 years.
Q: Can you be responsible for transport?
A: Yes, please tell me the destination port or address. we have rich experience in transport.
Q: Can you make the machine according to my design or phototype?
A: Yes. We have an experienced team for working out the most suitable design and production
Q: Can you supply the raw materials?
A: Yes, we can supply the galvanized steel coil, aluminum steel coil, color steel coil
Q: How is this machine's service life?
A: In normal maintenance, the service life is at least 10 years.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2007
Total Annual:
3000000-4000000
Employee Number:
95~100
Ecer Certification:
Active Member
Jiangsu LeBron Machinery Technology Co., Ltd. (Brand Name: Lebron-Machinery) is a professional designer and manufacturer of Cold Roll Forming Machines. Founded in 2007, with over 10 years experience of in design and manufacture, now LBM is a leading and widely recognized manufacturer and exporter of... Jiangsu LeBron Machinery Technology Co., Ltd. (Brand Name: Lebron-Machinery) is a professional designer and manufacturer of Cold Roll Forming Machines. Founded in 2007, with over 10 years experience of in design and manufacture, now LBM is a leading and widely recognized manufacturer and exporter of...
Get in touch with us
Leave a Message, we will call you back quickly!