Payment Terms | L/C, D/A, T/T, Western Union, MoneyGram |
Supply Ability | 50000 ton each month |
Delivery Time | 10 working days |
Packaging Details | Standard Seaworthy Packaging. 1, First layer, film wrapped 2, Second layer, Corrugated Paper 4, Outside Plastic Package 5, Side with steel protection circles. |
Type | cuplock scaffolding system |
Surface treatment | Galvanized,Painting |
Application | Building Construction |
Thickness | 3.2mm |
Technique | CO Arc Welded |
Color | red,blue,yellow |
Brand Name | JET |
Model Number | CS |
Certification | SGS |
Place of Origin | China |
View Detail Information
Explore similar products
Metal Painted Cuplock Scaffolding System Kwikstage Quick Stage Scaffolding
Building Cuplock Scaffolding System Cuplock Ledger British Standard Environmenta
Hot Dip Galvanized Cuplock Scaffolding System Cuplock Scaffolding Accessories
Metal Painted Cuplock Scaffolding System Kwikstage Quick Stage Scaffolding
Product Specification
Payment Terms | L/C, D/A, T/T, Western Union, MoneyGram | Supply Ability | 50000 ton each month |
Delivery Time | 10 working days | Packaging Details | Standard Seaworthy Packaging. 1, First layer, film wrapped 2, Second layer, Corrugated Paper 4, Outside Plastic Package 5, Side with steel protection circles. |
Type | cuplock scaffolding system | Surface treatment | Galvanized,Painting |
Application | Building Construction | Thickness | 3.2mm |
Technique | CO Arc Welded | Color | red,blue,yellow |
Brand Name | JET | Model Number | CS |
Certification | SGS | Place of Origin | China |
High Light | cup and lock scaffolding ,cuplock shuttering system |
China supplier metal cross lock scaffolding system cuplock Scaffolding System Pipe/Parts List
Cuplock scaffolding system use for building bridges and engineering construction
1. One set of Cuplock Scaffolding usually include 4 standards and 8 ledgers.
2. Cuplock Scaffolding is easy and quick to install and strip.which can save your time.
3. Cuplock Scaffolding provides high loading capacity while its structure is quite flexible.
4. All the Cuplock Scaffolding parts are dealt with CO2 arc welding, the surface is galvanized. As a result, it is more durable and has a longer working life
5.There is small lock pin on Cuplock verticals to restrict the cups from moving out. so you don't worry to lost ancillaries
1.Standard
Model | Specification(mm) | Theoretical weight(kg) | Thickness |
LG-60 | Φ 48.3x3.5x600 | 4.06 | 2.75-3.5mm |
LG-90 | Φ 48.3x3.5x900 | 5.6 | |
LG-120 | Φ 48.3x3.5x1200 | 7.41 | |
LG-150 | Φ 48.3x3.5x1500 | 8.91 | |
LG-180 | Φ 48.3x3.5x1800 | 10.61 | |
LG-210 | Φ 48.3x3.5x2100 | 12.21 | |
LG-240 | Φ 48.3x3.5x2400 | 14.02 | |
LG-300 | Φ 48.3x3.5x3000 | 17.31 | |
ZQ-220 | Φ 48.3x3.5x2200 | 10.45 | 3.5mm |
ZQ-240 | Φ 48.3x3.5x2400 | 11.22 | 3.5mm |
2. Ledger
Model | Specification(mm) | Theoretical weight(kg) | Thickness |
HG-30 | Φ 48.3x3.5x300 | 1.67 | 2.75-3.5mm |
HG-60 | Φ 48.3x3.5x600 | 2.28 | |
HG-90 | Φ 48.3x3.5x900 | 3.97 | |
HG-120 | Φ 48.3x3.5x1200 | 5.12 | |
HG-150 | Φ 48.3x3.5x1500 | 6.28 | |
HG-180 | Φ 48.3x3.5x1800 | 7.43 | |
HG-240 | Φ 48.3x3.5x2400 | 9.73 | |
HG-65 | Φ 48.3x3.5x650 | 3.02 | |
HG-95 | Φ 48.3x3.5x950 | 4.17 | |
HG-125 | Φ 48.3x3.5x1250 | 5.32 | |
HG-155 | Φ 48.3x3.5x1550 | 6.48 | |
HG-185 | Φ 48.3x3.5x1850 | 7.63 |
3.Brace
Item Number | Length(mm) | Diameter(mm) | Thickness(mm) |
SSC-C3-1800*1500 | 1800*1500 | 48.3 | 2.5 |
SSC-C3-1800*2000 | 1800*2000 | 48.3 | 2.5 |
SSC-C3-2500*1500 | 2500*1500 | 48.3 | 2.5 |
SSC-C3-2500*2000 | 2500*2000 | 48.3 | 2.5 |
Cuplock Scaffolding construction galvanized painted
JET SCAFFOLDING which is one of the largest Scaffolding R&D, manufacturing and trading group company in China, our products follow SGS, TUV, EN39, EN71, we are able to best serve our customers by providing a one-stop shopping & service company, scaffolding system, frame systems, galvanized steel tube, steel prop and the accessories are all available in our group.
Product Details
Name | cuplock scaffold |
Place of Origin | Guangzhou China |
Brand name | JET |
Main Material | Q235 steel |
Surface Treatment | Hot Dip Galvanized,Dip Painted,Galvanized |
Color | Silver |
Certificate | SGS ,CE |
Service | OEM Service available |
Delivery Time | About 20-30 days after confirmation |
Packing | in bulk or steel pallet or as your request |
production capability | 100 tons per day |
Manufactory Location | Guangzhou, China |
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2012
Total Annual:
8000000-10000000
Employee Number:
50~80
Ecer Certification:
Active Member
Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China. Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop se... Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China. Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop se...
Get in touch with us
Leave a Message, we will call you back quickly!