Payment Terms | L/C,T/T |
Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs |
Packaging Details | Seaworthy packings into container or bulk vessel |
Grade | , S355, Grade 300, ASTM A572 etc |
Dimensions | Costomized |
Type | H-beam column |
Application | Residential building |
Surface treatment | Galvanized |
Brand Name | FASEC |
Model Number | OWN |
Certification | ISO9001:2008, SGS, etc. |
Place of Origin | Hangzhou |
View Detail Information
Explore similar products
Q345b Prefabricated Library Stadium Steel Structure Commercial Building
Solar Powered BIPV Glass Facade Curtain Wall Green Power Photovoltaic Building
Fabricated Steelworks Experiences Steel Structural Industrial Building Q345b
Prefabricated High Rise Building Project Steel Frame Metal Plasma Oxyfuel
Product Specification
Payment Terms | L/C,T/T | Supply Ability | 600,000 tons per Year |
Delivery Time | Based on client's needs | Packaging Details | Seaworthy packings into container or bulk vessel |
Grade | , S355, Grade 300, ASTM A572 etc | Dimensions | Costomized |
Type | H-beam column | Application | Residential building |
Surface treatment | Galvanized | Brand Name | FASEC |
Model Number | OWN | Certification | ISO9001:2008, SGS, etc. |
Place of Origin | Hangzhou | ||
High Light | FASEC mid rise low rise Steels Constructions ,FASEC mid rise low rise Steels Buildings Construction ,mid rise low rise Steels Building Constructions FASEC |
Building a high rise or any multi-level building demands the use of light-weight yet strong materials. Steel, by virtue of its high strength to weight ratio enables large spans and light weight construction. Steel structures can have a variety of structural forms like braced frames and moment resistant frames suitable to meet the specific requirements of higher buildings. Taller buildings also face higher wind loads, and hence steel being flexible, allows the building to move and deflect with the wind forces, rather than making it rigid like concrete.
Material: | specification: |
Length | As customer's requirement |
Width | As customer's requirement |
Height | As customer's requirement |
Column | H shaped, S355, Grade 300, ASTM A572 etc |
Beam | H shaped, S355, Grade 300, ASTM A572 etc |
Purline | C/Z shaped,Q235/Q345 |
Brace | Round bar,Q235 |
Knee brace | Steel angle,Q235 |
Tie bar | Steel round tube,Q235 |
Roof panel | single steel sheet /sandwich panel/UPVC Panel |
Building tall with steel also allows more floors per total height of the building. This is due to the fact that the building structure in steel is lighter and more efficient, and has beams and that are not required to be as deep as those of concrete to support the floors. The ability to have lighter sections, allowing the same load bearing capacity per floor, allows space for almost 1.5 extra floors in the same overall external height of the building.
Pre-engineered steel systems, that are our specialty, allow further optimization and further efficiency in multistory steel building design. Delving into the mechanics of high rise building construction, we see that the introduction of hot rolled steel sections, using higher grade steel add more strength to the building. Better steel decking as a construction material brought about a revolution in the steel building space. Composite steel decking laid on each floor adds ability to transfer lateral loads more effectively through the structure aiding the structure to be stronger than conventional rigid materials. This added strength per floor allows the overall core steel structure to be lighter and even more efficient. High-rise frames are constructed of H-columns or box columns, (vertical-support members) and H-beams (horizontal-support members). Cross bracing or shear walls are used to provide a structural frame with greater lateral rigidity in order to withstand wind stresses.
Company Details
Business Type:
Manufacturer,Importer,Exporter,Trading Company,Seller
Year Established:
2002
Total Annual:
80000000-100000000
Employee Number:
1200~1500
Ecer Certification:
Verified Supplier
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are... As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry. Nowadays, under FASECBuildings Group, there are...
Get in touch with us
Leave a Message, we will call you back quickly!