Payment Terms | T/T, L/C at sight |
Supply Ability | 300pcs per day |
Delivery Time | 20 working days after received your payment |
Packaging Details | As customer request |
Product Name | Galvanized Steel Pole |
Wind Speed | 160KM/H |
Welding standard | AWS D 1.1 |
Design | Customized |
Material | Q235 |
Lift time | 50 years |
Warranty | 15 years |
Brand Name | MilkyWay |
Model Number | Galvanized Steel Pole |
Certification | ISO9001/BV/ |
Place of Origin | China |
View Detail Information
Explore similar products
15M Transmission Line Galvanized Steel Pole With Third Party Certificate
60ft Type Hs Ht Ngcp Standard Galvanized Steel Pole With 4-5mm Thickenss
Electrical Hot Dip Galvanized Steel Pole , Anticorrosive Power Line Pole
6m Hot Dip Galvanized Steel Pole Electric For Power Transmission Line
Product Specification
Payment Terms | T/T, L/C at sight | Supply Ability | 300pcs per day |
Delivery Time | 20 working days after received your payment | Packaging Details | As customer request |
Product Name | Galvanized Steel Pole | Wind Speed | 160KM/H |
Welding standard | AWS D 1.1 | Design | Customized |
Material | Q235 | Lift time | 50 years |
Warranty | 15 years | Brand Name | MilkyWay |
Model Number | Galvanized Steel Pole | Certification | ISO9001/BV/ |
Place of Origin | China | ||
High Light | galvanised steel poles ,steel transmission poles |
6 Sides 4-15m Powder Coating Galvanized Steel Pole with One Cross Arm
Specifications:
Height | 4 m~15 m |
Max length per section | 14 m |
Thickness | 2.5mm~30 mm |
Shape | Conical or polygongal tapered |
Material | Q235B/A36/A283 M Gr.C /SS400/S235 JR/St 37-2 /Fe 360 |
Lamp Power | 9 W~800 W (HPS/MH) |
Electroshock resistant protective grade | Grade Ⅰ |
Finish | hot dipgalvanization ,blasting,powder coating ,painting |
Galvanization standard | ASTMA 123 / EN ISO 1461 |
Welding | AWS D 1.1 /BS EN 1011-1,BS EN 1011-2 |
Joint of Poles | Insert mode,innerflange mode,face to face joint mode |
Design of pole | Against earthquake of 8 grade |
Production Flow:
The production process:Row material test → Cutting →Molding or bending →Welding (longitudinal )→Dimension verify →Flange welding→Hole drilling →Calibration → Deburr→Galvanization or powder coating ,painting →Recalibration →Thread →Packages
Installation
-Remove all the equipment on the pole during Assembly.
-Circle a sling around th epole shaft of each section.
-Fix the sling on top section to one pulley block.
-The sling on the bottom section is tightly fixed and fixed at the center of gravity.
-Make the steel pole vertical by tighten the sling of the top section.
-Fix the steel pole.
-Remove the sling.
Company Introduction:
JiangSu Milky Way Steel Poles Co., Ltd.was established in 1988, is located in Yixing City, Jiangsu Province, Wan Shi Town, covering an area of 35,000 square meters, annual output value reached 200 million . We have 20 years experience in design and production. Our main products are power pole, communication towers, street lighting poles, steel bracket and so on. The company has strong technical force, advanced production equipment, perfect quality management system, product quality has reached international advanced level.
Company Details
Business Type:
Manufacturer,Exporter,Trading Company
Year Established:
1989
Employee Number:
100~500
Ecer Certification:
Verified Supplier
Estbilsed in 1989,Jiangsu Milky Way Steel Poles is located in Wuxi,East of China ,near one of the largest sea port of China ,Shanghai,Port . Our Products have been widely used in the power transmsion ,signal transmission and ligting for street ,road ,square ,palaestra.and so on We have p... Estbilsed in 1989,Jiangsu Milky Way Steel Poles is located in Wuxi,East of China ,near one of the largest sea port of China ,Shanghai,Port . Our Products have been widely used in the power transmsion ,signal transmission and ligting for street ,road ,square ,palaestra.and so on We have p...
Get in touch with us
Leave a Message, we will call you back quickly!