Payment Terms | L/C, T/T |
Supply Ability | 5000 Ton Per Month |
Delivery Time | 30 work days |
Packaging Details | Standard Container |
Bracing | Round Steel Tube |
Column | Hot-Rolled Steel |
Connection | Bolts Connection |
Design Parameter | Wind Load, Snow Load and Earthquake |
Main Steel Frame | H Steel,Z or C Purlin |
Our Service | Design, Fabrication |
Brand Name | XGZ |
Model Number | XGZ |
Certification | GB, CE, ISO, TUA |
Place of Origin | China Qingdao |
View Detail Information
Explore similar products
Customizable Steel Structure Warehouse Building With Rolling Door
Galvanized Metal Buildings Workshop Steel Structure ISO Certificate
Customized Steel Structure Warehouse Industrial Prefabricated Metal Buildings
Anti Rust Painting Metal Workshop Buildings Prefabricated Metal Warehouse ODM
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 5000 Ton Per Month |
Delivery Time | 30 work days | Packaging Details | Standard Container |
Bracing | Round Steel Tube | Column | Hot-Rolled Steel |
Connection | Bolts Connection | Design Parameter | Wind Load, Snow Load and Earthquake |
Main Steel Frame | H Steel,Z or C Purlin | Our Service | Design, Fabrication |
Brand Name | XGZ | Model Number | XGZ |
Certification | GB, CE, ISO, TUA | Place of Origin | China Qingdao |
High Light | Plant Building Prefabricated Steel Structure Warehouse ,Hot Dip Galvanized prefabricated steel warehouse ,Hot Dip Galvanized prefab steel warehouse |
Hot-dip Galvanized Steel Structure Whole House System Plant Building
Company Profile
Xinguang Zheng Group was established in 1997, after more than 20 years of steady development, it has now become a high-tech, diversified and export-oriented international private enterprise integrating research and development, design, production, installation and construction and service.
Project Cases
Project Name: Zhongjie Era Overpass Project Address: Qingdao, China Project Brief Description:Zhongjie Era Overpass Project is Pingdu's first cross-street bridge project, the whole project consists of three overpasses, the east side of the straight overpass bridge length 56.3 meters wide 5 meters, the west side of the straight overpass bridge length 49 meters wide 5 meters, the middle of the circular overpass main bridge diameter 56 meters, petal shape, the narrowest 6.5 meters wide 12 meters. |
![]() |
Project name:Guangming Conference Center of China Flower Expo Project address:Shanghai, China Project Brief Description: China Flower Expo Shanghai Guangming Convention Center project is located in Dongfeng Farm, Chongming District, Shanghai, covering an area of about 2000 ㎡. It is a steel and wood mixed structure. The main steel structure project is undertaken by XGZ, which adopts pipe truss structure for production and installation. After the completion of the project, it will be used to hold conferences and press conferences during the Expo. |
![]() |
Project name: Audi Exhibition Hall in Uruguay Project address:Montevideo, Uruguay Project Brief Description: The project building area is 4,587 square meters. It contains exhibition hall and workshop, and is the first Audi 4S shop in Montevideo, the frame of the exhibition hall part is truss structure, while that of the workshop is portal steel frame. The wall enclosure is made of 100mm thick PU composite panel and sandwich panel; the roof enclosure made of 100mm thick foam composite panel (weight of foam 20kg). |
![]() |
Project name:Testing Plant in Israel Project address:Israel Area:610 square meters Completion time:the year of 2020 Application:Car testing center This project adopts circle-castellated steel beams and square tube trusses,all structures were treated with hot-dip galvanized. |
![]() |
Customer Service
3D DESIGN | 3-Dimensional Design |
360 Degree All-side Display |
SOLUTION | Professional Project Analysis Engineer |
Customized and Detailed Drawing | |
Thorough and Safe Erection Plan |
PRE-ASSEMBLING | Production Pre-assembling |
Connection Match Testing | |
Production Quality Guarantee |
PACKING | Packing |
Quality Guarantee | |
Reasonable Space Distribu |
OUR CLIENTS OVERSEA | Sincere Smile |
Thanksgiving Reception | |
Faithful Communication |
CHASING DREAMSCHASING DREAMS
WITH EACH PASSING DAYWITH EACH PASSING DAY
1997 - 2002 | (2002) The first steel structure production line was completed and put into operation, and the company completed the transformation from steel trade to steel structure material production and trade (2002) Qingdao Xinguangzheng Steel Structural Materials Co., Ltd. was established, which opened a new division in the history of Xinguangzheng development and opened a new milestone in the history of Xinguangzheng development (2001) The first C-type steel production equipment was put into operation, and the production and processing scope continued to expand (2000) The first composite plate production line was launched, and the processing scope was further expanded (1997) The purchase of the first wave tile press marked the company's entry into the era of steel structure material processing from steel marketing; The company entered the era of steel structure material processing by steel consignment (1997) Invested in the construction of the factory, Pingdu Guangzheng Industry and Trade Co., Ltd. was established | ||
