Payment Terms | L/C, T/T |
Supply Ability | 10000 pieces for month |
Delivery Time | 30-45 days |
Packaging Details | 40 HQ |
Beam | Welded H-Beam Steel |
Surface Treatment | Hot DIP Galvanized, Painted |
Roof Panel | Sandwich Panel, Composite Panel, Steel Plate |
Wall Panel | Sandwich Panel, Composite Panel, Steel Plate |
Design Software | Pkpm, Auto CAD, 3D3s, Tekla, Sap2000 |
Size | Costomers′ Requirements |
Brand Name | XGZ |
Model Number | H section steel |
Certification | ISO,CE,SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Customized Construction Prefabricated Steel Structure Workshop With Fire-Proof
AISC Prefab Warehouse Building Steel Structure Modular Economical
Commercial Prefab Warehouse Building Galvanized Steel Structure
Insulated Panels Prefabricated Steel Buildings Light Q345 Hot Rolled
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 10000 pieces for month |
Delivery Time | 30-45 days | Packaging Details | 40 HQ |
Beam | Welded H-Beam Steel | Surface Treatment | Hot DIP Galvanized, Painted |
Roof Panel | Sandwich Panel, Composite Panel, Steel Plate | Wall Panel | Sandwich Panel, Composite Panel, Steel Plate |
Design Software | Pkpm, Auto CAD, 3D3s, Tekla, Sap2000 | Size | Costomers′ Requirements |
Brand Name | XGZ | Model Number | H section steel |
Certification | ISO,CE,SGS | Place of Origin | China |
High Light | SGS Prefab Steel Warehouse Buildings ,Prefab Steel Warehouse Buildings Customized ,SGS Steel Warehouse Buildings |
1.Product description
Steel structure warehouse building is a new type of building structure system. The main steel frame consists of columns and beams. The secondary structure uses C/Z steel, Angle steel, round pipe processing. An enclosed structure is made up of walls and a roof, plus doors and Windows. It has the characteristics of large span, high strength, light weight and flexible layout.
Steel warehouses usually cost less than concrete buildings. The construction process of prefabricated steel structures is usually less likely to delay other buildings. All drilling, cutting and welding is done at the factory and parts are then shipped to the construction site for installation. Since only the parts are assembled on site, there is little additional cost.
And this steel structure prefabricated warehouse assembly technology requirements are not high. Almost anyone can do it, reducing labor costs and saving time.
The steel warehouse can be assembled quickly. It takes at least a few months to build an ordinary building. To build a warehouse of the same size, the construction period of steel structure warehouse is only 1/3 of that of other buildings.
2. Product specifiactions
Main Patrs | Item Parts | Specifications |
Main Steel Frame | steel beam | Q355B welded H type steel |
steel column | Q355B welede H type steel | |
Bracing Parts | brace | Q235B,Q345B round steel hot-dip galvanizing |
roof purlin | C or Z kind steel galvanizing | |
wall purlin | C or Z kind steel galvanizing | |
roof | EPS sandwich panel, fiber-galss sandwich panel, rock wall sandwich panel | |
wall | EPS sandwich panel, fiber-glass sandwich panel, rock wall sandwich panel | |
Accessories | bolts | Ordinary bolts, anchor bolts, expansion bolts,baslet bolts |
gutter | Galvanized steel plate,stainless steel | |
windows | alumium alloy glass window,aluminum alloy shutter window | |
doors | sliding or rolling window | |
downpipe | PVC pipe,PUC pipe | |
edge cover | Color steel sheet,thickness is 0.5mm |
3. Product installation
We can send you install munual and videos to help you build the prefabricated steel structure. If you need the install guidence, we will teel our engineer to your country to help you.
4.Quotation
The following question we need to know before making the price. Just feel free to fill what you know.
1 | Location (where will it be built?) | _____country, area |
2 | Size: length*width*height | ____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | ____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | ____kn/m2, _____mm |
5 | anti-earthquake | ___level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | ____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | ____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Company Details
Business Type:
Manufacturer,Trading Company,Seller
Year Established:
1997
Total Annual:
100,000,000-200,000,000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Qingdao Xinguangzheng Husbandry Co., Ltd. is a subsidiary company of Qingdao Xinguangzheng Group. The company is an integrated company integrating R&D, manufacturing, engineering installation and intelligent animal husbandry equipment. The company has always been committed to using the most a... Qingdao Xinguangzheng Husbandry Co., Ltd. is a subsidiary company of Qingdao Xinguangzheng Group. The company is an integrated company integrating R&D, manufacturing, engineering installation and intelligent animal husbandry equipment. The company has always been committed to using the most a...
Get in touch with us
Leave a Message, we will call you back quickly!