Payment Terms | L/C, T/T |
Supply Ability | 15,000 square meter per month |
Delivery Time | 45 days |
Packaging Details | containers |
Product Name: | Steel structure building low cost office hotel factory Workshop Traditional |
Type: | Steel structure |
Project Solution Capability: | 3D model design, total solution for projects, Others |
Application: | Workshop, Prefab Buildings Etc |
Main material: | Steel Structure Frames |
Structure: | 50 square meters |
Brand Name | Lange |
Place of Origin | HeBei China |
View Detail Information
Explore similar products
OEM ODM Insulation Pre Engineered Metal Buildings Multi Storey Steel Frame
50M2 Prefab Metal Shop Buildings PU Insulation Prefab Steel Workshop With
Single Ridge QB355 Prefab Steel Construction Double Span Pre Manufactured
EPS XPS PU Panel Prefab Steel Construction Cold Formed Light Gauge Steel
Product Specification
Payment Terms | L/C, T/T | Supply Ability | 15,000 square meter per month |
Delivery Time | 45 days | Packaging Details | containers |
Product Name: | Steel structure building low cost office hotel factory Workshop Traditional | Type: | Steel structure |
Project Solution Capability: | 3D model design, total solution for projects, Others | Application: | Workshop, Prefab Buildings Etc |
Main material: | Steel Structure Frames | Structure: | 50 square meters |
Brand Name | Lange | Place of Origin | HeBei China |
High Light | Lightweight Prefab Steel Construction ,Q355B Prefab Steel Construction ,Q355B Prefab Auto Repair Shop |
1. The steel structure warehouse is quickly assembled. The construction of normal buildings will take at least a few months. The steel structure warehouse is very fast and easy to install. All drilling, cutting and welding are carried out on the production site. Then send the components to the construction site for assembly. In addition to the short const
2. The steel structure warehouse is composed of the main frame, which is connected by H-shaped beams, supports, walls and roof Pur bars, roof and walls, and uses various panels that overlap with other components (such as doors and windows) for connection. The steel structure workshop has the advantages of large span, high strength, light weight, low cost, temperature protection, energy saving, beautiful appearance, short construction time, good insulation effect, long service life, space saving, and good seismic performance. Flexible layout, etc.
Dimension | Length x Width x Eave height/ Ridge height |
Frame type | Portal frame, multi-story frame |
Main frame | Hot-rolled or Welded H beam and column, Q355B steel |
Bracing components | Tie bar, staying bar, Horizontal bracing, Column bracing |
Cladding system | Corrugated color steel sheet, sandwich panel with glass wool, rock wool,PU insulation |
Accessory | Ridge tile, trim, Gutter, Down pipe,skylight, clerestory |
Door | Sliding door, Roll up door, industrial section door, swing door |
Window | PVC window, aluminum window, metal louver |
My company has a large steel structure processing equipment, select high-quality plates, according to the national standards of manufacturing series of products,to meet the needs of the various types of steel structure engineering.
Company Details
Business Type:
Manufacturer,Distributor/Wholesaler,Exporter
Year Established:
2020
Total Annual:
1000000-5000000
Employee Number:
100~200
Ecer Certification:
Verified Supplier
Dongguang Lange Equipped Housing Co., Ltd. is a comprehensive company with large scale, specializing in steel structure designing, production and installation. Our company has various kinds of products including prefabricated house, warehouse, workshop, garage, poultry feeding buildings, contai... Dongguang Lange Equipped Housing Co., Ltd. is a comprehensive company with large scale, specializing in steel structure designing, production and installation. Our company has various kinds of products including prefabricated house, warehouse, workshop, garage, poultry feeding buildings, contai...
Get in touch with us
Leave a Message, we will call you back quickly!