Payment Terms | T/T, L/C |
Supply Ability | 5000-9000 tons Per Month |
Delivery Time | 35-55 days |
Packaging Details | steel pallet & wooden box or in bulk |
Profile | Hot rolled H steel |
Material | Q355b, Q235b |
Technician | Free technical support |
Design | Custom exactly as the demands |
Drawing | 3D model and installing drawing available |
Production | Finished for direct install support |
Coating | Alkyd painting, Epoxy painting, Hot dip galvanized |
Insulation | EPS, Glasswool, Rockwool, PU On option |
Standard | Different standards on option as demands |
Install | Online guide support & On-site install |
Service life | 30-50 years |
Visit | Acceptable |
Brand Name | KXD |
Model Number | KXD-SW6 |
Certification | ISO9001:2008 |
Place of Origin | China Qingdao |
View Detail Information
Explore similar products
Portal Frame Steel Structure Building Construction For Prefabricated Commercial
Prefab Commercial Steel Building Metal House Storage Warehouse Office Constructi
Multi Storey Prefabricated Steel Building Commercial Construction Metal
Customized Commercial Steel Building Construction Quick And Easy Installation
Product Specification
Payment Terms | T/T, L/C | Supply Ability | 5000-9000 tons Per Month |
Delivery Time | 35-55 days | Packaging Details | steel pallet & wooden box or in bulk |
Profile | Hot rolled H steel | Material | Q355b, Q235b |
Technician | Free technical support | Design | Custom exactly as the demands |
Drawing | 3D model and installing drawing available | Production | Finished for direct install support |
Coating | Alkyd painting, Epoxy painting, Hot dip galvanized | Insulation | EPS, Glasswool, Rockwool, PU On option |
Standard | Different standards on option as demands | Install | Online guide support & On-site install |
Service life | 30-50 years | Visit | Acceptable |
Brand Name | KXD | Model Number | KXD-SW6 |
Certification | ISO9001:2008 | Place of Origin | China Qingdao |
High Light | Modern Prefabricated Commercial Steel Buildings ,InsulatedPrefabricated Commercial Steel Buildings ,Commercial Prefab Metal Office Buildings |
Modern Design Insulated Prefab Steel Support Office Shopping Mall Building
Steel structure frame Buildings | ||
Main components | Base | Cement and steel foundation bolts |
Main frame | H-section steel | |
Material | Q235B, Q345B or others as buyers' requests. | |
Purlin | C / Z Steel: Size from C120~C320, Z100~Z20 | |
Bracing | X-type or other type bracing made from angle, round pipe | |
Bolt | High-strength bolt, ordinary bolt | |
Roof & wall | Sandwich panel or Single steel sheet | |
Door | Sliding door / Rolling door / Securing door | |
Window | Aluminium alloy frame | |
Surface | Total four layers of Anti-rust Painting or Galvanized | |
Application | 1. workshop/ warehouse/factory 2. Storage/ garage/shed,/hanger 4. steel building, metal building, modular house |
Wall & Roof System | |
Roof panel | Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU) |
Wall panel | Corrugated steel plate or sandwich panel (EPS/fiber glass/rock wool/PU) |
Edge cover | 0.5mm color plate, angle Alu. |
Fittings & accessories | Nails, glue etc. |
Unpowered ventilator | Diameter Φ500, stainless steel |
Sky lighting band | 1.2mm FRP, double layer |
Sliding door | sandwich panel door |
Roof drainage system | |
Gutter | 2mm galvanized gutter |
Rainspout pipes | Φ110 PVC pipe |
Advantages of prefabricated steel structure buildings
1. Cost Savings
Price per square meter can be 25%-30% lower than conventional steel buildings. Site erection cost is low because of faster erection times and easier erection process.
2. Quick Erection
All steel components are fabricated at the factory and linked by bolts at the site. So the erection process is fast, step by step, easy to install and requires simple equipment. 60% less construction time required compared with the tradtional R.C.C(reinforced concrete) building.
3. Flexibility
Pre-engineered steel buildings are flexible in any requirement of design, easy to expand in the future and also economically with low transportation costs.
4. Energy Efficiency
Nowadays, pre-engineered buildings are the green solution for the environment with CO2 reduction, energy efficiency, and recyclability.
How to get a quick quotation from us?
1, Project built location?
2, What is your building usage?
3, Load of the building: Wind speed(KM/H), Snow load(KG/M2), Earthquake
If you really do not know, we will design it according our experience according to the same location projects.
4, Size: Width* Length * Eave Height
Accept the internal column or not if your building more than 30m weight.
5,Roof and wall coverage material?
6,Window and Door sizes and quantity?
7,Any mezzanine? Any crane? Other special demands?
More details could let us know more about your project. When we make the design and quotation, we could consider and check together. As steel structure is one whole system, any change maybe cause many changes. So the fewer uncertain matters, the better.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2002
Total Annual:
150000,000-150000,000
Employee Number:
100~1000
Ecer Certification:
Verified Supplier
Our Company Qingdao KXD Steel Structure Co., Ltd, is a professional enterprise specializing in designing, detailing, manufacturing, and constructing high quality steel structures, prefabricated houses and container houses. In order to render our clients with impeccable products and... Our Company Qingdao KXD Steel Structure Co., Ltd, is a professional enterprise specializing in designing, detailing, manufacturing, and constructing high quality steel structures, prefabricated houses and container houses. In order to render our clients with impeccable products and...
Get in touch with us
Leave a Message, we will call you back quickly!