Supply Ability | 80 ton per month |
Delivery Time | 10 - 15 days |
Packaging Details | Bags + Steel Pallet |
Material | Q235 |
Surface | Galvanized or Painted |
Application | Connect the steel tube |
Life Span | 3 - 5 years |
Color | Silver |
Size | 48.3 * 48.3mm |
Brand Name | JET |
Model Number | 48 * 48 mm scaffolding coupler |
Certification | SGS , BV , ISO9001 |
Place of Origin | Tian , China |
View Detail Information
Explore similar products
Professional Scaffolding Joint Coupler Electrogalvanizing Scaffold Tube Clamps
Steel Aluminum Perforated Expanded Metal Mesh Sheet Easy Installation
Durable Scaffolding Joint Coupler Scaffolding Putlog Coupler For Structure
Building Scaffolding Joint Coupler Scaffolding Pipe Clamp SGS Certification
Product Specification
Supply Ability | 80 ton per month | Delivery Time | 10 - 15 days |
Packaging Details | Bags + Steel Pallet | Material | Q235 |
Surface | Galvanized or Painted | Application | Connect the steel tube |
Life Span | 3 - 5 years | Color | Silver |
Size | 48.3 * 48.3mm | Brand Name | JET |
Model Number | 48 * 48 mm scaffolding coupler | Certification | SGS , BV , ISO9001 |
Place of Origin | Tian , China | ||
High Light | scaffolding putlog coupler ,drop forged swivel coupler |
Pressed couplers for scaffolding system, couplers for scaffolding parts EN/BS/SGS certificates
Scaffolding pipe clamp and parts, An important part of building strength to scaffold clamps in used close up on construction site,platforms for stage structure support.
Assembly with three advanced production line, the factory can produce 800,000 of couplers per month.
Our mill is strictly complying with EN74 class A and class B, BS1139, AS1576 and other domestic and international coupler standard and regulations, manufacturing various drop forged and pressed coupler like double coupler, swivel coupler, and other shaped couplers.
Specification
Item | JET |
Type | Drop forged double coupler |
Material | Q235 |
Size | 48.3mm*48.3mm |
Surface finish | Electro galvanzied |
Fastener type | Right-angle coupler, swivel coupler, connecting coupler |
Standard | EN74 / BS1139 |
Processing | Drop forged |
Sample | Free |
Application | For structure buliding |
Weight | 1.12-1.15kgs |
Packaging | Plastic bag & carton & pallet , as per as customer requirement |
OEM | Available |
Packing and payment
Packing | 1.Inner-Plastic Bag; Outer -Standard Carton Box. |
2. 6 plastic bags into one carton, then 13 cartons into one pallet | |
3. Carton size: 260*260*140mm | |
4.As your requirement | |
Port | FOB Tianjin |
Shipment | Our shipment will arrange the plan according to customer |
Sample Leadtime: | 3 days for pre-production samples |
Production Leadtime | Within 12-15 workdays after deposit or payment received |
Payment terms: | L/C, or 30% pre T/T 70% balance before shipment |
Service | Warm and quick response service provided by the professional Export Sales Team |
many years' experience in handling exports to the US, Europe,Japan and other countries and regions |
FAQ
1. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS System and building material for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
2. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
3. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
4. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler
(5) steel plank with hooks or without hooks.
(6) steel stair case
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2012
Total Annual:
8000000-10000000
Employee Number:
50~80
Ecer Certification:
Active Member
Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China. Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop se... Guangzhou Jet scaffolding&formwork system Co.,Ltd was established in 2012 in Guangzhou,China. Our company is an integrated and professional building materials supplier,specialized in the fields of scaffolding and formwork exporting from China.We are committed to become a one-stop se...
Get in touch with us
Leave a Message, we will call you back quickly!