Payment Terms | L/C,T/T |
Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs |
Packaging Details | Seaworthy packings into container or bulk vessel |
Material | Q345B steel |
Surface treatment | Painted or hot dip.etc |
Size | According to client's need |
Installation | Lifted into place by hand without crane, easier construction.etc |
Multi-use | civil engineering construction projects and to provide temporary crossings for foot & vehicle traffic. |
Carry capacity | Resist strong wind and earthquake, bears heavy snow.etc |
Grade | Q345B-Q460C |
Q345B-Q460C | AISI, ASTM, BS, DIN, GB, JIS |
Color | Army blue, light gray, hot galvanized or customized.etc |
Brand Name | FAMOUS |
Model Number | CB100(321-Type)&HD200 |
Certification | ISO9001:2008, SGS, etc. |
Place of Origin | Zhejiang, China |
View Detail Information
Explore similar products
Temporary Steel Assembly Bridge Structure Customize Paint
Temporary Steel Bridge Railway Structure Of Stay Cable
Compact Prefabricated Bridges For Vehicular
Prefabricated Steel Bailey Bridge Modular Designed
Product Specification
Payment Terms | L/C,T/T | Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs | Packaging Details | Seaworthy packings into container or bulk vessel |
Material | Q345B steel | Surface treatment | Painted or hot dip.etc |
Size | According to client's need | Installation | Lifted into place by hand without crane, easier construction.etc |
Multi-use | civil engineering construction projects and to provide temporary crossings for foot & vehicle traffic. | Carry capacity | Resist strong wind and earthquake, bears heavy snow.etc |
Grade | Q345B-Q460C | Q345B-Q460C | AISI, ASTM, BS, DIN, GB, JIS |
Color | Army blue, light gray, hot galvanized or customized.etc | Brand Name | FAMOUS |
Model Number | CB100(321-Type)&HD200 | Certification | ISO9001:2008, SGS, etc. |
Place of Origin | Zhejiang, China | ||
High Light | prefabricated bridges ,structural steel bridge |
Description
Pedestrian bridges are needed where a separate pathway has to be provided for people to cross traffic flows or some physical obstacle, such as a river. The loads they carry are, in relation to highway or railway bridges, quite modest, and in most circumstances a fairly light structure is required. They are, however, frequently required to give a long clear span, and stiffness then becomes an important consideration. The bridges are often very clearly on view to the public and therefore the appearance merits careful attention. Steel offers economic and attractive forms of construction which suit all the requirements demanded of a footbridge.
Specification
Product Name | Prefabricated Pedestrian Bridges |
Width | 7.6meter |
Maximum span | 64meter single span and 200meter multi span |
Bridge deck | Steel composit panel |
Steel grade | Q345B (equivalent to ASTM A572) |
Loading capacity | 20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20 |
Corrosion | Original painted or Hot dip galvanized |
Advantages | Price effective and technical full analysis and supports |
History
First bridges in history were pedestrian bridges and they were made of wood. Ancient Rome started making stone bridges in the 2nd century BC over the Tiber River. Some of these ancient stone footbridges with arches still stand today. One of them is Ponte Fabricio which was built in 62 BC and it still has some of its original materials. Today, modern footbridges are made of wood, rope, metal and concrete.
Design
Design of pedestrian bridge normally follows the same principles as for other bridges. However, because they are normally significantly lighter than vehicular bridges, they are more vulnerable to vibration and therefore dynamics effects are often given more attention in design.
To ensure pedestrian bridges are accessible to disabled and other mobility-impaired people, careful consideration is nowadays also given to provision of access lifts or ramps, as required by relevant legislation.
Features
The width of a pedestrian bridge is usually quite modest, just sufficient to permit free passage in both directions for pedestrians. Occasionally the bridge will have segregated provision for pedestrians and cyclists, in which case it will need to be wider. Parapets are provided for the safety of both the pedestrians and traffic flow. Pedestrian bridgeS over railway lines are required to have higher parapets and be provided with solid panels directly over the rail tracks.
Type
Beam Bridge
Boardwalk
Clapper bridge
Duckboards, Timber track way, Plank road, and Corduroy road
Moon bridge
Simple suspension bridge
Simple truss
Stepping stones
Zigzag bridge
Characteristics
1.Environmental protection
2.Higher reliability of steel work
3.Strong quake proof
4.Higher degree of industrialization
5.Quick to be assembled accurately
6.Larger interior space
Our company
Our experienced team is focused on your steel bridge project's success, from start to finish. Our proven ability to identify and overcome design inconsistencies, potential problems with erection, and shipping obstacles results in the fabrication of structural steel that is right the first time, helping you avoid costly construction delays.
Proper project coordination and efficient delivery of the structural steel to your bridge project is a key factor in its ultimate success. This is what gives us the leading edge.
From material purchase and tracing, planning compilation, drawing detailing, production arrangement, quality inspection, to on-going painting, packing and delivering, we have separated department to strictly control process, quality and traceability, so that the perfect Bailey/Belay/Baley Bridge can be made.
Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence.
Warmly welcome all friends and clients from International market to visit us!
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2000
Total Annual:
500 Million -600 Million
Employee Number:
1200~1300
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!