Payment Terms | L/C, T/T, Western Union, MoneyGram |
Supply Ability | 20sets/month |
Delivery Time | 5-60days |
Packaging Details | 20GP/40GP container |
Name | Light Gauge Steel Frame Truss Steel Villa House Frame Roll Forming Machine |
Condition | New |
Weight | 3.5 ton |
Use | Roof |
Production Capacity | 60m/min |
Power(W) | 7.5+5.5kw |
Warranty | 2years |
Rolling thickness | 0.7mm-1.2mm |
Key Selling Points | High Productivity |
Brand Name | CHBEST |
Model Number | YX-C89 |
Certification | CE,BV,SGS |
Place of Origin | Hebei,China |
View Detail Information
Explore similar products
Automatic Change Size Stud And Track Roll Forming Machine Main Channel Drywall
Drywall Partition C U Profile Metal Stud And Track Roll Forming Machine PLC
Ceiling Drywall Stud And Track Roll Forming Machine Line 15m/min - 30m/min Speed
Steel Wall Angle Bar Cold Roll Forming Machine L Shape Bead Perforated
Product Specification
Payment Terms | L/C, T/T, Western Union, MoneyGram | Supply Ability | 20sets/month |
Delivery Time | 5-60days | Packaging Details | 20GP/40GP container |
Name | Light Gauge Steel Frame Truss Steel Villa House Frame Roll Forming Machine | Condition | New |
Weight | 3.5 ton | Use | Roof |
Production Capacity | 60m/min | Power(W) | 7.5+5.5kw |
Warranty | 2years | Rolling thickness | 0.7mm-1.2mm |
Key Selling Points | High Productivity | Brand Name | CHBEST |
Model Number | YX-C89 | Certification | CE,BV,SGS |
Place of Origin | Hebei,China | ||
High Light | 1.2mm steel roll forming machine ,high productivity steel roll forming machine ,longlife light gauge steel framing machines |
Light Gauge Steel Frame Truss Steel Villa House Frame Roll Forming Machine
1. Components of China prefab house light steel keel roll forming machine
NO. | Name | Quantity | ||
1 | Uncoil | 1 | ||
2 | Roll forming machine | 1 | ||
3 | Haydraulic puncher/cutter | 6 | ||
4 | Controlling system | 1 | ||
5 | Lable printer | 1 | ||
6 | Layout table | 1 | ||
7 | Hydraulic station | 1 | ||
8 | Design software | 1 |
2. Machine Parameters of China prefab house light steel keel roll forming machine
No. | Item | Specification | ||
1 | Profile demension | C75*38*9mm | ||
2 | Feeding width | 160mm | ||
3 | Raw material | G300-G550 GI/GL strip (G450 recommended) | ||
4 | Thickness range | 0.6-1.2mm | ||
5 | Machine dimensions | 3700*800*1100mm | ||
6 | Machine weight | 2.5T | ||
7 | Forming method | 9steps | ||
8 | Drive mode | Gear + sprocket | ||
9 | Main motor | 7.5kw servo motor | ||
10 | Roller ,puncher and cutting bladee material | SKD11 | ||
11 | Main shaft material | 40Cr | ||
12 | Forming speed | 2700m/hour | ||
13 | Punch tolerance | ±0.5mm | ||
14 | Cutting tolerance | ±0.75mm | ||
15 | Hydraulic motor power | 7.5kw |
3. Product information
* MF steel machine qualified electrical inspection and marking electrical switch logo
* The certificate of MF steel machine
* Qualified hydraulic personnel to test and mark the hydraulic switch logo
* MF steel machine setting table
* Quality check list of decoiler
* A list of the parts of the kit
* Electrical field installation checklist
* Electrical circuit diagram
* Hydraulic circuit diagram
* Electrical circuit diagram of the decoiler
* Spare parts description
4. Payment terms and after-sale service:
1) FOB Tianjin / CIF your port
2) Payment: 30% T/T deposit, and pay the balance before shipping.
3) Delivery time: 60 working days.
4) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
5) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
6) Installation and training:
1. If buyers visit our factory and check the machine, we will teach you how to install and us the machine, and also train your workers/technician face to face.
2. Without visiting, we will send you user manual to teach you to install and operate.
3. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 100 one man one day). To the seller’s appointed account by T/T before the seller’s technicians go to the buyer’s factory. The buyer pays the seller’s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
Different Software Optional
You can choose different software, which reduces your investment risk
Company Details
Business Type:
Manufacturer,Exporter
Year Established:
2015
Total Annual:
10000000-20000000
Employee Number:
30~50
Ecer Certification:
Verified Supplier
Cangzhou Best Machinery Co., Ltd set up in 2015, with great power in production and techniques, we are a leading manufacturer of roll forming machines in North of China.We have two workshops more than 4000 square meters, and have own processing machines and design engineer, so that can control machi... Cangzhou Best Machinery Co., Ltd set up in 2015, with great power in production and techniques, we are a leading manufacturer of roll forming machines in North of China.We have two workshops more than 4000 square meters, and have own processing machines and design engineer, so that can control machi...
Get in touch with us
Leave a Message, we will call you back quickly!