Payment Terms | L/C, T/T, Western Union |
Supply Ability | 10000MT Per Month |
Delivery Time | 2-3 months dependingly after detailing shop drawings |
Packaging Details | Seaworthy framed packings for either container or break bulk vessel etc |
Color | gray or customized |
Material | normal or low temperature impacted steels |
Grade | S275, S355JR, A572, SM490, Q355, Q235 etc |
Surface | painted or galvanized |
Standard | US, Europe, Australia, UK Britain etc. |
Application | Equipment Platform |
Brand Name | FAMOUS-KNSN |
Model Number | Famous-Equip. |
Certification | ISO9001, AWS D1.1 and EN1090 etc |
Place of Origin | Zhejiang China |
View Detail Information
Explore similar products
Galvanized Drywall Steel Channel Gypsum Board Metal Stud And Track Main Tee
Interior Galvanized Metal Stud And Track Light Gauge Hat Sections Wall Framing
Light Guage Galvanised Studs Steel Building Rebar Processing Interior H Section
Grid Ceiling System Metal Steel Fabrication T Profile Main T And Cross T Wall
Product Specification
Payment Terms | L/C, T/T, Western Union | Supply Ability | 10000MT Per Month |
Delivery Time | 2-3 months dependingly after detailing shop drawings | Packaging Details | Seaworthy framed packings for either container or break bulk vessel etc |
Color | gray or customized | Material | normal or low temperature impacted steels |
Grade | S275, S355JR, A572, SM490, Q355, Q235 etc | Surface | painted or galvanized |
Standard | US, Europe, Australia, UK Britain etc. | Application | Equipment Platform |
Brand Name | FAMOUS-KNSN | Model Number | Famous-Equip. |
Certification | ISO9001, AWS D1.1 and EN1090 etc | Place of Origin | Zhejiang China |
High Light | metal platform fabrication ,aluminium and steel fabrication ,Aluminium Stainless Steel Platform FAMOUS-KNSN |
Industrial Machinery Work Platforms Metal Equipment Platform Steel Frame Fabrication
As the professional foreign standards metal steel fabricator, we are quite capable to fabricate various machinery &equipment platform steel framing based on either EU-US or UK AU etc standard and requirement.
Large-scale industrial equipment platform steel structure frame manufacturing process and production process:
With the development of economy and society, the need for large-scale equipment in production is also constantly developing. At the same time, the development of society and economy and the progress of science and technology have provided the possibility for the manufacture of these large-scale equipment. However, the manufacturing process of large-scale equipment is quite complicated. In addition to electronic, hydraulic and other components, the manufacturing of its own structure is also quite complicated, accounting for a considerable proportion of the entire equipment. Based on the structure of the equipment itself, this article will explain the complex production process in detail from the manufacturing process and production process.
1. The first step in the production of equipment steel structure is to dismantle the drawing and blanking
The blanking process is to process the steel plate or profile into the required parts. The blanking process is mainly divided into three types: blanking of steel plates, blanking of profiles and receiving of remaining materials. As the first step in structure production, dismantling and blanking is the essence of technical support for production and a reliable basis for raw material procurement. Therefore, in this process, as a technician, you must consider the drawings in an all-round way, and take into account the craftsmanship of the production, which is the most beneficial to the production. The following points must be paid attention to during the unloading process:
(1) To correctly grasp the drawings, we must conduct a comprehensive review to ensure that the understanding and grasp of the drawings are correct;
(2) When making the material list, you must pay attention to the number and material of the plates, and the material drawing should be correct (mainly refers to the size of the material drawing, because the size of the material drawing should consider the craftsmanship, for example, the size of the material should be considered welding shrinkage, machining, etc.);
(3) The splicing of the remaining material must comply with the specifications corresponding to the drawings, especially the welding;
(4) For sheet blanking, when using plasma or CNC cutting, the cutting machine must be corrected before cutting to ensure the dimensional accuracy of the cut sheet;
(5) For the pretreatment of the welding groove, after the groove is processed, it must be cleaned to ensure the completion of this process, and do not bring unnecessary troubles to the next process;
(6) For hole processing, holes are generally divided into pre-drilling and post-weld drilling. Therefore, in this process, the drawings must be carefully checked to distinguish the time point of hole processing;
Thickness | 1-16mm ,or based on design needs |
Load capacity | 0.5-200MT dependingly |
Surface | Painted or galvanized surface |
Characteristics | Anti-rust, Corrosion-protection |
Certificate | ISO9001, ISO3834, EN1090, AWS etc |
Guarantee period | Foreign standards QA QC process |
Delivery time | 30-90 days |
Sample | Free sample upon client’s payment to air express |
REMARK |
OEM&ODM etc customized service offered |
2. Assembly and welding of equipment steel structure production, that is, riveting and welding stage. The assembly process is to assemble the finished materials into the required components or pre-assembled parts according to the requirements of the drawings. After the assembly is completed, the welding shall be carried out, and the welding shall be carried out according to the welding specification requirements corresponding to the drawings. This project is collectively referred to as riveting welding.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company,Seller
Year Established:
2002
Total Annual:
80000000-100000000
Employee Number:
1200~1500
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!