Payment Terms | L/C, T/T |
Supply Ability | 35 Sets per Month |
Delivery Time | 30 Working Days |
Packaging Details | Standard Export Packing |
Machine Weight | About 6-Ton |
Machine Size | 7.5*1.2*1.0m |
Suitable Material | Galvanizsed Steel |
Speed | 20-25m/min |
Roller | 45# Steel, coated with hard chrome |
Roller Station | 18 Stations |
Brand Name | Lebron-Machinery |
Model Number | Door Frame Roll Forming Machine |
Certification | ISO 9001: 2008 |
Place of Origin | Wuxi, Jiangsu, China |
View Detail Information
Explore similar products
Fully Automatic Steel Door Roll Forming Machine 21m/Min Quenched Treatment
High Capacity Steel Door Frame Roll Forming Machine 75 Mm Mold Steel
GCr15 Steel Door Frame Roll Forming Machine 1.2mm Schneider High Speed
High Capacity Steel Door Frame Roll Forming Machine 60HZ Mitsubishi 15m/Min
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 35 Sets per Month |
Delivery Time | 30 Working Days | Packaging Details | Standard Export Packing |
Machine Weight | About 6-Ton | Machine Size | 7.5*1.2*1.0m |
Suitable Material | Galvanizsed Steel | Speed | 20-25m/min |
Roller | 45# Steel, coated with hard chrome | Roller Station | 18 Stations |
Brand Name | Lebron-Machinery | Model Number | Door Frame Roll Forming Machine |
Certification | ISO 9001: 2008 | Place of Origin | Wuxi, Jiangsu, China |
High Light | 20m/min Door Frame Roll Forming Machine ,adjustable Door Frame Roll Forming Machine ,chrome coating Door rolling machine |
Widely Used Durable High-Efficiency Door Frame Roll Forming Machine
1. Description of Door Frame Roll Forming Machine
The Door Frame Roll Forming Machines can be divided into three categories: ordinary door frame forming machines (one-time), door frame half forming machines (adjustable), and fully automatic door frame forming machines.
Among them, the door frame semi-forming machine (adjustable type) is special. Its characteristic is that the double-sided door frame is formed. Two kinds of lace sizes in the above product specifications can be selected, and the pattern is optional;
Door frame semi-forming machine (adjustable) Purpose: anti-theft door or indoor and outdoor door frames. Can be designed and manufactured according to customer requirements.
The production process of door frame forming machine:
The key part of the whole machine-the roller is designed by computer AutoCad, UG simulation, CNC lathe processing, and then subjected to high temperature quenching treatment.
2. Technical Parameters of Door Frame Roll Forming Machine
Weight | About 8000kgs |
Size | About 7.5m*1.2m*1.0m (L x W x H) |
Suitable Material | Galvanized steel strip |
Thickness | 0.8~1.2mm |
Coil width | 240mm |
Yield strength | 235Mpa |
Rollers station | 18 Stations |
Roller Shaft Diameter | 75 mm |
Roll Forming Speed | 20-25m/min |
Production Speed | Approx.15m/min |
Roller Material | 45# steel, coated with chrome, quenched |
Cutter material | Cr12 mold steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric power requirement | Main power: 7.5 KW |
Hydraulic power: 4 KW | |
Electric voltage | 380V 50Hz 3 Phase (as per local requirement) |
3. FAQ:
Q1. What is your advantage?
A1: We have over 11 years of experience in roll-forming machine production. Experienced engineers and workers will be helpful for quality control.
Q2. Do you have after-sales support?
A2: Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers' specifications, using top brand components.
Q4. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. We have rich experience in transporting.
Q5. How to visit your company?
A5: 1). Fly to Wuxi airport, we will pick you up.
2). Fly to Shanghai Airport: By high-speed train From Shanghai Hongqiao railway station to Wuxi railway station, then we can pick you up.
4. Our service
A. Foreign debugging
If you need it, we will arrange for our professional engineers to help you install and debug the machines well. The buyer should pay $100 per day
B. Guarantee period
The warranty will be a maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during the guarantee period, we will provide the parts free of charge, which is in the conditions of correct operation. (Natural disasters or factors which can’t be forced by humans are excluded).
C. Training
During the installation and adjustment of the equipment, our engineers shall provide the training to the buyer’s personal request to operate and maintain the equipment. Including foundation construction, electrical works, hydraulic oil, safe operation, and non-standard safety items, testing material and etc.
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2007
Total Annual:
3000000-4000000
Employee Number:
95~100
Ecer Certification:
Active Member
Jiangsu LeBron Machinery Technology Co., Ltd. (Brand Name: Lebron-Machinery) is a professional designer and manufacturer of Cold Roll Forming Machines. Founded in 2007, with over 10 years experience of in design and manufacture, now LBM is a leading and widely recognized manufacturer and exporter of... Jiangsu LeBron Machinery Technology Co., Ltd. (Brand Name: Lebron-Machinery) is a professional designer and manufacturer of Cold Roll Forming Machines. Founded in 2007, with over 10 years experience of in design and manufacture, now LBM is a leading and widely recognized manufacturer and exporter of...
Get in touch with us
Leave a Message, we will call you back quickly!