Payment Terms | L/C, T/T, Western Union |
Supply Ability | 21000MT Per Month |
Delivery Time | 2-4 months dependingly |
Packaging Details | Seaworthy framed packings for either container or break bulk vessel etc |
Color | Gray or white etc customized |
Material | normal or low temperature impacted steels |
Grade | ASTM A36, A572, SM490, Q355, Q235 etc |
Surface | high anti-corrosion painted or galvanized |
Standard | US, Europe, Australia, UK Britain etc. |
Brand Name | FAMOUS-KNSN |
Model Number | Famous-Boiler |
Certification | ISO9001, AWS D1.1 and EN1090 etc |
Place of Origin | Zhejiang China |
View Detail Information
Explore similar products
Galvanized Drywall Steel Channel Gypsum Board Metal Stud And Track Main Tee
Interior Galvanized Metal Stud And Track Light Gauge Hat Sections Wall Framing
Light Guage Galvanised Studs Steel Building Rebar Processing Interior H Section
Grid Ceiling System Metal Steel Fabrication T Profile Main T And Cross T Wall
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 21000MT Per Month |
Delivery Time | 2-4 months dependingly | Packaging Details | Seaworthy framed packings for either container or break bulk vessel etc |
Color | Gray or white etc customized | Material | normal or low temperature impacted steels |
Grade | ASTM A36, A572, SM490, Q355, Q235 etc | Surface | high anti-corrosion painted or galvanized |
Standard | US, Europe, Australia, UK Britain etc. | Brand Name | FAMOUS-KNSN |
Model Number | Famous-Boiler | Certification | ISO9001, AWS D1.1 and EN1090 etc |
Place of Origin | Zhejiang China | ||
High Light | mild steel metal fabrication ,metal and steel fabrication ,steam boiler fabricators |
Industrial Steam Boiler and Thermal Oil Boiler Tank Metal Steel Fabrication
Overview of the production of various boiler tanks:
This boiler tank is to ensure the normal supply of steam and avoid boiler shutdown due to equipment maintenance. In addition, the site is small, and the finished boiler tank is not easy to install. It must be fabricated and installed on site. The specific size and material of the boiler tank are shown in the drawings.
Specification:
Product Name | Pure Europe Standard Hot Rolled H Beam Steel in Wide Flange Universal Beams UB Universal Columns UC |
Standard | GB/T11263-2010 |
Types | HDGI,PPGI,PPGL |
Material Grade | Q235B,SM490,SS400,Q345B,Q345,etc |
Technique | Hot rolled/welded |
Height | 100-900mm |
Width | 50-400mm |
Web thickness | 5-30mm |
Flange thickness | 7-40mm |
Tolerance | 2-3% |
Surface Treatment | 1),Bared 2),Black painted (varnish coating) 3),Galvanized |
Safety measures
1. Establish and improve the safety system. Before entering the site, the branch will organize the construction personnel to conduct safety education, strengthen the awareness of safety and quality, do all kinds of preparations carefully, inspect the construction site, and formulate the production and installation plan for the coal slurry tank task. . Ensure that the quality of the project is completed on time and with quality. A full-time security officer must be set up when entering the venue.
2. The construction area should be set up with hard closed enclosures and eye-catching warning signs. Non-construction personnel are not allowed to enter the construction area. All materials are neatly placed and kept in a centralized manner.
3. Electric welding equipment shall be clearly marked with fire and explosion-proof measures.
4. Lifting and lifting equipment and tools are managed by special personnel, and they can be used only after they are confirmed to be safe. The length and diameter of the wire rope used in the dismantling and hoisting of large pieces should be selected reasonably.
5. The construction personnel shall clarify various safety matters in the operation, and strictly abide by the safety technical regulations and operation regulations. When the installation may pose a danger to the safety of the surrounding adjacent buildings, corresponding protective measures must be taken to evacuate and resettle people in the building.
6. Operators entering the site must wear safety protective equipment, and it is strictly forbidden to work after drinking.
7. When the construction is stopped, the power supply should be cut off. After checking the site to confirm that there are no unsafe factors, you can leave. Unsafe factors found during construction should be eliminated in time, otherwise the operator has the right to refuse the operation.
9. Before installation, the construction unit should check the conditions of various pipelines in the building, and confirm that they are all cut off before construction. During the demolition work, if unsafe factors are found, the construction should be stopped, corresponding emergency measures should be taken, the site should be protected, and the relevant departments should be reported in a timely manner.
10. Strengthen the lighting during construction at night, and assign special personnel to supervise and coordinate with each other when operating up and down. Do not throw things down arbitrarily.
11. According to the working environment of the demolition project construction site, corresponding fire safety measures should be formulated.
Fire truck passages should be set up on the construction site to ensure sufficient fire water sources. The waste oil and waste on site shall not be randomly discharged, and shall be disposed of together. When there is serious oil pollution on site, sufficient fire extinguishing equipment should be provided to do a good job of fire prevention and anti-skid work.
12. All kinds of equipment and materials should be stacked neatly, and the remaining materials should be cleaned up in time.
13. During installation, it is strictly forbidden for people to gather or stack materials on the platform. The operator should stand on a stable structure or scaffolding to operate, and should be equipped with safety ropes when working at heights.
14. After the construction is completed, clean the site so that the work is completed, the materials are exhausted, and the site is cleared.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company,Seller
Year Established:
2002
Total Annual:
80000000-100000000
Employee Number:
1200~1500
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!