China factories

China factory - FAMOUS Steel Engineering Company

FAMOUS Steel Engineering Company

  • China,Hangzhou ,Zhejiang
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Q460 Structural Modular Steel Box Girder Bridge With Fast Installation
China Q460 Structural Modular Steel Box Girder Bridge With Fast Installation

  1. China Q460 Structural Modular Steel Box Girder Bridge With Fast Installation
  2. China Q460 Structural Modular Steel Box Girder Bridge With Fast Installation

Q460 Structural Modular Steel Box Girder Bridge With Fast Installation

  1. MOQ: 1 pcs
  2. Price: USD1000~USD1200 per ton
  3. Get Latest Price
Payment Terms L/C,T/T
Supply Ability 600,000 tons per Year
Delivery Time Based on client's needs
Packaging Details Seaworthy packings into container or bulk vessel
Material Steel
Surface treatment Painted or galvanized
Width 7.3m
Installation Easy
Carry capacity Resist strong wind and earthquake, bears heavy snow.etc
Grade Q460b
Q345B-Q460C AISI, ASTM, BS, DIN, GB, JIS
Color Army blue, light gray, or customized.etc
Application Permanent Steel Structure Bridge
Brand Name FAMOUS
Model Number HD200
Certification ISO9001:2008, SGS, etc.
Place of Origin Zhejiang, China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C,T/T Supply Ability 600,000 tons per Year
Delivery Time Based on client's needs Packaging Details Seaworthy packings into container or bulk vessel
Material Steel Surface treatment Painted or galvanized
Width 7.3m Installation Easy
Carry capacity Resist strong wind and earthquake, bears heavy snow.etc Grade Q460b
Q345B-Q460C AISI, ASTM, BS, DIN, GB, JIS Color Army blue, light gray, or customized.etc
Application Permanent Steel Structure Bridge Brand Name FAMOUS
Model Number HD200 Certification ISO9001:2008, SGS, etc.
Place of Origin Zhejiang, China
High Light prefabricated bridgesstructural steel bridge

Q460 Structural Modular Steel Box Girder Bridge with Fast Installation

Description

 

Steel Box Girder Bridge refers to a beam bridge whose main beam is in the form of a thin-wall closed section. Long hollow trusses made of steel or concrete are usually used as beams. This makes the bridge light and sturdy. Bridges constructed using this method are called Steel Box Girder Bridge.

 

Specification

 

Product Name Steel box girder bridge
Width 4.2meter
Maximum span 64meter single span
Bridge deck Steel composit panel
Steel grade Q345B
Loading capacity 20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20
Corrosion Hot dip galvanized
Advantages Price effective and technical full analysis and supports

 

Steel box girder bridges are commonly used for highway flyovers and for modern elevated structures of light rail transport. Although normally the steel box girder bridge is a form of beam bridge, box girders may also be used on cable-stayed bridges and other forms.

 

Parts of the bridge


The basic Bailey bridge is made up of three main parts, the floor, the stringers and the side panels. The floor of the bridge is made up of a number of 19-foot-wide transoms (5.8 m) that run across the bridge. Across the bottom of these, forming a square, are 10-foot-long stringers (3.0 m). The bridge's strength is provided by the panels on the sides. The panels are 10-foot-long (3.0 m), 5-foot-high (1.5 m), cross-braced rectangles. Each weighs 570 pounds (260 kg), and can be lifted by six men.

 

Application

 

Generally used for urban bridges or highway viaducts and overpasses with small spans
Reinforced concrete: medium and small span
Prestressed reinforced concrete: large span
Straight leg frame (door type) and slant leg frame: medium and small span
T-shaped rigid frame, continuous rigid frame: large span

· Road Bridges

· Pedestrian Bridges

· Railway Bridges

· Steel Truss Bridge

· Beam Bridges

· Steel Bailey bridge

· Structural Steel Box Bridge

· Highway Bridges

· Composite Beam Bridge

· Cable-Stayed Bridge

· Floating Bridge etc.

 

Construction


For steel box girders, the girders are normally fabricated off site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast in-place using temporary falsework supported by the steel girder.

Either form of bridge may also be installed using the technique of incremental launching. Under this method, gantry cranes are often used to place new segments onto the completed portions of the bridge until the bridge superstructure is completed.

 

Features


Modular, pre-engineered, pre-fabricated bridge system
Standard interchangeable components
Highly adaptable, fully reusable and re-locatable
Transported in standard ISO containers
Quick and simple to build using labour
Fully galvanized for long life and minimum maintenance
3.048m module length
4.2m single lane
Proprietary steel decking systems to suit different loading requirements
Durbar finish or factory applied anti-skid surfacing
Full highway load carrying capability
Simple, cost effective foundations

 

Our company

 

Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.

 

 

Finally

 

The success of the Bailey bridge was due to the simplicity of the fabrication and assembly of its modular components, combined with the ability to erect and deploy sections with a minimum of assistance from heavy equipment. Many previous designs for military bridges required cranes to lift the pre-assembled bridge and lower it into place. The Bailey parts were made of standard steel alloys, and were simple enough that parts made at a number of different factories could be completely interchangeable. Each individual part could be carried by a small number of men, enabling army engineers to move more easily and more quickly than before, in preparing the way for troops and materiel advancing behind them. Finally, the modular design allowed engineers to build each bridge to be as long and as strong as needed, doubling or tripling up on the supportive side panels, or on the roadbed sections.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other

  • Year Established:

    2000

  • Total Annual:

    500 Million -600 Million

  • Employee Number:

    1200~1300

  • Ecer Certification:

    Verified Supplier

  As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.   Nowadays, under FASECBuildings Group, there are...   As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.   Nowadays, under FASECBuildings Group, there are...

+ Read More

Get in touch with us

  • Reach Us
  • FAMOUS Steel Engineering Company
  • Huafeng Road 2#, Xiacheng District, Hangzhou City, Zhejiang China
  • https://www.structural-steelbuilding.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement