Payment Terms | L/C,T/T |
Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs |
Packaging Details | Seaworthy packings into container or bulk vessel |
Material | Q345B steel |
Surface treatment | Painted or hot dip.etc |
Size | According to client's need |
Installation | Lifted into place by hand without crane, easier construction.etc |
Multi-use | civil engineering construction projects and to provide temporary crossings for foot & vehicle traffic. |
Carry capacity | Resist strong wind and earthquake, bears heavy snow.etc |
Grade | Q345B-Q460C |
Q345B-Q460C | AISI, ASTM, BS, DIN, GB, JIS |
Color | Army blue, light gray, hot galvanized or customized.etc |
Brand Name | FAMOUS |
Model Number | CB100(321-Type)&HD200 |
Certification | ISO9001:2008, SGS, etc. |
Place of Origin | Zhejiang, China |
View Detail Information
Explore similar products
Temporary Steel Assembly Bridge Structure Customize Paint
Temporary Steel Bridge Railway Structure Of Stay Cable
Compact Prefabricated Bridges For Vehicular
Prefabricated Steel Bailey Bridge Modular Designed
Product Specification
Payment Terms | L/C,T/T | Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs | Packaging Details | Seaworthy packings into container or bulk vessel |
Material | Q345B steel | Surface treatment | Painted or hot dip.etc |
Size | According to client's need | Installation | Lifted into place by hand without crane, easier construction.etc |
Multi-use | civil engineering construction projects and to provide temporary crossings for foot & vehicle traffic. | Carry capacity | Resist strong wind and earthquake, bears heavy snow.etc |
Grade | Q345B-Q460C | Q345B-Q460C | AISI, ASTM, BS, DIN, GB, JIS |
Color | Army blue, light gray, hot galvanized or customized.etc | Brand Name | FAMOUS |
Model Number | CB100(321-Type)&HD200 | Certification | ISO9001:2008, SGS, etc. |
Place of Origin | Zhejiang, China | ||
High Light | SGS Tied Arch Steel Bridge Deck ,Bowstring Arch Girder Steel Bridge Deck ,Orthotropic Bridge Deck Construction |
Tied-arch bridge (also called bowstring-arch or bowstring-girder bridge) is a type of bridge that has an arch rib on each side of the roadway (deck), and one tie beam on each arches, that support deck. Vertical ties connected to the arches support deck from above. It can be considered a bridge between arch bridge and a suspension bridge. They work like arch bridges on one hand, because force of the load on the deck (thrust) is translated as tension to the curved top chord by vertical ties of the deck which try to flatten the arch and to push its tips outward into the abutments. Tips of the arch of this bridge are tied together by a bottom chord. This allows the bridge to be constructed with less robust foundations because force on the abutments is low. Tied-arch bridges can be built on elevated piers or in areas of unstable soil. One more positive attribute of this type of bridge is that it does not depend on horizontal compression forces for its integrity which allows them to be built off-site and then transported into place.
The tied-arch offers a solution when it can be arranged that the deck is at such a level that it can carry the horizontal force as a tie member. The tied-arch is sometimes referred to as a bowstring arch.
Product Name | Design Supply Construction of Tied-Arch Steel Bridge Deck with Bowstring Arch Girder |
Width | 7.6meter or customer required sizes,etc. |
Maximum span | 64meter single span and 200meter multi-span or customized. |
Bridge deck | Steel composite panel,timber,concrete,etc. |
Steel grade | Q345B (equivalent to ASTM A572) or customized materials,etc. |
Loading capacity | 20ton, 40ton truck etc, or HS20-44, HS25-44/Truck 20 |
Corrosion | Original painted or Hot dip galvanized,army blue,etc. |
Advantages | Price effective and technical full analysis and supports |
Advantages:
A. Reasonable structure, high rigidity, clear force, high driving comfort, strong adaptability to terrain and geological conditions
B. The technical and economic indicators are relatively advanced, which can shorten the length of the approach bridge and reduce the overall cost of the bridge
C. The bridge is beautiful, reflecting the unity of power and beauty, and the harmony between the structure and the environment, which enhances the landscape effect
D. The workload of inspection, maintenance and repair is large, and it is necessary to detect the stress of the boom, check the status of the anchor, regularly replace the sealing paste, and remove and replace the boom, etc.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2000
Total Annual:
500 Million -600 Million
Employee Number:
1200~1300
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!