China factories

China factory - CHINA HARZONE INDUSTRY CORP.,LTD.

CHINA HARZONE INDUSTRY CORP.,LTD.

  • China,Wuhan ,Hubei
  • Verified Supplier

Leave a Message

we will call you back quickly!

Submit Requirement
China Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge
China Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge

  1. China Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge

Sefl Fold And Unfold 21 Meters Army Temporary Bridge Emergency Bridge

  1. MOQ: negotiation
  2. Price:
  3. Get Latest Price
Payment Terms According to detailed order
Delivery Time negotiation
Packaging Details According to detailed order
Product Name Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge
Material Metal
Feature fast erection
Status Sefl Fold and Unfold
High loading capacity 60t
Usage overcoming dry gaps
Condition new equipment
Brand Name Harzone
Place of Origin China

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms According to detailed order Delivery Time negotiation
Packaging Details According to detailed order Product Name Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge
Material Metal Feature fast erection
Status Sefl Fold and Unfold High loading capacity 60t
Usage overcoming dry gaps Condition new equipment
Brand Name Harzone Place of Origin China
High Light 21 Meters Army Temporary BridgeSefl Fold Army Temporary BridgeUnfold Emergency Bridge

Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge

Introduction of Mechanized Bridge

Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge is a set of mechanized bridge equipment carried by vehicle, accomplishing bridge erection and retrieval by itself.

 

Main Features of Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge

 

1 Fast erection: 10min

2 Less operators: 2-3

3 Excellent cross country performance: using 8×8 militarycross country chassis

4 High level of mechanization & low labor intensity: using remote control operation

5 High loading capacity: Tracked load-60t, wheeled load-13t

 

Basic composition of Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge

 

The span is folded on the chassis when transportation and erected by chassis. The auxiliary equipment is used to help with erecting and fixing.It is mainly composed of chassis,span and auxiliary equipment.

 

Usage of Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge

 

Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge  is main used as 21m long, 3.3m wide short-lived stations for overcoming small medium rivers, dry gaps and craters, guarantee all kinds of vehicles with a tracked load of up to 60 tons or an axle load of up to 13 tons to go across quickly.

 

 

Sefl Fold And Unfold 21 Meters Mechanized Bridge Emergency Bridge Picture

 

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter,Trading Company

  • Year Established:

    1967

  • Total Annual:

    200 Million USD-205 Million

  • Employee Number:

    2000~2000

  • Ecer Certification:

    Verified Supplier

China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China.   Harzone Industry has the qualification of design, manufacturing and installing ... China Harzone Industry Corp., Ltd. ,built in 1967, is the subsidiary of China State Shipbuilding Corporation Limited(CSSC) and one military enterprise whose conservation was given priority status in China.   Harzone Industry has the qualification of design, manufacturing and installing ...

+ Read More

Get in touch with us

  • Reach Us
  • CHINA HARZONE INDUSTRY CORP.,LTD.
  • No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
  • https://www.steel-trussbridge.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement