Payment Terms | L/C,T/T |
Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs |
Packaging Details | Seaworthy packings into container or bulk vessel |
Frame Type | Clearspan |
Material | Structural Steel |
Charges | Free |
Steel Grade | ASTM A572 or Q345B |
Building Type | Prefabricated building |
Application | Supermarket |
Framing System | Beam and Column System |
Wall Material | Steel Sandwich Panels |
Design Methods | ASD |
Code of Steel Construction | ASTM Standards |
Brand Name | HONFENG |
Model Number | OWN |
Certification | ISO9001:2008, SGS, etc. |
Place of Origin | Zhejiang, China |
View Detail Information
Explore similar products
Steel Framed Buildings / Industrial Steel Buildings For Steel Warehouse And
Corrosion Resistant Light Weight Metal Structural Steel Buildings With Huge
Warehouse Industrial Steel Buildings / Prefabricated Steel Buildings
Industry Metal Storage Buildings , Professional Project Steel Building
Product Specification
Payment Terms | L/C,T/T | Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs | Packaging Details | Seaworthy packings into container or bulk vessel |
Frame Type | Clearspan | Material | Structural Steel |
Charges | Free | Steel Grade | ASTM A572 or Q345B |
Building Type | Prefabricated building | Application | Supermarket |
Framing System | Beam and Column System | Wall Material | Steel Sandwich Panels |
Design Methods | ASD | Code of Steel Construction | ASTM Standards |
Brand Name | HONFENG | Model Number | OWN |
Certification | ISO9001:2008, SGS, etc. | Place of Origin | Zhejiang, China |
High Light | steel buildings ,prefab steel buildings |
Feature | Pre-Engineered Steel Buildings |
Design Criteria | AISC, MBMA, AWS |
Structural Base Material | All primary & secondary steel used by Mammut Building System has minimum yield strength of 50 KSI (345 N/mm2). |
Foundation | Simple design easy to construct and light weight |
Delivery | Average 6 to 8 weeks. |
Sourcing & Coordination | Building is supplied complete withCladding and all accessories, including erection if required, all from one source of supply. |
Structure Weight | About 30% lighter through the-efficient use of steel. Primary framing members are (varying depth) tapered built-up plate sections with large depths in the areas of highest stress. Secondary members are light gage (light weight) cold formed (low labor cost) “Z” - or“C” shaped members.Z purlins / girts can be lapped. Lapping reduces the deflection, and allows double thickness at the points of higher stresses (support points). |
Design | Quick and efficient since standardization of P.E.B. has significantly reduced design time. Basic designs are used over and over. Specialized computer analysis and design programs reduce design time and optimize material required. Drafting is also computerized with minimal manual drawings. Design, detail drawings and erection drawings are supplied free of charge by the manufacturer. Approval drawings may be prepared within 10 days to 3 weeks. Consultant in-house design and drafting time is significantly reduced, allowing more time for coordination and review, and increasing margins in design fees. Since most of the PEB are pin-based, the cost is reduced due to smaller sections at the base with smaller base plates and foundations (in absence of moments). |
AccessoriesWindows, Doors,Ventilation etc. | Designed to fit the system, with standardized, interchangeable parts, including pre-designed flashing and trims. Mass produced for economy. All available with the building. |
Erection | Easy, fast, step by step. Erection costs & time are accurately known, based upon extensive experience with similar buildings. |
Architecture | Outstanding architectural design at low cost. Conventional wall, and fascia materials, such a concrete, masonry and wood, can be utilized. |
Overall Price | Price per square meter may be as much as 40% lower than conventional steel. |
Changes | Very flexible, tailor made, accepts changes and revisions easily. Future expansion is simple, easy and cost effective. One supplier to co-ordinate changes. |
Performance | All components have been specified and designed specifically to act together as a system, for maximum efficiency, precise fit up, and performance in the field conditions world wide has resulted in design improvements over time which allow dependable prediction of performance. |
Responsibility | Single source of supply results in total responsibility for one supplier, including design liability. |
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2000
Total Annual:
500 Million -600 Million
Employee Number:
1200~1300
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!