Payment Terms | D/A, L/C, D/P, T/T, Western Union |
Supply Ability | 50000sqm per month |
Delivery Time | 1-4 weeks per production plan |
Packaging Details | seaworthy packings |
Material | Steel decking sheet |
Type | Comflor 60 profile |
Color | Gray |
Zinc | 350g/m2 |
Surface | Galvanized |
Width | 310mm |
Thickness | 2.1mm |
Surface treatment | Galvanized |
Unpropped Spans | Up to 4.5m |
Brand Name | FASECbuildings |
Model Number | Type 2 |
Certification | ISO, CE etc |
Place of Origin | China |
View Detail Information
Explore similar products
Galvanized Corrugated Steel Deck System Concrete Floor Deck Construction
1.2mm Gauge Galvanized Steel Decking Formwork To Bottom Of Concrete Slab
High Strength Bearing Composite Floor Deck Galvanized Metal For Steel Structure
Anti Seismic Galvanized Corrugated Steel Floor Decking Permanent Upholding
Product Specification
Payment Terms | D/A, L/C, D/P, T/T, Western Union | Supply Ability | 50000sqm per month |
Delivery Time | 1-4 weeks per production plan | Packaging Details | seaworthy packings |
Material | Steel decking sheet | Type | Comflor 60 profile |
Color | Gray | Zinc | 350g/m2 |
Surface | Galvanized | Width | 310mm |
Thickness | 2.1mm | Surface treatment | Galvanized |
Unpropped Spans | Up to 4.5m | Brand Name | FASECbuildings |
Model Number | Type 2 | Certification | ISO, CE etc |
Place of Origin | China | ||
High Light | 310mm Galvanized Composite Floor Deck ,310mm Steel Decking Slab |
ComFlor 60 composite floor profile offers the ultimate in lightweight steel decking for all multi-rise buildings. It combines exceptional spanning capabilities with reduced concrete usage to provide a cost-effective and attractive floor solution that is easy to install. The state-of-the-art profile has been developed using modern roll-forming techniques. Capable of unpropped continuous spans to 4.5 metres and propped spans to 6.8 metres.
ComFlor 60 has been much copied but never bettered, as the original new generation round shouldered trapezoidal combined 60mm profile. This design is exceptionally resistant to compressive buckling resulting in superior span capability compared to traditional decks.
Long span and versatile.
Low concrete and steel usage.
Central stud placement.
Closed ends.
Better for Health and Safety.
Specifications:
Name | steel decking formwork |
Base material | Hot Dipped Galvanized Steel Sheet |
Steel Grade | SGCC |
Yield strength | Q235 or Q345 Refer to Standards GB/T1591-2008 |
Thicknes | 0.8 -1.5mm(normal 0.8,1.0,1.2) |
Zinc coating | 60-275g/m2 |
Wave Height | 51mm-76mm |
EffectiveWidth | 688mm-940mm |
Length | 0-11.8m |
Less than 5.8m load in 20GP | |
5.8m-11.8m load in 40GP | |
Packing | Bundle ,water-proof package with steel belt |
Delivery time | 20 days after confirmation |
Following are some of typical profiles available in market:
| YXB51-200-600 |
YXB65-186-558 | |
YXB60-253-760 | |
YXB60-180-540 | |
YXB51-200-600 | |
YXB65-186-558 | |
(2) Opened type galvanized steel floor decking | YX75-230-690 |
YX75-200-600 | |
YX38-152-915 | |
YX51-305-915 | |
YX76-305-915 | |
YX75-230-690 | |
YX75-200-600 | |
YX51-250-750 | |
YX51-335-1005 | |
YX76-344-688 | |
(3) swallow tail galvanized steel floor decking | YX51-200-600 |
YX51-190-760 | |
YX51-200-800 | |
YX51-200-600 |
Advantages:
Greater Durability
The steel base product has a Z350 zinc-coating mass. It was selected to provide superior corrosion protection in service, directly as a result of increased coating mass. FAMOUS steel is also available with a Z450 coating mass with a 15 year warranty*. Comprehensive shear stud welding tests across a range of base thickness with both coating masses were undertaken to ensure consistent results can be achieved on site.
Unbeatable Strength
Steel and concrete composite slabs are lighter and stronger than most conventional slabs. The steel decking provides tensile reinforcement, combining with the compressive strength of the concrete for an all round stronger slab. Steel decking profiles are designed to prevent any longitudinal slip between the steel and concrete in the slab itself, and any transverse movement between the slab and supporting beams.
Greater Savings
The weight savings achieved in composite slabs can be passed on to other areas of the design, such as foundations. And because steel decking acts as permanent formwork, it can significantly reduce the need for propping or temporary formwork -saving both time and money.
While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.
The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.
So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.
Following are some typical detail:
Warmly welcome various clients from International market to enquiry and visit us!
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Agent,Importer,Exporter,Trading Company,Seller,Other
Year Established:
2000
Total Annual:
500 Million -600 Million
Employee Number:
1200~1300
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!