2003 - 2008 | (2008) International business companies have been established, international business has entered a stage of rapid development, investment and construction of steel business has entered a stage of rapid development, investment and construction of a steel structure plant, while two steel structure production lines have been put into use, while two steel structure production lines have been put into use (2006) Obtained the second-class qualification of steel structure construction (2005) Completed the transformation from steel structure material trade to steel structure engineering transformation project (2004) Invested in the construction of steel structure supporting plant area, specializing in the production of steel structure engineering maintenance materials (2004) Obtained the Grade 3 qualification of steel structure construction (2003) The construction of steel structure project started | ||
2009 - 2013 | (2013) Invested in the construction of the third steel structure plant, and built the container house production workshop in the same year (2012) The company takes the management of PK work and profit amplification as the main line, and continues to deepen and improve the main line, continue to deepen and improve (2011) Obtained the high-tech enterprise Certificate (2010) Determine three strategic adjustments: talent structure, product structure, business structure three structural adjustments, marking the product structure, business structure three structural adjustments, marking the company began to enter the stage of standardized management (2009) The company proposed strategic transformation: From management-oriented to management-oriented, from management-oriented to management-service-oriented, from management-oriented to management-service-oriented, from leader-driven development to leader-driven, employee transformation, from leader-driven development to leader-driven, employee driven development, to the leading product extension and bigger, do to promote development, Extend to the leading products and make them bigger, stronger, do fine transformation, do fine transformation | ||
2013 - 2016 | (2016) Obtained the Grade 3 qualification of general contracting for construction. The company established the strategy of "informatization" and "going out", and set up branches in Algeria and Ethiopia (2015) Won the famous trademark of Shandong Province (2014) Obtained the first-class qualification certification of professional contracting of steel structure engineering (2013) Determined to take corporate financial data as management guidance and prepare for the listing of enterprises | ||
2016 - future | (2020) Enterprise platform, ecological chain and trust chain construction, self-fission system construction (2019) India Joint venture was established (2018) The "four new models" help the development of "steel structure +" : new products, new technologies, new models, and new formats (2017) proposed to build the whole industrial chain based on "steel structure +"; Obtained the Ministry of Commerce and SASAC issued the enterprise credit evaluation AAA credit enterprises (2016) contracted the construction of the new factory area of Levy and Joint-stock Company, laying a solid foundation for the development of the company's general contract project in the later stage (2016.10) Obtained the qualification certificate of foreign contracted projects |
Company Details
Business Type:
Manufacturer,Trading Company,Seller
Year Established:
1997
Total Annual:
100,000,000-200,000,000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Qingdao Xinguangzheng Husbandry Co., Ltd. is a subsidiary company of Qingdao Xinguangzheng Group. The company is an integrated company integrating R&D, manufacturing, engineering installation and intelligent animal husbandry equipment. The company has always been committed to using the most a... Qingdao Xinguangzheng Husbandry Co., Ltd. is a subsidiary company of Qingdao Xinguangzheng Group. The company is an integrated company integrating R&D, manufacturing, engineering installation and intelligent animal husbandry equipment. The company has always been committed to using the most a...
Get in touch with us
Leave a Message, we will call you back quickly!