Payment Terms | L/C, T/T, D/P, D/A |
Supply Ability | 18,000 square meter per month |
Delivery Time | 95 days |
Packaging Details | containers |
Material: | carbon structural steel |
Surface Treatment: | Painting Or Hot-dip Galvanize |
Project Solution Capability: | 3D model design, total solution for projects, Others |
Application: | Warehouse, Workshop, Factory Building |
Service Life: | 50 Years |
Type: | Large Span Easy Assemble Steel Warehouse |
Brand Name | LANGE |
Model Number | lg 1029 |
Place of Origin | HeBei China |
View Detail Information
Explore similar products
High Durability Premade Steel Buildings Dismountable Metal Workshop Building
Anti Rust Farmhouse Steel Structure Workshop Modular Prefab Factory Building
Professional Industrial Q235 Warehouse Steel Structure Prefabricated
Q235 Bolted Galvanized Carbon Steel Structure Warehouse Construction
Product Specification
Payment Terms | L/C, T/T, D/P, D/A | Supply Ability | 18,000 square meter per month |
Delivery Time | 95 days | Packaging Details | containers |
Material: | carbon structural steel | Surface Treatment: | Painting Or Hot-dip Galvanize |
Project Solution Capability: | 3D model design, total solution for projects, Others | Application: | Warehouse, Workshop, Factory Building |
Service Life: | 50 Years | Type: | Large Span Easy Assemble Steel Warehouse |
Brand Name | LANGE | Model Number | lg 1029 |
Place of Origin | HeBei China | ||
High Light | Prefabricted Steel Structure Workshop ,Steel Structure Workshop Q355B ,Q355B Pre Engineered Metal Building House |
1. Manufacturing aspect: steel frame building is simple, the construction period is short, components are prefabricated in the factory, the site only needs assemble as per construction drawings, greatly shorten the construction time.
2. Appearance: steel structure warehouse building design is beautiful and practical, with simple and smooth lines. Colorful wall panels are available in a variety of colors, and the walls can also be made of other materials, which are more flexible.
3. Economic aspects: the cost of steel structure workshop is reasonable, lightweight, reduce the cost of the foundation, fast construction, comprehensive economic benefits are greatly better than the concrete building.
Dimension | Length x Width x Eave height/ Ridge height |
Frame type | Portal frame, multi-story frame |
Main frame | Hot-rolled or Welded H beam and column, Q355B steel |
Bracing components | Tie bar, staying bar, Horizontal bracing, Column bracing |
Cladding system | Corrugated color steel sheet, sandwich panel with glass wool, rock wool,PU insulation |
Accessory | Ridge tile, trim, Gutter, Down pipe,skylight, clerestory |
Door | Sliding door, Roll up door, industrial section door, swing door |
Window | PVC window, aluminum window, metal louver |
My company has a large steel structure processing equipment, select high-quality plates, according to the national standards of manufacturing series of products,to meet the needs of the various types of steel structure engineering.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2020
Total Annual:
1000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Dongguang Lange Equipped Housing Co., Ltd. is a comprehensive company with large scale, specializing in steel structure designing, production and installation. Our company has various kinds of products including prefabricated house, warehouse, workshop, garage, poultry feeding buildings, contai... Dongguang Lange Equipped Housing Co., Ltd. is a comprehensive company with large scale, specializing in steel structure designing, production and installation. Our company has various kinds of products including prefabricated house, warehouse, workshop, garage, poultry feeding buildings, contai...
Get in touch with us
Leave a Message, we will call you back quickly!