China factories

China factory - Guangzhou Jet Scaffold & Formwork System Co., Ltd.

Guangzhou Jet Scaffold & Formwork System Co., Ltd.

  • China,Guangzhou ,Guangdong
  • Active Member

Leave a Message

we will call you back quickly!

Submit Requirement
China Building Walkway Steel Scaffold Planks Scaffolding Walk Boards Catwalk
China Building Walkway Steel Scaffold Planks Scaffolding Walk Boards Catwalk

  1. China Building Walkway Steel Scaffold Planks Scaffolding Walk Boards Catwalk
  2. China Building Walkway Steel Scaffold Planks Scaffolding Walk Boards Catwalk
  3. China Building Walkway Steel Scaffold Planks Scaffolding Walk Boards Catwalk

Building Walkway Steel Scaffold Planks Scaffolding Walk Boards Catwalk

  1. MOQ: 100 set
  2. Price: Negotiable
  3. Get Latest Price
Payment Terms Western Union, L/C, T/T
Supply Ability 3000 PCS per day
Delivery Time 7 days
Packaging Details standard or as per your requirements
Produce Name Steel plank
Surface Treatment Pre-galvanized
Processing Antiskip and Perforated
Size 1000,2000,3000,4000mm
Material Q195,Q235,Q345,
Type Scaffolding parts
Brand Name jet
Model Number L3000mm
Certification SGS,EN
Place of Origin Guangzhou

View Detail Information

Contact Now Ask for best deal
Get Latest Price Request a quote
  1. Product Details
  2. Company Details

Product Specification

Payment Terms Western Union, L/C, T/T Supply Ability 3000 PCS per day
Delivery Time 7 days Packaging Details standard or as per your requirements
Produce Name Steel plank Surface Treatment Pre-galvanized
Processing Antiskip and Perforated Size 1000,2000,3000,4000mm
Material Q195,Q235,Q345, Type Scaffolding parts
Brand Name jet Model Number L3000mm
Certification SGS,EN Place of Origin Guangzhou
High Light aluminium builders planksscaffolding walkway planks

Q235 scaffolding material perforated steel plank for construction,steel plank scaffolding walking board catwalk

 

Specifications

 

1. A larger capacity

When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to 15kN ~ 35kN (1.5tf ~ 3.5tf, design value).

 

2.  Easy disassembly, erection and flexible

Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

 

3. To compare the economy

Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about 15 kg.

 

Some popular sizes for reference:

Size (mm) Weight (kg/pc) Size (mm) Weight (kg/pc)
WALK BOARDS CATWALK
210 x 45 x 1.2 x 4000 13.60 500 x 50 x 1.2 x 1829 15.50
210 x 45 x 1.2 x 3000 10.26 480 x 45 x 1.2 x 1829 13.50
210 x 45 x 1.2 x 2000 6.93 450 x 45 x 1.2 x 1829 13.00
210 x 45 x 1.2 x 1000 3.59 450 x 38 x 1.2 x 1829 12.50
240 x 45 x 1.2 x 4000 14.87 420 x 45 x 1.2 x 1829 12.50
240 x 45 x 1.2 x 3000 11.23 500 x 50 x 1.2 x 1219 11.00
240 x 45 x 1.2 x 2000 7.59 480 x 45 x 1.2 x 1219 10.00
240 x 45 x 1.2 x 1000 3.94 450 x 45 x 1.2 x 1219 9.50
250 x 50 x 1.2 x 4000 15.67 450 x 38 x 1.2 x 1219 9.00
250 x 50 x 1.2 x 3000 11.84 420 x 45 x 1.2 x 1219 9.00
250 x 50 x 1.2 x 2000 8.00 330 x 50 x 1.2 x 1829 11.50
250 x 50 x 1.2 x 1000 4.15 330 x 50 x 1.2 x 1219 8.50
GALVANIZED SCAFFOLDING PIPE SCAFFOLDING COUPLER
48.3 x 4.0 x 6000 27.00 Double Coupler Swivel Coupler
48.3 x 3.6 x 6000 24.52 Sleeve Coupler Inner Joint Pin
48.3 x 3.2 x 6000 21.99 Putlog Coupler Girder Coupler
48.3 x 3.0 x 6000 20.71 Limpet Coupler Ladder Clamp
48.6 x 2.4 x 6000 16.89 Steel Prop Base Jack

Advantages:

(1) Strong bearing capacity.

(2) Duabale & stable.

(3) Easy to assemble & dismantle.

(4) Corrode-resistant, slip prevention, anti-fire, less weight.

(5) Excellent security function.

(6) Long durability, the working life can up to 5-8 years.

 

Delivery: within 10 days after receive deposit

Package: in bulk or in bundles, as per client's request (generally in 40'HQ)

 

Company Information

Company Name Guangzhou Jet caffold&formwork System Co., Ltd
  ISO9001:2015 certified factory for manufacturing and sales of scaffolding
  19years, 120 workers, 60,000 Sqm2 flooring
  Auto-welding lines, HDG and painting lines
Certification AS/NZS 1576, ANSI SSFI,SGS,GE
Main Products Scaffolding pipe, Ringlock Scaffold, Cuplock Scaffold,Steel plank,Scaffolding ouplers, Formwork etc.

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Exporter

  • Year Established:

    2012

  • Total Annual:

    8000000-10000000

  • Employee Number:

    50~80

  • Ecer Certification:

    Active Member

Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China.   Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop se... Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China.   Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop se...

+ Read More

Get in touch with us

  • Reach Us
  • Guangzhou Jet Scaffold & Formwork System Co., Ltd.
  • NO.3 Xintang Road,Guangzhou City,China
  • https://www.steelscaffoldingsystems.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement