China factories

China factory - Yixing Boyu Electric Power Machinery Co.,LTD

Yixing Boyu Electric Power Machinery Co.,LTD

  • China
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China TY150 Hydraulic Puller Power Line Stringing Equipment German Rexroth Main Pump
China TY150 Hydraulic Puller Power Line Stringing Equipment German Rexroth Main Pump

  1. China TY150 Hydraulic Puller Power Line Stringing Equipment German Rexroth Main Pump
  2. China TY150 Hydraulic Puller Power Line Stringing Equipment German Rexroth Main Pump

TY150 Hydraulic Puller Power Line Stringing Equipment German Rexroth Main Pump

  1. MOQ: 1set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms L/C, T/T
Supply Ability 100sets/month.
Delivery Time 15~25 days
Packaging Details Container
Type Hydraulic Puller Power Line Stringing Equipment
Max intermittent pulling force 150 kN
Overall dimension (length*width*height) 4800*2350*2470 mm
Engine Cummins
Model Straight type six-cylinder pressurizing four-stroke diesel engine
Rotary speed when maximum torque 1500 r/min
Brand Name BOYU
Model Number TY150
Certification ISO9001
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms L/C, T/T Supply Ability 100sets/month.
Delivery Time 15~25 days Packaging Details Container
Type Hydraulic Puller Power Line Stringing Equipment Max intermittent pulling force 150 kN
Overall dimension (length*width*height) 4800*2350*2470 mm Engine Cummins
Model Straight type six-cylinder pressurizing four-stroke diesel engine Rotary speed when maximum torque 1500 r/min
Brand Name BOYU Model Number TY150
Certification ISO9001 Place of Origin China
High Light hydraulic overhead line stringing toolsconductor stringing toolstransmission line stringing machine

TY150 Hydraulic Puller Power Line Stringing Equipment German Rexroth Main Pump

 

Structure parameter Pulling wheel diameter: 600 mm
  Groove number: 9
  Max diameter of applicable pulling rope: 26 mm
  Weight: 6600 kg
  Overall dimension (length*width*height): 4800*2350*2470 mm
  Hoisting mode: Single point

 

Main technical performance parameter Max intermittent pulling force: 150 kN
  Max continuous pulling force: 120 kN
  Corresponding speed: 2.5 km/h
  Max continuous tractive speed: 5 km/h
  Corresponding pulling force: 60 kN

 

Electric system Storage battery: 24V electric starting
  System voltage: 24V

 

Engine Type: Cummins 6CTA8.3-C260
  Model: Straight type six-cylinder pressurizing four-stroke diesel engine
  Cylinder diameter * stroke: 114*135 mm
  Total air output: 8.3 L
  Rated speed: 2200 r/min
  Rated power (one hour power): 194 kw
  Max torque: 1135 Nm
  Rotary speed when maximum torque: 1500 r/min
  Fuel consumption rate (bench test): 238 g/kw.h
  Cooling method: forced air cooling

 

Auxiliary oilway hydraulic system Open type constant displacement throttle speed governing hydraulic system is supplied oil by gear pump and controls oil liquor’s cooling and hoisting tail bracket’s lifting of the whole hydraulic system through hand operated direction valve and ball valve.
  System working pressure: 12Mpa
  Duplex gear pump: 1PF2G2-4X/016+014RR20MRL
  Fan motor: GM5-12-1FE13-S-20
  Hoisting motor: J2K-305
  Sleeve extension oil cylinder: 3TG110×250
  Radiator: B5024

 

 

Taking puller’s place

1. Haul puller into selected field to put; make incoming line groove of pulling wheel aim to rod tower center as much as possible; the deviation range is ±7°to reduce lateral load. The laying location and rod tower shall be 100m~150m apart, when deviating from this range, the pulling wheel and pulling wheel cover shall be worn out in the process of traction.

2. After determining the location of puller, start adjusting working location of puller (given as figure 1). Retract fore stabilizer completely; make back stabilizer be adjusted to suitable location and insert pin shaft. Here the puller is in working position.

3. Anchoring puller (given as figure 3). Center stressing direction of anchor bed shall align with stretch direction of anchor in order to make anchor bear pulling force and not bear lateral force. When anchoring, anchor block, steel wire rope loop, shackle, lever block or double hook with above 10-ton stress shall be used; directly pre-tension the anchor after jointing.

4. Two anchor points in the forepart of puller are to adjust the consistency of puller and wire tower direction. If the deviation of puller and wire tower is more than 10°, the double-end anchor in the forepart shall be adjusted to correct.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    1997

  • Total Annual:

    15000000-20000000

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Established in 1993, Yixing Boyu Electric Power Machinery Co., Ltd. is a manufacturer specialized in the research, development and production of Electric Power Machinery, CE certified. We are located in beautiful and rich city: Yixing city. We are a High-tech enterprise in Jiangsu Province, with ... Established in 1993, Yixing Boyu Electric Power Machinery Co., Ltd. is a manufacturer specialized in the research, development and production of Electric Power Machinery, CE certified. We are located in beautiful and rich city: Yixing city. We are a High-tech enterprise in Jiangsu Province, with ...

+ Read More

Get in touch with us

  • Reach Us
  • Yixing Boyu Electric Power Machinery Co.,LTD
  • https://www.stringingequipments.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement