Payment Terms | D/A, L/C, D/P, T/T, Western Union |
Supply Ability | 50000sqm per month |
Delivery Time | 1-4 weeks per production plan |
Packaging Details | seaworthy packings |
Material | galvanized steel GB US EU AS std. |
Type | corrugated |
Color | grey |
Zinc | up to 350g/m2 |
surface | spangle |
width | 975mm |
thickness | 1.5mm |
Surface treatment | Galvanized |
Brand Name | FASEC |
Model Number | Type 1 |
Certification | ISO, CE etc |
Place of Origin | China |
View Detail Information
Explore similar products
Galvanized Corrugated Steel Deck System Concrete Floor Deck Construction
1.2mm Gauge Galvanized Steel Decking Formwork To Bottom Of Concrete Slab
High Strength Bearing Composite Floor Deck Galvanized Metal For Steel Structure
Anti Seismic Galvanized Corrugated Steel Floor Decking Permanent Upholding
Product Specification
Payment Terms | D/A, L/C, D/P, T/T, Western Union | Supply Ability | 50000sqm per month |
Delivery Time | 1-4 weeks per production plan | Packaging Details | seaworthy packings |
Material | galvanized steel GB US EU AS std. | Type | corrugated |
Color | grey | Zinc | up to 350g/m2 |
surface | spangle | width | 975mm |
thickness | 1.5mm | Surface treatment | Galvanized |
Brand Name | FASEC | Model Number | Type 1 |
Certification | ISO, CE etc | Place of Origin | China |
High Light | composite steel floor deck ,long span composite floor deck |
Quick Detail:
1. faster erection.
2. fire-resistance.
3. high strength.
4. cost saving.
The steel deck formwork adapts to the requirements of rapid construction of the main steel structure, and can provide a firm working platform in a short time, and can use multiple floors to lay the profiled steel plate and layer the concrete slab. In the use stage, the floor slab is used as the tensile reinforcement of the concrete slab, which also increases the rigidity of the slab and saves the amount of steel and concrete. The embossing on the surface of the profiled board creates the greatest bonding force between the floor slab and the concrete, so that the two are integrated and equipped with stiffeners to make the floor slab system have high bearing capacity. In cantilever conditions, the floor panels are only used as permanent templates. The length of the cantilever can be determined according to the section characteristics of the floor panel. In order to prevent the cracking of the cantilever plate, it is necessary to match the design of the structural engineer with the negative reinforcement at the support.
Product Name | Galvanized steel floor deck formwork |
Base material | Hot dipped galvanized high strength steel sheet |
Thickness | 0.6-1.5mm |
Effective Width | 200-1100mm customized |
Height | 30-140mm per design and calculation needs |
Quality | SGCC, DX51, ASTM 653, A792, G450, G500, G550 (MPA) |
Based Zinc-coating | Up to 350g/m2 |
Our steel deck has very effective cross stiffener technology and the deep profile shape provides a very efficient metal deck and composite slab, with a low usage of concrete. It has following features:
Efficient - low use of steel and concrete.
Versatile – top or bottom flange application.
Nestable profile gives low transport and handling costs.
Following are some of typical profiles:
To complete our floor decking products we advise a complete floor slab construction by adding the supply and laying of reinforced concrete. This single point solution allows a fully integrated metal deck and concrete slab with associated trade interface and program advantages.
Composite slab which is comprised of lightly reinforced concrete cast on profiled steel decking are an option whether the beams are downstand or integrated within the slab depth for a shallow floor form of construction. The slabs are normally reinforced using an upper layer of mesh and, sometimes additional bars in the troughs (usually for longer periods of fire resistance and heavy loads). Fiber reinforcement may also be used. Spans of up to 4.5 m can be achieved using trapezoidal decking. Some so-called deep decking profiles also exist (over 200 mm deep), that can span 6 m or so without propping during construction.
While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.
The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.
So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.
Following are some typical detail:
Warmly welcome various clients from International market to enquiry and visit us!
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2000
Total Annual:
500 Million -600 Million
Employee Number:
1200~1300
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!